Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/02/2018 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by QJONES1 - APPROVAL SENT TO RECORDS |
| 11/01/2018 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO GRADING ACTIVITY AT THIS TIME. |
| 10/26/2018 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - COMPLET ALL NOTES FROM 10-04-2018 FOR FINAL. |
| 10/04/2018 |
ENGR Engineering Final
|
bbenedo1 |
Denied |
Entered by BBENEDO1 - Met with Dave and Willy on site.
Required corrections are;
Five accessible spaces exceed the max allowed slope.
Rain drains that discharge onto accessible building entrance.
Water ponding in accessible route where sidewalk meets pavement.
Access ramp reqires a hand rail.
Water harvesting planters spilling dirt into parking lot.
Vacant east lot requires controls. |
| 07/30/2018 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER WORK TO COMPLET FOR TCO . A LOT OF WORK NEEDS TO BE COMPLETED TO BE ABLE TO SEPARATE CONSTRUCTION FROM STUDENTS ( SAFELY). |
| 11/02/2018 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by QJONES1 - APPROVED PER ENGINEERING FINAL |
| 10/26/2018 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |