Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
02/03/2017
Applicant:
Brandy Burke
Description:
SITE/GRADING - AUTOZONE + BURGER KING - SORRENTO SQUARE

Permit Reviews

Permit Number - DP17-0032
Permit Status: Complete
Permit Description: SITE/GRADING - AUTOZONE + BURGER KING - SORRENTO SQUARE
Start Date Submittal Complete Date Status  
02/03/2017 DEV PKG - OK TO SUBMIT 02/03/2017 COMPLETED Review Details
02/03/2017 DEV PKG 03/28/2017 COMPLETED Review Details
03/28/2017 DEV PKG - RESUBMITTAL 05/23/2017 COMPLETED Review Details
05/23/2017 DEV PKG - RESUBMITTAL 06/06/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0032
Permit Description: SITE/GRADING - AUTOZONE + BURGER KING - SORRENTO SQUARE
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/16/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 08/16/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
08/16/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 08/16/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 07/12/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PER DAVE ROBERTS OF THE ENG. SECTION PDSD THIS SITE WILL REQUIRE A SWPPP EVEN THOUGH IT'S LESS THAN 1 ACRE, DUE TO THE FACT THAT ITS PART OF A BIGGER DEVELOPMENT:

1) PROVIDE A STORM WATER PLAN
2) POST A COPY OF YOUR NOI
3) INSTALL SEDIMENT CONTROLS AT PERIMETER OF SITE PER YOUR SWPPP
4) INSTALL A STABILIZED ENTRANCE
5) INSTALL A CONCRETE WASH OUT
6) PERFORM STORM WATER SELF INSPECTIONS PER YOUR PERMIT

}
09/14/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 09/14/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/08/2017; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE SITE/GRADING WORK PER APPROVED PLANS, CALL FOR RE-INSPECTION}
09/14/2018 ENGR Engineering Final Passed {Activity date: 09/14/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/08/2017; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE SITE/GRADING WORK PER APPROVED PLANS, CALL FOR RE-INSPECTION}
09/14/2018 SITE - Stormwater Follow-up Passed {Activity date: 09/14/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/02/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MC MANUS CONSTR WILL BE WORKING ON COMMERCIAL SHELL, MATT 406-239-3008

NO CONTACT FOR INSPECTION, LEFT PHONE MESSAGE, CALL FOR RE-INSPECTION} ; {Activity date: 08/29/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES NO CONCERNS} ; {Activity date: 08/16/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) TRASH ENCLOSURE DETAIL ON APPROVED PLANS NOT PER COT DEV STD 6-0.10.
2) FOLLOW UP INSPECTION FOR SITE WORK, NO CONCERNS AT THIS TIME
3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
09/14/2018 ENGR Grading Final Passed {Activity date: 09/14/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/14/2018 SITE - Stormwater Final Inspection Passed {Activity date: 09/14/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/14/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/14/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by KROBLES1 - PER DROBERTS} ; {Activity date: 07/12/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PER DAVE ROBERTS OF THE ENG. SECTION PDSD THIS SITE WILL REQUIRE A SWPPP EVEN THOUGH IT'S LESS THAN 1 ACRE, DUE TO THE FACT THAT ITS PART OF A BIGGER DEVELOPMENT:

1) PROVIDE A STORM WATER PLAN
2) POST A COPY OF YOUR NOI
3) INSTALL SEDIMENT CONTROLS AT PERIMETER OF SITE PER YOUR SWPPP
4) INSTALL A STABILIZED ENTRANCE
5) INSTALL A CONCRETE WASH OUT
6) PERFORM STORM WATER SELF INSPECTIONS PER YOUR PERMIT

} ; {Activity date: 07/10/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE THERFORE NO SWPPP IS REQUIRED
2) SWEEP UP TRACKED SOIL AS NEEDED
3) CALL FOR INSPECTION FOR TRASH ENCLOSURE FOOTINGS AND PRIOR TO PAVING
4) CALL FOR ANY SITE/GRADING/LANDSCAPING CONCERNS}
09/14/2018 COT - ENGR - Signage Final Passed {Activity date: 09/14/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_COVER SHEET_1 OF 8.TIF DEVELOPMENT PACKAGE VIEW
002_NOTES_2 OF 8.TIF DEVELOPMENT PACKAGE VIEW
003_SITE_3 OF 8.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING / DRAINAGE_4 OF 8.TIF DEVELOPMENT PACKAGE VIEW
005_UTILITIES / EASEMENTS_5 OF 8.TIF DEVELOPMENT PACKAGE VIEW
006_DETAILS_6 OF 8.TIF DEVELOPMENT PACKAGE VIEW
007_LANDSCAPE / IRRIGATION_7 OF 8.TIF DEVELOPMENT PACKAGE VIEW
008_DETAILS_8 OF 8.TIF DEVELOPMENT PACKAGE VIEW
DRAINAGE STATEMENT DOCUMENTS VIEW
TRAFFIC IMPACT ANALYSIS DOCUMENTS VIEW
None DOCUMENTS VIEW