Permit: DP17-0142
Permit Details
Apply Date:
06/19/2017
Applicant:
Description:
SITE/GRADING - CATERPILLAR SM&T HQ1ST REVISION APPROVED 8/20/18 (SHEETS 1, 6, 7, 9, 9A)2ND REV
Permit Reviews
Permit Number - DP17-0142
Permit Status: Issued
Permit Description: SITE/GRADING - CATERPILLAR SM&T HQ1ST REVISION APPROVED 8/20/18 (SHEETS 1, 6, 7, 9, 9A)2ND REV
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/19/2017 | DEV PKG - OK TO SUBMIT | 06/21/2017 | COMPLETED |
06/22/2017 | DEV PKG | 07/07/2017 | COMPLETED |
07/25/2017 | DEV PKG - RESUBMITTAL | 08/16/2017 | COMPLETED |
08/20/2018 | DEV PKG - REVISION | 08/31/2018 | COMPLETED |
10/08/2018 | DEV PKG - REVISION | 12/07/2018 | COMPLETED |
10/16/2017 | DEV PKG - RESUBMITTAL | 11/02/2017 | COMPLETED |
12/07/2018 | DEV PKG - REVISION | 12/07/2018 | COMPLETED |
12/22/2017 | DEV PKG - RESUBMITTAL | 01/09/2018 | COMPLETED |
Conditions
Permit Number - DP17-0142
Permit Status: Issued
Permit Description: SITE/GRADING - CATERPILLAR SM&T HQ1ST REVISION APPROVED 8/20/18 (SHEETS 1, 6, 7, 9, 9A)2ND REV
Date | Description | Comments |
---|---|---|
08/09/2017 | Provide documentation of sewer easement and construction easement removed/abandoned prior to issuance of building C of O. | |
08/09/2017 | Provide documentation of PIA for Avenida Del Convento and reflect plans in development package prior to issuance of building C of O as stated by 'design by separate plan' for Avenida Del Convento on sheet 4. | |
10/23/2017 | An Observation Permit from PC RWRD is required for any work within or adjacent to the existing Public Sewer easement DKT 5098 PG 658. |
Completed Inspections
Permit Status: Issued
Permit Number: DP17-0142
Permit Description: SITE/GRADING - CATERPILLAR SM&T HQ1ST REVISION APPROVED 8/20/18 (SHEETS 1, 6, 7, 9, 9A)2ND REV
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/28/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 02/28/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } | |
03/05/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 03/05/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
03/05/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 03/05/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
03/05/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 03/05/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
10/03/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 10/03/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/05/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - THE CONTRACTOR IS WORKING ON THE SOUTH PORTION OF THE PROJECT ROUGH GRADING THE AREA. I WILL DISCUSS THE ONGOING WORK WITH JOHN VAN WINKLE TO ENSURE HOW MUCH OF THE AREA NEEDS TO HAVE HYDRO SEED OR DG PLACED ON IT FOR A FULL CLOSURE OF THIS PERMIT} ; {Activity date: 03/05/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MINOR AREAS OF THE LANDSCAPING HAS BEEN APPROVED NEAR THE ENTRANCES INTO THE STRUCTURE NEAR THE SOUTHWEST AND SOUTHEAST ENTRANCES. THESE AREAS WILL BE RECHECKED IN THE FUTURE TO MAKE SURE THAT THEY ARE COMPLIANT. DAMAGE TO THE NEW STORMDRAIN LINE SOUTH OF THE MAIN BUILDING HAS BEEN DAMAGED DURING THE INSTALLATI0N, SOME OF MAY NEED TO BE REPLACED OR REPAIRED PRIOR TO ACCEPTANCE. THE CONTRACTOR HAS BEEN ADVISED THAT THEY WILL NEED TO PLUG THE OULET INTO THE SANTA CRUZ RIVER, THEN WASH AND VACUM OUT ALL OF THE MUD AND DEBRIS FROM THE PIPES. THEN THEY WILL NEED TO HAVE SOMEONE OF THEIR CHOICE FILM THE FULL RUN OF THE STORM DRAIN LINE LOCATED UNDERNEATH THE SOUTHERN SERVICE ROAD DIRECTLY SOUTH OF THE MAIN BUILDING FROM THE WEST CATCHBASIN TO THE LAST MANHOLE WITHIN THE PRIVATE PROPERTY. THIS IS BEING DONE TO ENSURE THAT THE LINE IS CLEANED FULLY AND THAT NONE OF THE MUD IS TO BE TRANSFERRED INTO THE SANTA CRUZ RIVER.} ; {Activity date: 02/26/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Superintend it was informed that the landscape areas shall be depressed at least 6 inches below the curb openings.} |
