Permit: DP17-0083

Parcel: 10922452A


Addresses:

3510 N CRAYCROFT RD


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP17-0083

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
11/12/2019 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
11/12/2019 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
11/12/2019 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
01/15/2019 ENGR Grading Final RLEDONNE Continued Entered by CBELL1 - Trash enclosure on Northwest side of sight full-height grout okay. Trash enclosure on Southeast side of sight 4 ft grout okay
10/12/2018 ENGR Grading Final BBENEDON Not ready for Inspection Entered by CBELL1 - please use your building permit for your light pole installations. Note it is too wet to do footing inspections
10/10/2018 ENGR Grading Final BBENEDON Partial Approval Entered by CBELL1 - bollards at north entrance near School
07/26/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - REBAR FOR TRASH ENCLOUSER MAT AT NORTH EAST SIDE OF SITE.
07/18/2018 ENGR Grading Final RLEDONN1 Continued Entered by RLEDONN1 - REBAR FOR MAT AND FOOTER FOR TRASH ENCLOUSER PER HIGH LIGHTS ON PAGES 2&3 OF 51.
07/05/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - HOLES FOR BALLARDS ON SOUTH EAST SIDE OF SITE OK TO INSTALL.
11/12/2019 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
09/06/2019 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Talked to GC was not prepared for inspection at this time.
03/21/2019 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - Met on site with the Concrete contractor and looked at the sidewalk forms from the pedestrian bidge to the pool area. The forms for the sidewalk between the pool and the bridge are OK for pouring at this time.
03/20/2019 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - The contractors personnel all appear to be working on general site work and on the buildings not much site work happening at this time.
01/24/2019 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WENT OVER SIDEWALKS AND RAMPS AT WEST END OF SITE.
01/16/2019 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - TOOK SIDEWALK DETAIL #200 TO SITE GC NOT ON SITE LEFT ON DESK. HE WAS ASKING ABOUT CROSS SLOPES.
08/31/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC AND ENGINEER ON SITE ABOUT BOLLARDS ON NORTH SIDE OF SITE.
01/23/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ABOUT NOIS.
12/26/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.