Permit Details

Status:
Complete
Type:
Development Package
Address:
4876 S 6TH AV
Address NEW:
4876 S 6TH AV
Apply Date:
12/20/2016
Applicant:
Description:
SITE/GRADING - Taqueria La Esquina1st Revision is pending (Sept/Oct 2019)

Permit Reviews

Permit Number - DP16-0232
Permit Status: Complete
Permit Description: SITE/GRADING - Taqueria La Esquina1st Revision is pending (Sept/Oct 2019)
Start Date Submittal Complete Date Status  
02/27/2020 DEV PKG - REVISION 03/27/2020 COMPLETED Review Details
03/22/2017 SITE and/or GRADING 04/25/2017 COMPLETED Review Details
09/06/2019 DEV PKG - OK TO SUBMIT 10/10/2019 COMPLETED Review Details
10/10/2019 DEV PKG - REVISION 11/13/2019 COMPLETED Review Details
10/24/2017 RESUB - SITE/GRADING ALL 12/01/2017 COMPLETED Review Details
12/01/2017 RESUB - SITE/GRADING ALL 03/19/2019 COMPLETED Review Details
12/20/2016 DEV PKG - OK TO SUBMIT 12/28/2016 COMPLETED Review Details
12/28/2016 SITE and/or GRADING 01/30/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0232
Permit Description: SITE/GRADING - Taqueria La Esquina1st Revision is pending (Sept/Oct 2019)
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/29/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/29/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - General contractor Rand 3496989. Call for grading intermediate inspection after final grading out prior to landscaping.
Contact your site engineer and landscape architect about any changes. Inspector acceptable with a plant screen wall If acceptable with Steve Shields as stated by the builder. Comply with all rain harvesting requirements.}
01/28/2020 SITE - Stormwater Follow-up Passed {Activity date: 01/28/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - } ; {Activity date: 08/29/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is minor track out onto Irvington rd}
01/28/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 01/28/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - }
04/02/2020 SITE - Stormwater Final Inspection Passed {Activity date: 04/02/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 01/28/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - PROVIDE ALL CLOSEOUT DOCUMENTATION PRIOR TO SCHEDULING THIS INSPECTION.
THIS WILL INCLUDE BUT IS NOT LIMITED TO A NOTICE OF TERMINATION FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY, CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, AND APPROVED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS
}
05/01/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 05/01/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - } ; {Activity date: 04/02/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Provide 9 inches depth at water harvesting areas C, especially at the east end. Steak trees as shown on plant detail. Provide the quantity of small plant shown on your approval plan. Provide long-term bicycle parking, which is noted to be inside the building. Remove construction debris and plastic covering truncated dome‘s.}
05/01/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 05/01/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - } ; {Activity date: 04/02/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Provide 9 inches depth at water harvesting areas C, especially at the east end. Steak trees as shown on plant detail. Provide the quantity of small plant shown on your approval plan. Provide long-term bicycle parking, which is noted to be inside the building. Remove construction debris and plastic covering truncated dome‘s.}
05/01/2020 ENGR Engineering Final Passed {Activity date: 05/01/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
05/01/2020 ENGR Grading Final Passed {Activity date: 05/01/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/28/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - PROVIDE APPROVED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE SO THIS INSPECTION CAN BE COMPLETED.} ; {Activity date: 09/04/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Dave and I met with Rand on-site and discussed potential requirements within the right of way as well as the hazards present by a potential unpermitted addition to the adjacent property located at 4830 N. 6th Ave.
We informed Rand that permits and potential upgrades are required if work is done within the right of way, and suggested that he contact his engineer and city of Tucson plan review for further information and that whatever work is done needs to be shown on the city approved plans.} ; {Activity date: 08/29/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor has removed existing asphalt and it’s about to start final grading.}
05/01/2020 COT - ENGR - Signage Final Passed {Activity date: 05/01/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
1-7 OF 7.PDF DEVELOPMENT PACKAGE VIEW
COMMENT_LETTER, 02.27.2020.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
PERMIT EXTENSION TO 09.28.2019.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW