Permit: DP17-0117

Parcel: Unknown

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
05/06/2021 ENGR Engineering Final MHERNANDEZ Approved Entered by VLEON1 -
05/06/2021 ENGR Engineering Final MHERNANDEZ Approved Entered by VLEON1 -
10/09/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by PAHUMAD1 - Not ready. All corrections have not been made as required for accessible walkways. Paint has been removed. Some areas have been corrected.
07/21/2020 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
06/16/2020 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by RSALDAT1 - Not ready. Walk site with Dave Roberts and Brian Check sidewalks for cross slope’s marked sidewalks that were over 2%.
06/09/2020 ENGR Engineering Final BBENEDON Denied Entered by RSALDAT1 - Denied. Correction required. 25 to 30% of the accessible path, sidewalk on both sides of the street exceed the maximum allowed cross slope. At least eight panels are broken. All walkways except in front of one remaining home have been installed. Comply with note No. 9 on page 3 and install sidewalks per city of Tucson standard specifications section 1006. Plans indicate that this is a private street. It was an unscheduled courtesy inspection. I have no contact information for the superintendent on this project. After corrections are made, a statement of conformance for project grading is required per note number 32 on page 3. Please schedule for inspections and provide contact information when ready.
05/06/2021 ENGR Engineering Final MHERNANDEZ Approved Entered by VLEON1 -
10/28/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Some sections of accessible sidewalk have been replaced however some still require correction. Other areas have not been corrected although paint has been removed
10/20/2020 ENGR Engineering Final BBENEDON Continued Entered by RSALDAT1 - Continue. Only activity on site is private pool construction
10/12/2020 ENGR Engineering Final DROBERTS Denied Entered by VFLORES1 - SIDEWALKS HAVE NOT BEEN REPLACED FULLY.SCHEDULE AN ON SITE MEETING WITH DAVIR ROBERTS,CONTACT INFORMATION IS (529) 349-7643
09/22/2020 ENGR Engineering Final DROBERTS Partial Approval Entered by RSALDAT1 - IS PARTIAL AT THIS TIME. A FINAL INSPECTION OF THE SITE WILL BE DONE LATER THIS WEEK TO VERIFY THAT ALL OF THE SIDEWALKS HAVE BEEN REPAIRED AND ARE ADA COMPLIANT. THIS INSPECTUON WILL BE DONE AFTER I HAVE CONTACTED LENNAR AND ADVISED THEM OF THE SAME.
07/24/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by JSCHNEI2 - Not ready. Corrections have not yet been made. New sections of sidewalk installed in front of Lot 8 are also out of compliance.
07/21/2020 ENGR Engineering Final DROBERTS Partial Approval Entered by DROBERT5 - SEE INSPECTION COMMENT FROM THE PREVIOUS INSPECTION DATED 7/17/2020
07/17/2020 ENGR Engineering Final DROVERTS Partial Approval Entered by JSCHNEI2 - PARTIAL AT THIS TIME, COMPLETE THE WORK AS SHOWN ON THE APPROVED PLANS PRIOR TO SCHEDULING THIS FINAL INSPECTION. THIS WILL ALSO INCLUDE THE REMOVAL OF ALL CONSTRUCTION TRASH AND DEBRIS, EXCESS MATERIALS INCLUDING ALL STOCKPILES, REMOVE ALL TRAILERS, STORAGE BINS, AN PORTA JOHNS FROM THIS SITE AND ADJACENT AREAS.
06/18/2020 ENGR Engineering Final DROBERTS Correction Required Entered by DROBERT5 - WALKED THE SITE AND PUT TOGETHER AN ESTIMATED ACCOUNT OF THE AREAS AND THE FOOTAGE THAT WILL NEED TO BE REPAIRED. I TALKED TO THE SUPERVISOR FOR LENNAR AND ADVISED HIM OUR FINDINGS, HE WILL BE BRINGING HIS CONTRACTOR TO LOOK AT THE WORK THAT WILL BE CORRECTED UNDER THEWIR WARRANTY PROGRAM. I ALSO CREATED A PLAN OF THE APPROXIMATE FOOTAGE, AREAS AND LOCATIONS OF THE DAMAGES THAT WILL NEED TO BE CORRECTED PRIOR TO THE FINAL OF THIS SITE. I HAVE RESPONDED TO AN EMAIL FROM JOHN VAN WINKLE IN REGARDS TO THESE SIDEWALKS AND DRIVEWAYS AND HAVE SENT THE MAP AND RESULTS TO ALL CONCERNED. IF THERE ARE ANY QUESTIONS I CAN BE CONTACTED AT (520) 349-7643 OR EMAIL ME AT David.Roberts@tucsonaz.gov
06/16/2020 ENGR Engineering Final DROBERTS Correction Required Entered by DROBERT5 - WALKED THE SITE WITH RON AND BRIAN CHECKING THE SIDEWALKS AND DRIVEWAYS FOR COMPLIANCE. WE HAVE NOTED AND PHOTOGRAPHED ALL AREAS THAT ARE NOT COMPLIANT OR DAMAGED THAT NEED TO BE REPLACED AT THIS TIME WITH ORANGE PAINT. I WILL CONTACT JOHN VAN WINKLE AND DISCUSS THE ISSUES ON THIS SITE THAT NEED TO BE CORRECTED. I CONTACTED THE SITE SUPERVISOR FOR THIS SITE AND HAVE ADVISED HIM OF THE ISSUES AND SHOWED HIM THAT EVERYTHING MARKED WITH ORANGE PAINT IS EITHER BROKEN OR IS NON-COMPLIANT AND NEEDS TO BE REMOVED AND REPLACED. HE WILL CONTACT HIS CONTRACTOR FOR THIS WORK AND HAVE THEM COME OUT AND MAKE THE NECESSARY REPAIRS FOR THIS SITE UNDER THEIR WARRANTY PROGRAM.
06/09/2020 ENGR Engineering Final BBENEDON Denied Entered by RSALDAT1 - Denied. Correction required. 25 to 30% of the accessible path, sidewalk on both sides of the street exceed the maximum allowed cross slope. At least eight panels are broken. All walkways except in front of one remaining home have been installed. Comply with note No. 9 on page 3 and install sidewalks per city of Tucson standard specifications section 1006. Plans indicate that this is a private street. It was an unscheduled courtesy inspection. I have no contact information for the superintendent on this project. After corrections are made, a statement of conformance for project grading is required per note number 32 on page 3. Please schedule for inspections and provide contact information when ready.
12/21/2018 ENGR Engineering Final RLEDONNE Continued Entered by CBELL1 - Sidewalks at basin and railing have been installed only at that location. Install temporary controls around stockpile on West Side of site if not active
06/07/2018 ENGR Engineering Final DROBERTS Continued Entered by DROBERT5 - THE FINAL GRADING INSPECTION FOR THIS SITE WAS STARTED TODAY BUT WILL NOT BE COMPLETED TILL NEXT WEEK FOR THE FULL SITE. CURRENTLY THIS SITE HAS BEE GRADED FOR THE FINISH LOT PADS, UTILITIES INSTALLED, ROADWAY SURFACE PLACED, NO HOUSES HAVE BEEN CONSTRUCTED AT THIS TIME.