|
10/03/2019 | ENGR Grading Final | Passed | {Activity date: 10/03/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - ALL REMAINING WORK WILL BE INSPECTED UNDER THE FINAL GRADING PERMIT} ; {Activity date: 03/05/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - WORK MOSTLY HAPPENING ON THE BUILDING, AND CLEANING OF THE EXTERIOR AREAS. MINOR AREAS OF THE LANDSCAPING HAS BEEN APPROVED NEAR THE ENTRANCES INTO THE STRUCTURE NEAR THE SOUTHWEST AND SOUTHEAST ENTRANCES. THESE AREAS WILL BE RECHECKED IN THE FUTURE TO MAKE SURE THAT THEY ARE COMPLIANT. DAMAGE TO THE NEW STORMDRAIN LINE SOUTH OF THE MAIN BUILDING HAS BEEN DAMAGED DURING THE INSTALLATI0N, SOME OF MAY NEED TO BE REPLACED OR REPAIRED PRIOR TO ACCEPTANCE. THE CONTRACTOR HAS BEEN ADVISED THAT THEY WILL NEED TO PLUG THE OULET INTO THE SANTA CRUZ RIVER, THEN WASH AND VACUM OUT ALL OF THE MUD AND DEBRIS FROM THE PIPES. THEN THEY WILL NEED TO HAVE SOMEONE OF THEIR CHOICE FILM THE FULL RUN OF THE STORM DRAIN LINE LOCATED UNDERNEATH THE SOUTHERN SERVICE ROAD DIRECTLY SOUTH OF THE MAIN BUILDING FROM THE WEST CATCHBASIN TO THE LAST MANHOLE WITHIN THE PRIVATE PROPERTY. THIS IS BEING DONE TO ENSURE THAT THE LINE IS CLEANED FULLY AND THAT NONE OF THE MUD IS TO BE TRANSFERRED INTO THE SANTA CRUZ RIVER.} ; {Activity date: 02/28/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - Contractor has re-work to do on paved and accessible access from parking lot to buildin. } ; {Activity date: 02/26/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - I LOOKED OUT ON THE SITE TO SEE WHAT TYPE OF WORK IS STILL NEEDED TO BE COMPLETED PRIOR TO THE REQUEST OF THE TCO CHANGE TO PUBLIC ACCESS. HARDSCAPING AND LANDSCAPING AROUND THE PARKING LOTS STILL NEEDS TO BE COMPLETED PRIOR TO THE ACCESS CHANGE. ALL ITEMS THAT NEED TO BE COMPLETED WITH THE USE OF EQUIPMENT NEEDS TO BE COMPLETED PRIOR TO THE CHANGE OF THE CERTIFICATE OF OCCUPANCY STATUS. ALL AREAS UNDER CONSTRUCTION WILL NEED TO BE BLOCKED OFF BY CONSTRUCTION FENCE MATERIAL TO PREVENT ACCESS INTO THOSE AREAS BY THE GENERAL PUBLIC. IT HAS BEEN NOTED SINCE THIS PAST FRIDAY 2/22/2019 THAT THERE IS A DRAINAGE PROBLEM WITH THE STORMDRAINAGE PIPES THAT RUN UNDERNEATH THE ROADWAY ON THE SOUTHSIDE OF THE BUILDING. SETTLING HAS BEEN NOTED IN THE PAVEMMENT, THE CONTRACTOR HAS REMOVED THE PAVEMENT AND THE CONCRETE COLLARS FROM THE AREA BUT HAVE NOT BEEN ABLE TO DETERMINE WHAT IS THE PROBLEM AT THIS TIME. I HAVE ASKED THAT THAT THEY REMOVE ALL OF THE GRATES OFF OF THE DROP INLET STRUCTURE AND THE MANHOLE COVERS TO VERIFY WHAT IS THE PROBLEM AND WHERE IS IT COMING FROM. I WILL BE ASKING THE CONTRACTOR TO FILM THE FULL RUN OF THE PIPE TO DETERMINE WHAT DAMAGE HAS BEEN DONE AND HOW MUCH CLEANING OF THE SYSTEM WILL BE REQUIRED. THIS WILL BE DISCUSSED IN FURTHER DETAIL TOMORROW MORNING AT 8 AM WHEN WE MEET TO REMOVE THE COVERS.