Permit: DP17-0153
Permit Details
Status:
Complete
Type:
Development Package
Address:
9070 E OLD VAIL RD
Address NEW:
9070 E OLD VAIL RD
Apply Date:
06/27/2017
Applicant:
Jason Morse
Description:
SITE/GRADING/SWPPP - RV STORAGE AND OFFICE
Permit Reviews
Permit Number - DP17-0153
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - RV STORAGE AND OFFICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/27/2017 | DEV PKG - OK TO SUBMIT | 06/27/2017 | COMPLETED |
| 06/27/2017 | DEV PKG | 08/25/2017 | COMPLETED |
| 08/25/2017 | DEV PKG - RESUBMITTAL | 09/22/2017 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0153
Permit Description: SITE/GRADING/SWPPP - RV STORAGE AND OFFICE
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/24/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 10/24/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CALL FOR RE-INSPECTION WHEN STORM WATER BIRM IS IN PLACE. 2) CALL FOR A FOLLOW UP INSPECTION TO APPROVE INSTALL OF SEDIMENT CONTROLS. 3) PROVIDE A PLAN SHOWING CHANGES TO NPPO} |
|
| 05/18/2018 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 05/18/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 05/18/2018 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/18/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 05/18/2018 | COT - ENGR - Signage Final | Passed | {Activity date: 05/18/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 06/22/2018 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 06/22/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/18/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MINOR LANDSCAPE CHANGES TO HAVE ALL PLANTS SHOWN ON THE PLAN PLANTED WITH IN THE BOUNDRY OF THE DEVELOPMENT, TO INCLUDE ALONG THE WEST SIDE. 2) COMPLETE LANDSCAPING PRIOR TO FINAL APPROVAL} ; {Activity date: 02/06/2018; Status: Continued; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - 1) NO CONCERNS WITH IRRIGATION INSTALLATION - OK TO COVER 2) ENSURE ALL CHANGES MADE TO THE APPROVED PLANS ARE ACCEPTED BY THE COT.} |
|
| 06/22/2018 | ENGR Grading Final | Passed | {Activity date: 06/22/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 06/22/2018 | SITE - Stormwater Final Inspection | Passed | {Activity date: 06/22/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/18/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE SITE IS 100% STABILIZED 2) FILE A NOTICE OF TERMINATION WITH ADEQ} |
|
| 06/27/2018 | ENGR Engineering Final | Passed | {Activity date: 06/27/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/18/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE PRE-WIRED W/ CODUIT AND STUBS FOR FUTURE PANELS ALONG DUPPORT BEAMS FOR COVERED PARKING - OK 2) LOOKED AT ROCK RIP RAP AREA ALONG NORTH SIDE OF SITE, WEIR AND BIRM - OK . ENSURE GUNITE AND/OR SHOT-CRETE IS INSTALLED PER PLAN 3) PROVIDE A CERT STATEMENT FROM THE EOR PRIOR TO FINAL APPROVAL} ; {Activity date: 02/08/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CIVIL PLANS SHOW INSTALL OF PRE-FAB METAL BLDGS ON A CONCRETE PAD, NO DETAIL PROVIDED. 2) CONTRACTOR PROVIDED A STRUCTUAL PLAN (TLCP STRUCTUAL ENGINEERING) FOR CONSTRUCTION OF THE BLDG PADS, HOWEVER THERE ARE NO COT STAMPS 3) INSTALLATION INCLUDED WIRE MESH WITH THREE #4 BARS HORIZONTAL ALONG BOTH SIDES OF THE PAD. FOOTINGS OR TOE DOWN IS 18"W BY 16" D. 4) PROVIDE EOR APPROVAL FOR METAL BLDG PAD CONSTRUCTION AND COT APPROVAL FOR RE-ENFORCEMENT INSTALLATION. 5) BULDINGS MAY REQUIRE A SEPARTE BLDG PERMIT.} |
|
| 04/13/2022 | SITE - Stormwater Follow-up | Passed | {Activity date: 04/13/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/26/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 05/18/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/23/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME} ; {Activity date: 02/08/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CIVIL PLANS SHOW INSTALL OF PRE-FAB METAL BLDGS ON A CONCRETE PAD, NO DETAIL PROVIDED. 2) CONTRACTOR PROVIDED A STRUCTUAL PLAN (TLCP STRUCTUAL ENGINEERING) FOR CONSTRUCTION OF THE BLDG PADS, HOWEVER THERE ARE NO COT STAMPS 3) INSTALLATION INCLUDED WIRE MESH WITH THREE #4 BARS HORIZONTAL ALONG BOTH SIDES OF THE PAD. FOOTINGS OR TOE DOWN IS 18"W BY 16" D. 4) PROVIDE EOR APPROVAL FOR METAL BLDG PAD CONSTRUCTION AND COT APPROVAL FOR RE-ENFORCEMENT INSTALLATION. 5) BULDINGS MAY REQUIRE A SEPARTE BLDG PERMIT.} ; {Activity date: 02/08/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO CONCERNS WITH IRRIGATION INSTALLATION - OK TO COVER 2) ENSURE ALL CHANGES MADE TO THE APPROVED PLANS ARE ACCEPTED BY THE COT.} ; {Activity date: 10/27/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - INSTALL SEDIMENT CONTROLS ALOG PERIMETER : 1) BIRM HAS BEEN INSTALLED ALONG THE NORTH PERIMETER OF THE SITE - ENSURE BIRM IS COMPACTED 2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE 3) CALL FOR RE-INSPECTION WHEN COMPLETED} ; {Activity date: 10/31/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - TRACKOUT MATERIAL HAS BEEN PLACED, ADDITIONAL STORMWATER MATERIALS AS THE GRUBBING OPERATION BEGINS TOMORROW.} |