Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP17-0083
Permit Details
Status:
Complete
Type:
Development Package
Address:
3510 N CRAYCROFT RD
Address NEW:
3510 N CRAYCROFT RD
Apply Date:
04/07/2017
Applicant:
Description:
SITE/SWPPP/GRADING - RIO VERDE VILLAGE APARTMENTS
Permit Reviews
Permit Number - DP17-0083
Permit Status: Complete
Permit Description: SITE/SWPPP/GRADING - RIO VERDE VILLAGE APARTMENTS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/07/2017 | DEV PKG - OK TO SUBMIT | 04/07/2017 | COMPLETED |
| 04/07/2017 | DEV PKG | 05/15/2017 | COMPLETED |
| 07/06/2017 | DEV PKG - RESUBMITTAL | 08/02/2017 | COMPLETED |
| 08/10/2017 | DEV PKG - RESUBMITTAL | 10/03/2017 | COMPLETED |
| 10/22/2019 | DEV PKG - OK TO SUBMIT | 11/29/2019 | COMPLETED |
| 11/22/2017 | REVISION - SITE | 11/22/2017 | COMPLETED |
| 11/27/2019 | REVISION - - 2ND | 11/29/2019 | ACTIVE |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0083
Permit Description: SITE/SWPPP/GRADING - RIO VERDE VILLAGE APARTMENTS
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 11/13/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET ON SITE FOR PRE-CON.} ; {Activity date: 11/09/2017; Status: Cancelled; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CONTRACTOR CANCELLED THIS INSPECTION AFTER i WAS ON SITE, IT IS RESCHEDULED FOR 9:00 A.M. ON 11/13/2017, CONTACT JOHN AT (480) 707-8680 IF YOU HAVE ANY QUESTIONS ABOUT THE MEETING.} | |
| 12/07/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 12/07/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 11/17/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH JAY INSTALLING SWPPP CONTROLS ON SITE.} | |
| 10/31/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 10/31/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } | |
| 10/31/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 10/31/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } | |
| 11/12/2019 | SITE - Stormwater Follow-up | Passed | {Activity date: 11/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH CONTRACTOR AND DISCUSSED THE FINALIZATION OF THIS PROJECT. HE WILL BE POURING THE REMAINING SECTION OF SIDEWALK ON 11/13/19 AND WILL BE TRYING TO SCHEDULE THIS SITE FOR A FULL RELEASE ON 11/14/2019.} ; {Activity date: 03/21/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 03/20/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 02/21/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 02/07/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 12/13/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 11/20/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 11/02/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WALKED SITE WENT OVER SWPPP CONTROLS.} ; {Activity date: 10/12/2018; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - 1-noted breach on the northwest corner has not yet been fixed and there is dirt flowing into the canal 2 Re-stake and clear dirt from the waddle along the Southside perimeter near the sewer manhole. I spoke with supe Sanel} ; {Activity date: 10/10/2018; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - there is a breach in the controls at the northwest corner under bridge with erosion into the canal. I spoke with Jake site super about this issue.} ; {Activity date: 09/05/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WALKED SITE WITH JAKE WENT OVER SWPPP REPAIRS THAT NEED TO BE MADE.} ; {Activity date: 08/10/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - REPAIRS THAT NEED TO BE MADE ON SOUTH WESTB SIDE OF SITE.} ; {Activity date: 07/18/2018; Status: Continued; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - SWPPP CONTROLS THAT NEED REPAIRS ON NORTH EAST AND SOUTH WEST SIDE OF SITE.} ; {Activity date: 07/03/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - REPAIRS TO SWPPP CONTROLS ON SOUTH SIDE OF SITE NEEDTO BE MADE.} ; {Activity date: 02/27/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/30/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT PROVIDING A WASH OUT.} ; {Activity date: 01/10/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 01/05/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/05/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERN AT THIS TIME.} |
|
| 11/12/2019 | ENGR Grading Final | Passed | {Activity date: 11/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 11/18/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 11/18/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } ; {Activity date: 11/12/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS INSPECTION WILL BE COMPLETED BY RON LE DONNE WHO IS THE INSPECTOR OF THIS SITE.} | |
| 11/18/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 11/18/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/10/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - } | |
| 12/10/2019 | ENGR Engineering Final | Passed | {Activity date: 12/10/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } ; {Activity date: 11/18/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Complete notes from engineering final for grading final.} ; {Activity date: 11/12/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS, AND PROVIDE THE CLOSE OUT DOCUMENTATION. THIS WILL BE APPROVED REFVISED DRAWINGS, CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, NOTICE OF TERMINATION FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY.} |