Permit: DP17-0117
Permit Details
Status:
Complete
Type:
Development Package
Address:
2550 W STARR PASS BL
Address NEW:
2550 W STARR PASS BL
Apply Date:
05/16/2017
Applicant:
Description:
TP/FLD/ERR - STARR PASS VISTAS VILLAGE 1 LOTS 1-15
Permit Reviews
Permit Number - DP17-0117
Permit Status: Complete
Permit Description: TP/FLD/ERR - STARR PASS VISTAS VILLAGE 1 LOTS 1-15
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/16/2017 | DEV PKG - OK TO SUBMIT | 05/16/2017 | COMPLETED |
| 05/16/2017 | TENTATIVE PLAT REVIEW | 07/05/2017 | COMPLETED |
| 07/05/2017 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 08/04/2017 | COMPLETED |
| 08/04/2017 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 09/29/2017 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0117
Permit Description: TP/FLD/ERR - STARR PASS VISTAS VILLAGE 1 LOTS 1-15
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 11/03/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 06/11/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 06/11/2019; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } ; {Activity date: 06/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - The project is still under construction, No homes or sidewalks have been installed at this time. Stormwater controls are still in place and there are no issues at this time. Basins are in fair to good condition.} | |
| 06/11/2019 | SITE - Stormwater Follow-up | Passed | {Activity date: 06/11/2019; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } ; {Activity date: 06/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - The project is still under construction, No homes or sidewalks have been installed at this time. Stormwater controls are still in place and there are no issues at this time. Basins are in fair to good condition.} ; {Activity date: 05/10/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERS AT THIS TIME. WORKING ON HOUSE PADS.} ; {Activity date: 04/20/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 02/28/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 02/20/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/29/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 01/23/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS .} ; {Activity date: 01/05/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/15/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} | |
| 06/11/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 06/11/2019; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } | |
| 06/11/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 06/11/2019; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } ; {Activity date: 06/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - The project is still under construction, No homes or sidewalks have been installed at this time. Stormwater controls are still in place and there are no issues at this time. Basins are in fair to good condition.} ; {Activity date: 11/15/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET ON SITE WITH GRADING CONTRACTOR ABOUT COMPLETING IN STALL OF SWPPP CONTROLS.} | |
| 06/11/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 06/11/2019; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } ; {Activity date: 06/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - The project is still under construction, No homes or sidewalks have been installed at this time. Stormwater controls are still in place and there are no issues at this time. Basins are in fair to good condition.} | |
| 07/21/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 07/21/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/03/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - The only native landscaping appears to be outside of the perimeter wall. Some of the cactus still have a protective wrap around them.} | |
| 05/06/2021 | ENGR Engineering Final | Passed | {Activity date: 05/06/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 10/28/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Some sections of accessible sidewalk have been replaced however some still require correction. Other areas have not been corrected although paint has been removed} ; {Activity date: 10/20/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continue. Only activity on site is private pool construction} ; {Activity date: 10/12/2020; Status: Denied; Inspector: DROBERTS; Comment: Entered by VFLORES1 - SIDEWALKS HAVE NOT BEEN REPLACED FULLY.SCHEDULE AN ON SITE MEETING WITH DAVIR ROBERTS,CONTACT INFORMATION IS (529) 349-7643} ; {Activity date: 09/22/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS PARTIAL AT THIS TIME. A FINAL INSPECTION OF THE SITE WILL BE DONE LATER THIS WEEK TO VERIFY THAT ALL OF THE SIDEWALKS HAVE BEEN REPAIRED AND ARE ADA COMPLIANT. THIS INSPECTUON WILL BE DONE AFTER I HAVE CONTACTED LENNAR AND ADVISED THEM OF THE SAME.} ; {Activity date: 07/24/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Not ready. Corrections have not yet been made. New sections of sidewalk installed in front of Lot 8 are also out of compliance.