Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/14/2018 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 09/14/2018 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 10/02/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - MC MANUS CONSTR WILL BE WORKING ON COMMERCIAL SHELL, MATT 406-239-3008
NO CONTACT FOR INSPECTION, LEFT PHONE MESSAGE, CALL FOR RE-INSPECTION |
| 08/16/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) TRASH ENCLOSURE DETAIL ON APPROVED PLANS NOT PER COT DEV STD 6-0.10.
2) FOLLOW UP INSPECTION FOR SITE WORK, NO CONCERNS AT THIS TIME
3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 06/21/2017 |
ENGR Grading Final |
DROBERTS |
Not ready for Inspection |
Entered by DROBERT5 - NO WORK ON THIS SITE AT THIS TIME, THIS INSPECTION WILL BE RESCHEDULED AT A LATERT DATE, 8/28/2017 |
| 09/14/2018 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 10/02/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - MC MANUS CONSTR WILL BE WORKING ON COMMERCIAL SHELL, MATT 406-239-3008
NO CONTACT FOR INSPECTION, LEFT PHONE MESSAGE, CALL FOR RE-INSPECTION |
| 08/29/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES NO CONCERNS |
| 07/11/2017 |
ENGR Grading Final |
DROBERTS |
Correction Required |
Entered by DROBERT5 - TALKED TO LOREN MAKUS AND HAVE ASKED HIM TO VERIFY THAT THIS SITE IS REQUIRED A SWPPP AND THIS WILL NEED TO BE DONE BY KEVIN HALL WITH CYPRESS ENGINEERING ASAP. |
| 07/07/2017 |
ENGR Grading Final |
DROBERTS |
Correction Required |
Entered by DROBERT5 - WENT BY THE SITE TO SEE HOW THE WORK IS GOING AT THIS TIME. I ASKED THE CONTRACTOR WHERE HIS NOI WAS POSTED, HE ADVISED ME THAT HE WAS NOT REQUIRED A SWPPP PLAN FOR THIS SITE SINCE IT IS LESS THAN AN ACRE. I ADVISED HIM TO HAVE THE ENGINEER OF RECORD CHECK TO VERIFY THAT THEY ARE NOT REQUIRED A SWPPP. THEY ARE PART OF A SITE AND WERE REQUIRED A SWPPP PER THE STAT REGULATIONS, THEY ARE A PART OF A LARGER SITE.
THE WORK IS JUST STARTING SO I HAVE ADVISED THEM TO PLACE BMP'S IN THE LOW AREAS OF THE SITE TO MAITAIN THE SEDIMENTS IF IT RAINS IN THE NEAR FUTURE. |
| 09/14/2018 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 10/16/2017 |
ENGR Grading Final |
MRUSSO |
Partial Approval |
Entered by DROBERT5 - RE-BAR INSTALLED PER APPROVED PLAN - OK TO COVER |
| 09/28/2017 |
ENGR Grading Final |
MRUSS0 |
Continued |
Entered by DROBERT5 - LOOKED AT TRASH ENCLOSURE WALLS - OK TO GROUT |
| 09/19/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) LOOKED AT FOOTINGS FOR FOUR TRASH ENCLOSURES.
RE-BAR AND FOOTINGS INSTALLED PER APPROVED COT STD DTL. OK FOR CONCRETE
2) ENSURE 10' INSIDE CLEAR WIDTH FOR ALL TRASH ENCLOSURES |