} ; {Activity date: 02/22/2019; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - STOPPED BY THE SITE TO SEE HOW IT IS LOOKING SINCE THEY WILL BE ASKING FOR FULL TEMPORARY OCCUPANCY NEXT WEEK. IT HAS BEEN NOTED ON THE SOUTH SIDE OF THIS SITE THAT THERE IS SETTLING IN THE BACKFILL MATERIAL OVER PIPES AND AROUND STRUCTURES WITHIN THE ROADWAY ON THE SOUTHSIDE OF THE BUILDING. DEPENDING WHAT THIS IS CAUSED FROM MAY DELAY MY APPROVAL FOR THE FULL TCO NEXT WEEK. THE CONTRACTOR IS WORKING ON TRYING TO DETERMINE WHAT IS HAPPENING TO CREATE THIS ISSUE, BUT HAS BEEN UNABLE TO DETERMINE WHAT IS HAPPENING. AT THIS TIME. I WILL BE MONITORING THIS SITE DAILY NEXT WEEK UNTIL A DETERMINATION IS MADE.} ; {Activity date: 02/26/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - We met with the Sundt GC and the foreman for Magnum with regards to the sunken pavement at the stormwater manhole the south end of the building. There is a small amount of mud in this manhole. The downstream manhole is clean at this time.Contractor was instructed to inspect and clean stormwater piping as needed. } ; {Activity date: 01/24/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - UNABLE TO WALK THIS SITE TODAY, I HAVE RESCHEDULE THIS SITE INSPECTION TO BE COMPLETED ON 1/25/2019} ; {Activity date: 01/18/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Subcontractor Steve at 349-9531 is installing sidewalks the cross slope will be between 1% and 2%.} ; {Activity date: 01/17/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Magnum is installing curbs. Also 12 inch wire Riff Raff on east side. Starting sidewalks along west parking garage} ; {Activity date: 01/16/2019; Status: Continued; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } ; {Activity date: 12/13/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Contractor is preparing for pavement of service Drive and has placed 5in of a bee} ; {Activity date: 12/05/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Trash enclosure is okay for grout. Western Technologies is on site for inspection also. Contractor is removing temporary Bank protection along Eastern edge of property. Stormwater controls are still in place. Contractor is running utilities along south portion of site.} ; {Activity date: 08/22/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - POURING THE CATCHBASIN BASE FOR BASIN NUMBER , LOCATED SOUTH OF THE EASTERN HALF OF THE MAIN STRUCTURE, EAST OF THE PARKING STRUCTURE. THIS AREA} ; {Activity date: 08/09/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - INSPECTION CALLED INTO TO LOOK AT A 1" WATER LINE INSTALLATION TO THE UNDERGROUNG GARAGE. THIS INSPECTION WAS PERFORMED BY RAY CAMACHO ON THIS DATE UNDER THE BUILDING PERMIT.} ; {Activity date: 07/30/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH THE CONTRACTOR AND DISCUSSED THE INSTALLATION OF A NEW STAIRWAY FROM THE UNDERGROUND PARKING LOT TO THE FINISH GRADE AREA. ADVISED THEM THAT THIS INSPECTION SHOULD NOT BE DONE ON THIS PERMIT IT SHOULD HAVE ITS OWN WALL PERMIT. I ADVISED THEM THAT I WILL CONTACT OUR STRUCTURAL SECTION TO SEE IF THEY DID IN STRUCTURAL REVIEWS ON THE DEVELOPMENT PACKAGE. I CHECKED WITH ERIC AND WAS ADVISED THAT THIS WILL NEED TO BE SUBMITTED FOR A WALL PERMIT AND WILL NEED TO BE REVIEWED AND APPROVED PRIOR TO THE BUILDING INSPECTORS PERFORMING ANY SITE INSPECTIONS FOR THIS LOCATION.} ; {Activity date: 05/07/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SECTION OF SEWER PIPE INSPECTED BY BLDG INSPECTOR. OK TO COVER,} ; {Activity date: 04/13/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - REBAR FOR CATCH BASINS ON SOUTH SIDE OF NEW BUILDING.