Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 08/29/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by DMERANZ1 - General contractor Rand 3496989. Call for grading intermediate inspection after final grading out prior to landscaping.
Contact your site engineer and landscape architect about any changes. Inspector acceptable with a plant screen wall If acceptable with Steve Shields as stated by the builder. Comply with all rain harvesting requirements. |