Permit: DP17-0246

Parcel: 136129420

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
11/02/2018 ENGR Engineering Final RLEDONNE Approved Entered by QJONES1 - APPROVAL SENT TO RECORDS
11/01/2018 ENGR Engineering Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY AT THIS TIME.
10/26/2018 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by RLEDONN1 - COMPLET ALL NOTES FROM 10-04-2018 FOR FINAL.
10/04/2018 ENGR Engineering Final bbenedo1 Denied Entered by BBENEDO1 - Met with Dave and Willy on site. Required corrections are; Five accessible spaces exceed the max allowed slope. Rain drains that discharge onto accessible building entrance. Water ponding in accessible route where sidewalk meets pavement. Access ramp reqires a hand rail. Water harvesting planters spilling dirt into parking lot. Vacant east lot requires controls.
07/30/2018 ENGR Engineering Final RLEDONNE Continued Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER WORK TO COMPLET FOR TCO . A LOT OF WORK NEEDS TO BE COMPLETED TO BE ABLE TO SEPARATE CONSTRUCTION FROM STUDENTS ( SAFELY).
11/02/2018 ENGR Engineering Final RLEDONNE Approved Entered by QJONES1 - APPROVED PER ENGINEERING FINAL
10/26/2018 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by RLEDONN1 - COMPLET ALL NOTES FROM 10-04-2018 FOR FINAL.