} ; {Activity date: 07/21/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SEE INSPECTION COMMENT FROM THE PREVIOUS INSPECTION DATED 7/17/2020} ; {Activity date: 07/17/2020; Status: Partial Approval; Inspector: DROVERTS; Comment: Entered by JSCHNEI2 - PARTIAL AT THIS TIME, COMPLETE THE WORK AS SHOWN ON THE APPROVED PLANS PRIOR TO SCHEDULING THIS FINAL INSPECTION. THIS WILL ALSO INCLUDE THE REMOVAL OF ALL CONSTRUCTION TRASH AND DEBRIS, EXCESS MATERIALS INCLUDING ALL STOCKPILES, REMOVE ALL TRAILERS, STORAGE BINS, AN PORTA JOHNS FROM THIS SITE AND ADJACENT AREAS.} ; {Activity date: 06/18/2020; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - WALKED THE SITE AND PUT TOGETHER AN ESTIMATED ACCOUNT OF THE AREAS AND THE FOOTAGE THAT WILL NEED TO BE REPAIRED. I TALKED TO THE SUPERVISOR FOR LENNAR AND ADVISED HIM OUR FINDINGS, HE WILL BE BRINGING HIS CONTRACTOR TO LOOK AT THE WORK THAT WILL BE CORRECTED UNDER THEWIR WARRANTY PROGRAM. I ALSO CREATED A PLAN OF THE APPROXIMATE FOOTAGE, AREAS AND LOCATIONS OF THE DAMAGES THAT WILL NEED TO BE CORRECTED PRIOR TO THE FINAL OF THIS SITE. I HAVE RESPONDED TO AN EMAIL FROM JOHN VAN WINKLE IN REGARDS TO THESE SIDEWALKS AND DRIVEWAYS AND HAVE SENT THE MAP AND RESULTS TO ALL CONCERNED. IF THERE ARE ANY QUESTIONS I CAN BE CONTACTED AT (520) 349-7643 OR EMAIL ME AT David.Roberts@tucsonaz.gov} ; {Activity date: 06/16/2020; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - WALKED THE SITE WITH RON AND BRIAN CHECKING THE SIDEWALKS AND DRIVEWAYS FOR COMPLIANCE. WE HAVE NOTED AND PHOTOGRAPHED ALL AREAS THAT ARE NOT COMPLIANT OR DAMAGED THAT NEED TO BE REPLACED AT THIS TIME WITH ORANGE PAINT. I WILL CONTACT JOHN VAN WINKLE AND DISCUSS THE ISSUES ON THIS SITE THAT NEED TO BE CORRECTED. I CONTACTED THE SITE SUPERVISOR FOR THIS SITE AND HAVE ADVISED HIM OF THE ISSUES AND SHOWED HIM THAT EVERYTHING MARKED WITH ORANGE PAINT IS EITHER BROKEN OR IS NON-COMPLIANT AND NEEDS TO BE REMOVED AND REPLACED. HE WILL CONTACT HIS CONTRACTOR FOR THIS WORK AND HAVE THEM COME OUT AND MAKE THE NECESSARY REPAIRS FOR THIS SITE UNDER THEIR WARRANTY PROGRAM.} ; {Activity date: 06/09/2020; Status: Denied; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Denied. Correction required. 25 to 30% of the accessible path, sidewalk on both sides of the street exceed the maximum allowed cross slope. At least eight panels are broken. All walkways except in front of one remaining home have been installed. Comply with note No. 9 on page 3 and install sidewalks per city of Tucson standard specifications section 1006. Plans indicate that this is a private street. It was an unscheduled courtesy inspection. I have no contact information for the superintendent on this project. After corrections are made, a statement of conformance for project grading is required per note number 32 on page 3. Please schedule for inspections and provide contact information when ready. } ; {Activity date: 12/21/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Sidewalks at basin and railing have been installed only at that location. Install temporary controls around stockpile on West Side of site if not active} ; {Activity date: 06/07/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE FINAL GRADING INSPECTION FOR THIS SITE WAS STARTED TODAY BUT WILL NOT BE COMPLETED TILL NEXT WEEK FOR THE FULL SITE. CURRENTLY THIS SITE HAS BEE GRADED FOR THE FINISH LOT PADS, UTILITIES INSTALLED, ROADWAY SURFACE PLACED, NO HOUSES HAVE BEEN CONSTRUCTED AT THIS TIME.} |
|
| 11/24/2021 | ENGR Grading Final | Passed | {Activity date: 11/24/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Approved. Inspector recommends changing status from issued to final as all inspections have been approved } ; {Activity date: 07/21/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/16/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Dave, Ron and I walked the site and identified the sections out of compliance with orange paint for Daves orders. Nearly a third of the site requires correction } ; {Activity date: 06/09/2020; Status: Denied; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Denied. Correction required. 25 to 30% of the accessible path, sidewalk on both sides of the street exceed the maximum allowed cross slope. At least eight panels are broken. All walkways except in front of one remaining home have been installed. Comply with note No. 9 on page 3 and install sidewalks per city of Tucson standard specifications section 1006. Plans indicate that this is a private street. It was an unscheduled courtesy inspection. I have no contact information for the superintendent on this project. After corrections are made, a statement of conformance for project grading is required per note number 32 on page 3. Please schedule for inspections and provide contact information when ready. } ; {Activity date: 06/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. The site is almost complete. Only one homesite is missing sidewalks. Project could be approved once stormwater controls have been removed and SWPPP has been terminated} ; {Activity date: 06/11/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - The first two homes are under construction at this time. There is no access Path from Starr Pass. It does appear as if basic utilities have been brought on to the site.} ; {Activity date: 06/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - The project is still under construction, No homes or sidewalks have been installed at this time. Stormwater controls are still in place and there are no issues at this time. Basins are in fair to good condition.} |