Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
10100 E GOLF LINKS RD
Apply Date:
10/05/2017
Applicant:
David Gary Gerovac
Description:
RESTRICTED SITE - SITE/GRADING/SWPPP - SORRENTO SQUARE LEMAN ACADEMY

Permit Reviews

Permit Number - DP17-0246
Permit Status: Complete
Permit Description: RESTRICTED SITE - SITE/GRADING/SWPPP - SORRENTO SQUARE LEMAN ACADEMY
Start Date Submittal Complete Date Status  
01/05/2018 DEV PKG - RESUBMITTAL 01/18/2018 COMPLETED Review Details
10/05/2017 SITE and/or GRADING 10/09/2017 COMPLETED Review Details
10/10/2017 DEV PKG 12/15/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0246
Permit Description: RESTRICTED SITE - SITE/GRADING/SWPPP - SORRENTO SQUARE LEMAN ACADEMY
Total Completed Inspections - 9
Date Description Inspector Results Comments
01/23/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/23/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/28/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 02/28/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MAINTAIN SEDIMENT CONTROLS PER YOUR SWPPP} ; {Activity date: 01/23/2018; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTAL AND USE A STABILIZED CONSTRUCTION ENTRANCE
2) ENSURE YOUR SWPPP AND NOI IS AVAILABLE ON SITE OR A POINT OF CONTACT
3) MAINTAIN YOUR SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION AND DOCUMENT STORM WATER INSPECTIONS
4) SWEEP UP TRACKED SOIL AS NEEDED}
10/26/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/26/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
10/26/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 10/26/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
10/26/2018 SITE - Stormwater Follow-up Passed {Activity date: 10/26/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 10/17/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 09/07/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/20/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 07/25/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 07/23/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 07/10/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 06/21/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE AP SWPPP PLANS ON SITE FOR INSPECTION.} ; {Activity date: 03/28/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/28/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - REMOVE SOIL FROM WADDLE ALONG SOUTH SIDE OF PROJECT}
10/26/2018 ENGR Grading Final Passed {Activity date: 10/26/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
10/26/2018 SITE - Stormwater Final Inspection Passed {Activity date: 10/26/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
10/26/2018 COT - ENGR - Signage Final Passed {Activity date: 10/26/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
11/02/2018 ENGR Engineering Final Passed {Activity date: 11/02/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by QJONES1 - APPROVED PER ENGINEERING FINAL} ; {Activity date: 10/26/2018; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET ALL NOTES FROM 10-04-2018 FOR FINAL.}