Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 10/31/2019 |
PDSD Site/Engineering Division - Landscaping |
RLEDONNE |
Approved |
Entered by DMERANZ1 - |
| 10/17/2019 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Partial Approval |
Entered by DMERANZ1 - SITE VISIT ONLY TO DISCUSS WHAT IS NEEDED FOR THE FINAL CLOSEOUT OF THE DEVELOPMENT PACKAGE. ADVISED THE DEVELOPER TO PROVIDE COPIES OF ALL CLOSE-OUT DOCUMENTS(FINAL APPROVED REVISED DRAWINGS), CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, NOTICE OF TERMINATION FROM ADEQ. ALL WORK ON THIS SITE WILL NEED TO BE COMPLETED AND ALL EXCESS MATERIAL AND PORTABLE STORAGE FACILITIES NEED TO BE REMOVED.
THIS INSPECTION AND OTHERS WILL BE SCHEDULED WITHIN THE NEXT 7 DAYS, THEY ARE LOOKING FOR. FULL CLOSURE BY THE END OF THE MONTH. |
| 11/18/2019 |
PDSD Site/Engineering Division - Landscaping |
RLEDONNE |
Approved |
Entered by DMERANZ1 - |
| 11/12/2019 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - THIS INSPECTION WILL BE COMPLETED BY RON LE DONNE WHO IS THE INSPECTOR OF THIS SITE. |