Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/13/2018 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 06/11/2019 |
ENGR Grading Final |
bbenedo1 |
Approved |
Entered by BBENEDO1 - |
| 06/10/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - The project is still under construction, No homes or sidewalks have been installed at this time. Stormwater controls are still in place and there are no issues at this time. Basins are in fair to good condition. |
| 06/11/2019 |
ENGR Grading Final |
bbenedo1 |
Approved |
Entered by BBENEDO1 - |
| 06/10/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - The project is still under construction, No homes or sidewalks have been installed at this time. Stormwater controls are still in place and there are no issues at this time. Basins are in fair to good condition. |
| 02/12/2018 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - I HAVE LOOKED AT THE LAST OF THE DRAINAGE PIPES TO BE INSTALLED ON THIS SITE, IT IS READY FOR BACKFILL |
| 11/24/2021 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by NGARCIA3 - Approved. Inspector recommends changing status from issued to final as all inspections have been approved
|
| 07/21/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 06/16/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Dave, Ron and I walked the site and identified the sections out of compliance with orange paint for Daves orders. Nearly a third of the site requires correction
|
| 06/09/2020 |
ENGR Grading Final |
BBENEDON |
Denied |
Entered by RSALDAT1 - Denied. Correction required. 25 to 30% of the accessible path, sidewalk on both sides of the street exceed the maximum allowed cross slope. At least eight panels are broken. All walkways except in front of one remaining home have been installed.
Comply with note No. 9 on page 3 and install sidewalks per city of Tucson standard specifications section 1006.
Plans indicate that this is a private street. It was an unscheduled courtesy inspection. I have no contact information for the superintendent on this project.
After corrections are made, a statement of conformance for project grading is required per note number 32 on page 3. Please schedule for inspections and provide contact information when ready.
|
| 06/08/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. The site is almost complete. Only one homesite is missing sidewalks. Project could be approved once stormwater controls have been removed and SWPPP has been terminated |
| 06/11/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - The first two homes are under construction at this time. There is no access Path from Starr Pass. It does appear as if basic utilities have been brought on to the site. |
| 06/10/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - The project is still under construction, No homes or sidewalks have been installed at this time. Stormwater controls are still in place and there are no issues at this time. Basins are in fair to good condition. |