Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP17-0032
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/14/2018 | PDSD Engineering Division Pre-Construction SITE | DROBERTS | Approved | Entered by KROBLES1 - PER DROBERTS |
07/12/2017 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by DROBERT5 - PER DAVE ROBERTS OF THE ENG. SECTION PDSD THIS SITE WILL REQUIRE A SWPPP EVEN THOUGH IT'S LESS THAN 1 ACRE, DUE TO THE FACT THAT ITS PART OF A BIGGER DEVELOPMENT: 1) PROVIDE A STORM WATER PLAN 2) POST A COPY OF YOUR NOI 3) INSTALL SEDIMENT CONTROLS AT PERIMETER OF SITE PER YOUR SWPPP 4) INSTALL A STABILIZED ENTRANCE 5) INSTALL A CONCRETE WASH OUT 6) PERFORM STORM WATER SELF INSPECTIONS PER YOUR PERMIT |
07/10/2017 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE THERFORE NO SWPPP IS REQUIRED 2) SWEEP UP TRACKED SOIL AS NEEDED 3) CALL FOR INSPECTION FOR TRASH ENCLOSURE FOOTINGS AND PRIOR TO PAVING 4) CALL FOR ANY SITE/GRADING/LANDSCAPING CONCERNS |