Permit: DP17-0225
Permit Details
Status:
Complete
Type:
Development Package
Address:
1714 W SPEEDWAY BL
Address NEW:
1714 W SPEEDWAY BL
Apply Date:
09/11/2017
Applicant:
Kevin Petrick
Description:
SITE/GRADE - BRAKEMASTERS1st Revision approved 7/23/18 (sheet 1, 3,4 ,5 )
Permit Reviews
Permit Number - DP17-0225
Permit Status: Complete
Permit Description: SITE/GRADE - BRAKEMASTERS1st Revision approved 7/23/18 (sheet 1, 3,4 ,5 )
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/08/2018 | DEV PKG - RESUBMITTAL | 03/09/2018 | COMPLETED |
| 07/09/2018 | DEV PKG - REVISION | 07/09/2018 | COMPLETED |
| 07/09/2018 | DEV PKG - REVISION | 07/26/2018 | COMPLETED |
| 09/11/2017 | DEV PKG - OK TO SUBMIT | 09/11/2017 | COMPLETED |
| 09/11/2017 | DEV PKG | 10/27/2017 | COMPLETED |
| 10/27/2017 | DEV PKG - RESUBMITTAL | 12/18/2017 | COMPLETED |
| 12/18/2017 | DEV PKG - RESUBMITTAL | 03/08/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0225
Permit Description: SITE/GRADE - BRAKEMASTERS1st Revision approved 7/23/18 (sheet 1, 3,4 ,5 )
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/15/2018 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 03/15/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE, THEREFORE NO SWPPP IS REQUIRED, HOWEVER DUE TO THE PROXIMITY TO A REGULATED WASH SEDIMENT CONTROLS NEED TO PLACED ALONG THE EAST SIDE OF THE SITE 2) CALL FOR INSPECTION FOR TRASH ENCLOSURE FOOTINGS AND RE-BAR LAYOUT 3) ENSURE ELEVATION CERT PRIOR TO FINAL APPROVAL 4) ENSURE CERT. STATEMENT FROM THE ENG OF RECORD CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPING QUESTIONS OR CONCERNS} |
|
| 03/22/2018 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 03/22/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE ANY TRACKING OF SOIL OFF SITE IS SWEPT BACK ON SITE AS NEEDED} | |
| 12/18/2018 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 12/18/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 12/14/2018; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - Basins have been dug out.} ; {Activity date: 09/26/2018; Status: Not ready for Inspection; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - Spoke with Gary about plan specs, 12' Recessed area along front.} | |
| 12/18/2018 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 12/18/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 12/14/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 12/13/2018; Status: Partial Approval; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - contractor has preserved all but one tree due to existing damage} | |
| 12/18/2018 | SITE - Stormwater Follow-up | Passed | {Activity date: 12/18/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 12/14/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 12/13/2018; Status: Continued; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - Controls are still in place. No issues at this time.} ; {Activity date: 09/26/2018; Status: Continued; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - Controls in place, no issues at this time.} | |
| 12/18/2018 | SITE - Stormwater Final Inspection | Passed | {Activity date: 12/18/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 12/14/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - the work has not been completed but the stormwater controls are still in place.} | |
| 12/27/2018 | ENGR Engineering Final | Passed | {Activity date: 12/27/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 12/20/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Move access I'll over to avoid obstacle at sidewalk ramp. Install bicycle parking.} ; {Activity date: 12/18/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 12/14/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Spoke with Dale about remaining items including striping bicycle parking Landscaping and stabilization.} | |
| 12/27/2018 | ENGR Grading Final | Passed | {Activity date: 12/27/2018; Status: Approved; Inspector: bbenedop1; Comment: Entered by BBENEDO1 - } | |
| 12/27/2018 | COT - ENGR - Signage Final | Passed | {Activity date: 12/27/2018; Status: Approved; Inspector: bbenedop1; Comment: Entered by BBENEDO1 - } ; {Activity date: 12/18/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Ada parking signs not installed} ; {Activity date: 12/13/2018; Status: Not ready for Inspection; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - Please all for inspection when installing posts} |