Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 08/16/2017 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 07/12/2017 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Continued |
Entered by DROBERT5 - PER DAVE ROBERTS OF THE ENG. SECTION PDSD THIS SITE WILL REQUIRE A SWPPP EVEN THOUGH IT'S LESS THAN 1 ACRE, DUE TO THE FACT THAT ITS PART OF A BIGGER DEVELOPMENT:
1) PROVIDE A STORM WATER PLAN
2) POST A COPY OF YOUR NOI
3) INSTALL SEDIMENT CONTROLS AT PERIMETER OF SITE PER YOUR SWPPP
4) INSTALL A STABILIZED ENTRANCE
5) INSTALL A CONCRETE WASH OUT
6) PERFORM STORM WATER SELF INSPECTIONS PER YOUR PERMIT
|