Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP17-0032
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/14/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
09/14/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
10/02/2017 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - MC MANUS CONSTR WILL BE WORKING ON COMMERCIAL SHELL, MATT 406-239-3008 NO CONTACT FOR INSPECTION, LEFT PHONE MESSAGE, CALL FOR RE-INSPECTION |
08/16/2017 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) TRASH ENCLOSURE DETAIL ON APPROVED PLANS NOT PER COT DEV STD 6-0.10. 2) FOLLOW UP INSPECTION FOR SITE WORK, NO CONCERNS AT THIS TIME 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
06/21/2017 | ENGR Grading Final | DROBERTS | Not ready for Inspection | Entered by DROBERT5 - NO WORK ON THIS SITE AT THIS TIME, THIS INSPECTION WILL BE RESCHEDULED AT A LATERT DATE, 8/28/2017 |
09/14/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
10/02/2017 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - MC MANUS CONSTR WILL BE WORKING ON COMMERCIAL SHELL, MATT 406-239-3008 NO CONTACT FOR INSPECTION, LEFT PHONE MESSAGE, CALL FOR RE-INSPECTION |
08/29/2017 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES NO CONCERNS |
07/11/2017 | ENGR Grading Final | DROBERTS | Correction Required | Entered by DROBERT5 - TALKED TO LOREN MAKUS AND HAVE ASKED HIM TO VERIFY THAT THIS SITE IS REQUIRED A SWPPP AND THIS WILL NEED TO BE DONE BY KEVIN HALL WITH CYPRESS ENGINEERING ASAP. |
07/07/2017 | ENGR Grading Final | DROBERTS | Correction Required | Entered by DROBERT5 - WENT BY THE SITE TO SEE HOW THE WORK IS GOING AT THIS TIME. I ASKED THE CONTRACTOR WHERE HIS NOI WAS POSTED, HE ADVISED ME THAT HE WAS NOT REQUIRED A SWPPP PLAN FOR THIS SITE SINCE IT IS LESS THAN AN ACRE. I ADVISED HIM TO HAVE THE ENGINEER OF RECORD CHECK TO VERIFY THAT THEY ARE NOT REQUIRED A SWPPP. THEY ARE PART OF A SITE AND WERE REQUIRED A SWPPP PER THE STAT REGULATIONS, THEY ARE A PART OF A LARGER SITE. THE WORK IS JUST STARTING SO I HAVE ADVISED THEM TO PLACE BMP'S IN THE LOW AREAS OF THE SITE TO MAITAIN THE SEDIMENTS IF IT RAINS IN THE NEAR FUTURE. |
09/14/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
10/16/2017 | ENGR Grading Final | MRUSSO | Partial Approval | Entered by DROBERT5 - RE-BAR INSTALLED PER APPROVED PLAN - OK TO COVER |
09/28/2017 | ENGR Grading Final | MRUSS0 | Continued | Entered by DROBERT5 - LOOKED AT TRASH ENCLOSURE WALLS - OK TO GROUT |
09/19/2017 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) LOOKED AT FOOTINGS FOR FOUR TRASH ENCLOSURES. RE-BAR AND FOOTINGS INSTALLED PER APPROVED COT STD DTL. OK FOR CONCRETE 2) ENSURE 10' INSIDE CLEAR WIDTH FOR ALL TRASH ENCLOSURES |