Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 12/14/2018 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 09/26/2018 |
ENGR Grading Final |
bbenedo1 |
Partial Approval |
Entered by BBENEDO1 - grading for concrete rear of building. |
| 12/18/2018 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 05/04/2018 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) TRASH ENCLOSURE WALL COMPLETED.
2) INSPECTION DONE BY BLDG INSPECTOR.
3) CALL FOR INSPECTION FOR ENCLOSURE PAD RE-BAR LAY OUT PRIOR TO CONCRETE. |
| 04/05/2018 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - RE-BAR LAY OUT AND FOOTING FOR TRASH ENCLOSURE INSTALLED PER APPROVED PLANS - OK TO COVER |
| 12/27/2018 |
ENGR Grading Final |
bbenedop1 |
Approved |
Entered by BBENEDO1 - |
| 12/27/2018 |
ENGR Grading Final |
bbenedop1 |
Approved |
Entered by BBENEDO1 - |