Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP17-0083
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/12/2019 | SITE - Stormwater Follow-up | DROBERTS | Approved | Entered by DROBERT5 - MET WITH CONTRACTOR AND DISCUSSED THE FINALIZATION OF THIS PROJECT. HE WILL BE POURING THE REMAINING SECTION OF SIDEWALK ON 11/13/19 AND WILL BE TRYING TO SCHEDULE THIS SITE FOR A FULL RELEASE ON 11/14/2019. |
| 03/21/2019 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME. |
| 03/20/2019 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME. |
| 02/21/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME. |
| 02/07/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME. |
| 12/13/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 11/20/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS. |
| 11/02/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WENT OVER SWPPP CONTROLS. |
| 10/12/2018 | SITE - Stormwater Follow-up | BBENEDON | Denied | Entered by CBELL1 - 1-noted breach on the northwest corner has not yet been fixed and there is dirt flowing into the canal 2 Re-stake and clear dirt from the waddle along the Southside perimeter near the sewer manhole. I spoke with supe Sanel |
| 10/10/2018 | SITE - Stormwater Follow-up | BBENEDON | Denied | Entered by CBELL1 - there is a breach in the controls at the northwest corner under bridge with erosion into the canal. I spoke with Jake site super about this issue. |
| 09/05/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH JAKE WENT OVER SWPPP REPAIRS THAT NEED TO BE MADE. |
| 08/10/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - REPAIRS THAT NEED TO BE MADE ON SOUTH WESTB SIDE OF SITE. |
| 07/18/2018 | SITE - Stormwater Follow-up | RLEDONN1 | Continued | Entered by RLEDONN1 - SWPPP CONTROLS THAT NEED REPAIRS ON NORTH EAST AND SOUTH WEST SIDE OF SITE. |
| 07/03/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - REPAIRS TO SWPPP CONTROLS ON SOUTH SIDE OF SITE NEEDTO BE MADE. |
| 02/27/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 01/30/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT PROVIDING A WASH OUT. |
| 01/10/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS. |
| 01/05/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 01/05/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERN AT THIS TIME. |