Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/10/2018 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 10/04/2018 |
ENGR Engineering Final
|
DROBERTS |
Not ready for Inspection |
Entered by DROBERT5 - COMPLETE ALL SITE WORK PRIOR TO CALLING IN FOR THE FINAL INSPECTIONS |
| 10/10/2018 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 10/09/2018 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by DROBERT5 - COMPLETE ALL SITE WORK AS SHOWN ON THE APPROVED PLANS.
1) REMOVE ALL ROLL OFF BINS FROM THE SITE
2) COMPLETE THE STAKING OF THE TREES ANS SHOWN ON THE APPROVED PLANS. REMOVE ALL NURSARY STAKES AS NEEDED FROM TREES AND STAKE ACCORDINGLY AS NEEDED THROUGHOUT THIS SITE.
3) INSTALL HYDROSEE OR D.G. IN ALL AREAS WHERE THE SOILS HAVE BEEN DISTURBED. THIS WILL INCLUDE THE AREA OF THE DRAINAGE EASEMENT ON THE NORTHSIDE, AS WELL AS THE VACANT LOT ALONG THE WEST SIDE OF THIS SITE.
4) COMPLETE THE TRASH ENCLOSURE AS SHOWN ON THE APPROVED PLANS. THIS WILL INCLUDE THE DRILLING OF THE PIN HOLES IN THE CONCRETE IN THE CLOSED POSITION.
5) REMOVE ALL EXCESS MATERIAL AND CONCRETE SPOILS FROM THE VACANT LOT ON THE WEST SIDE OF THE IS PROPERTY AND PLACE D.G. OR HYDROSEED AS NOTED IN ITEM NUMBER 3. |
| 10/04/2018 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by DROBERT5 - COMPLETE ALL SITE WORK PRIOR TO CALLING IN FOR THE FINAL |
| 09/20/2018 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |