Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/26/2018 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 06/22/2018 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - COMPLET ALL STABILIZTION PER AP PLANS AND RIP- RAP. COMPLET ALL STRIPING PER AP PLANS AND ADA SIGN. PROVIDE CERT LETTER FROM ENGINEER OF RECORD FOR ALL GRADING AND DRAINAGE. |
| 06/27/2018 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 05/18/2018 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SITE PRE-WIRED W/ CODUIT AND STUBS FOR FUTURE PANELS ALONG DUPPORT BEAMS FOR COVERED PARKING - OK
2) LOOKED AT ROCK RIP RAP AREA ALONG NORTH SIDE OF SITE, WEIR AND BIRM - OK . ENSURE GUNITE AND/OR SHOT-CRETE IS INSTALLED PER PLAN
3) PROVIDE A CERT STATEMENT FROM THE EOR PRIOR TO FINAL APPROVAL |
| 02/08/2018 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) CIVIL PLANS SHOW INSTALL OF PRE-FAB METAL BLDGS ON A CONCRETE PAD, NO DETAIL PROVIDED.
2) CONTRACTOR PROVIDED A STRUCTUAL PLAN (TLCP STRUCTUAL ENGINEERING) FOR CONSTRUCTION OF THE BLDG PADS, HOWEVER THERE ARE NO COT STAMPS
3) INSTALLATION INCLUDED WIRE MESH WITH THREE #4 BARS HORIZONTAL ALONG BOTH SIDES OF THE PAD. FOOTINGS OR TOE DOWN IS 18"W BY 16" D.
4) PROVIDE EOR APPROVAL FOR METAL BLDG PAD CONSTRUCTION AND COT APPROVAL FOR RE-ENFORCEMENT INSTALLATION.
5) BULDINGS MAY REQUIRE A SEPARTE BLDG PERMIT. |