Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 02/28/2018 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Approved |
Entered by DROBERT5 - MAINTAIN SEDIMENT CONTROLS PER YOUR SWPPP |
| 01/23/2018 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Partial Approval |
Entered by DROBERT5 - 1) INSTAL AND USE A STABILIZED CONSTRUCTION ENTRANCE
2) ENSURE YOUR SWPPP AND NOI IS AVAILABLE ON SITE OR A POINT OF CONTACT
3) MAINTAIN YOUR SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION AND DOCUMENT STORM WATER INSPECTIONS
4) SWEEP UP TRACKED SOIL AS NEEDED |