Permit: DP16-0232
Permit Details
Apply Date:
12/20/2016
Applicant:
Description:
SITE/GRADING - Taqueria La Esquina1st Revision is pending (Sept/Oct 2019)
Permit Reviews
Permit Number - DP16-0232
Permit Status: Complete
Permit Description: SITE/GRADING - Taqueria La Esquina1st Revision is pending (Sept/Oct 2019)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/27/2020 | DEV PKG - REVISION | 03/27/2020 | COMPLETED |
| 03/22/2017 | SITE and/or GRADING | 04/25/2017 | COMPLETED |
| 09/06/2019 | DEV PKG - OK TO SUBMIT | 10/10/2019 | COMPLETED |
| 10/10/2019 | DEV PKG - REVISION | 11/13/2019 | COMPLETED |
| 10/24/2017 | RESUB - SITE/GRADING ALL | 12/01/2017 | COMPLETED |
| 12/01/2017 | RESUB - SITE/GRADING ALL | 03/19/2019 | COMPLETED |
| 12/20/2016 | DEV PKG - OK TO SUBMIT | 12/28/2016 | COMPLETED |
| 12/28/2016 | SITE and/or GRADING | 01/30/2017 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP16-0232
Permit Description: SITE/GRADING - Taqueria La Esquina1st Revision is pending (Sept/Oct 2019)
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/29/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - General contractor Rand 3496989. Call for grading intermediate inspection after final grading out prior to landscaping. Contact your site engineer and landscape architect about any changes. Inspector acceptable with a plant screen wall If acceptable with Steve Shields as stated by the builder. Comply with all rain harvesting requirements.} |
|
| 01/28/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 01/28/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - } ; {Activity date: 08/29/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is minor track out onto Irvington rd} | |
| 01/28/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 01/28/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - } | |
| 04/02/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 04/02/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 01/28/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - PROVIDE ALL CLOSEOUT DOCUMENTATION PRIOR TO SCHEDULING THIS INSPECTION. THIS WILL INCLUDE BUT IS NOT LIMITED TO A NOTICE OF TERMINATION FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY, CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, AND APPROVED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS } |
|
| 05/01/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 05/01/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - } ; {Activity date: 04/02/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Provide 9 inches depth at water harvesting areas C, especially at the east end. Steak trees as shown on plant detail. Provide the quantity of small plant shown on your approval plan. Provide long-term bicycle parking, which is noted to be inside the building. Remove construction debris and plastic covering truncated dome‘s.} | |
| 05/01/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 05/01/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - } ; {Activity date: 04/02/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Provide 9 inches depth at water harvesting areas C, especially at the east end. Steak trees as shown on plant detail. Provide the quantity of small plant shown on your approval plan. Provide long-term bicycle parking, which is noted to be inside the building. Remove construction debris and plastic covering truncated dome‘s.} | |
| 05/01/2020 | ENGR Engineering Final | Passed | {Activity date: 05/01/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 05/01/2020 | ENGR Grading Final | Passed | {Activity date: 05/01/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/28/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - PROVIDE APPROVED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE SO THIS INSPECTION CAN BE COMPLETED.} ; {Activity date: 09/04/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Dave and I met with Rand on-site and discussed potential requirements within the right of way as well as the hazards present by a potential unpermitted addition to the adjacent property located at 4830 N. 6th Ave. We informed Rand that permits and potential upgrades are required if work is done within the right of way, and suggested that he contact his engineer and city of Tucson plan review for further information and that whatever work is done needs to be shown on the city approved plans.} ; {Activity date: 08/29/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor has removed existing asphalt and it’s about to start final grading.} |
|
| 05/01/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 05/01/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |