Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP17-0083
Inspection Description - ENGR Grading Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/12/2019 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
| 11/12/2019 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
| 11/12/2019 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
| 01/15/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by CBELL1 - Trash enclosure on Northwest side of sight full-height grout okay. Trash enclosure on Southeast side of sight 4 ft grout okay |
| 10/12/2018 | ENGR Grading Final | BBENEDON | Not ready for Inspection | Entered by CBELL1 - please use your building permit for your light pole installations. Note it is too wet to do footing inspections |
| 10/10/2018 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by CBELL1 - bollards at north entrance near School |
| 07/26/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - REBAR FOR TRASH ENCLOUSER MAT AT NORTH EAST SIDE OF SITE. |
| 07/18/2018 | ENGR Grading Final | RLEDONN1 | Continued | Entered by RLEDONN1 - REBAR FOR MAT AND FOOTER FOR TRASH ENCLOUSER PER HIGH LIGHTS ON PAGES 2&3 OF 51. |
| 07/05/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - HOLES FOR BALLARDS ON SOUTH EAST SIDE OF SITE OK TO INSTALL. |
| 11/12/2019 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
| 09/06/2019 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Talked to GC was not prepared for inspection at this time. |
| 03/21/2019 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - Met on site with the Concrete contractor and looked at the sidewalk forms from the pedestrian bidge to the pool area. The forms for the sidewalk between the pool and the bridge are OK for pouring at this time. |
| 03/20/2019 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - The contractors personnel all appear to be working on general site work and on the buildings not much site work happening at this time. |
| 01/24/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WENT OVER SIDEWALKS AND RAMPS AT WEST END OF SITE. |
| 01/16/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - TOOK SIDEWALK DETAIL #200 TO SITE GC NOT ON SITE LEFT ON DESK. HE WAS ASKING ABOUT CROSS SLOPES. |
| 08/31/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC AND ENGINEER ON SITE ABOUT BOLLARDS ON NORTH SIDE OF SITE. |
| 01/23/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT NOIS. |
| 12/26/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE. |