Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 03/15/2018 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE, THEREFORE NO SWPPP IS REQUIRED, HOWEVER DUE TO THE PROXIMITY TO A REGULATED WASH SEDIMENT CONTROLS NEED TO PLACED ALONG THE EAST SIDE OF THE SITE
2) CALL FOR INSPECTION FOR TRASH ENCLOSURE FOOTINGS AND RE-BAR LAYOUT
3) ENSURE ELEVATION CERT PRIOR TO FINAL APPROVAL
4) ENSURE CERT. STATEMENT FROM THE ENG OF RECORD
CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPING QUESTIONS OR CONCERNS |