} ; {Activity date: 03/28/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - STORM WATER PIPING PER HIGH LIGHTS ON PAGE C4.0.} ; {Activity date: 03/23/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PER HIGH LIGHTS ON PAGE C4.0 STROM WATER PIPING.} ; {Activity date: 03/21/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 03/19/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - STROM WATER PIPING PER HIGH LIGHTS ON PAGE C4.0.} ; {Activity date: 03/14/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - HIGH LIGHTS ON PAGE C4.0 FOR STROM WATER PIPING.} ; {Activity date: 03/09/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - INSPECTION PER HIGH LIGHTS ON PAGE C4.0 FOR STROMWATER PIPING.} ; {Activity date: 03/07/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - INSPECTION PER HIGH LIGHTS ON AP PLANS FOR STORM WATER PIPING.} ; {Activity date: 02/23/2018; Status: Continued; Ins |
|
03/23/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 03/23/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/03/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - NO CONCERNS AT THIS TIME} ; {Activity date: 04/05/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Minor track out onto Aveneda Del Convento.} ; {Activity date: 03/05/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, NO TRACKOUT NOTED. THE CONTRACTOR WILL BE SCHEDULING FOR A SWEEPER SERVICE TO CLEAN THE INTERIOR STREETS THIS WEEK IF POSSIBLE.} ; {Activity date: 02/28/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 02/26/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MINOR TRACKOUT NOTED ON THIS SITE THAT WILL NEED TO BE CLEANED ASAP} ; {Activity date: 01/17/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are no issues at this time} ; {Activity date: 12/05/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are no concerns at this time.} | |
05/06/2021 | ENGR Engineering Final | Passed | {Activity date: 05/06/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 10/03/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/18/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Unscheduled progress inspection. There are a couple broken sections of sidewalk at site entrance. Temporary fencing still installed west side of property. Area south of parking areas appears to be on stabilized, there are some stock piles of material, and there is some Erosion along the east bank. } ; {Activity date: 01/23/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CREWS CONTINUE TO WORK THROUGHOUT THE SITE TRYING TO COMPLETE AS MUCH OF THE EXTERIOR WORK THAT THEY CAN. THEY WILL BE SEEKING A TCO FOR THIS SITE ON OR BEFORE2/15/2019 IF POSSIBLE. I WILL TRY TO WALK THE SITE ON 1/24/2019 TO SEE WHAT REMAINING ITEMS WILL CAUSE ME CONCERN BY THE MIDDLE OF NEXT MONTH.} ; {Activity date: 12/18/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Asphalt has been installed but is blocked by a temporary fence. There is no walking access from the street to the building.} |
|
05/06/2021 | SITE - Stormwater Final Inspection | Passed | {Activity date: 05/06/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/03/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS, PROVIDE ALL CLOSEOUT DOCUMENTATION} ; {Activity date: 02/28/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - } |