Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
20 S STONE AV
Address NEW:
20 S STONE AV
Apply Date:
11/14/2016
Applicant:
Lisa Bowers
Description:
SITE/GRADING - RendezVous Urban Flats

Permit Reviews

Permit Number - DP16-0200
Permit Status: Complete
Permit Description: SITE/GRADING - RendezVous Urban Flats
Start Date Submittal Complete Date Status  
03/02/2020 DEV PKG - OK TO SUBMIT 04/01/2020 COMPLETED Review Details
04/01/2020 REVISION - - 1ST 04/01/2020 COMPLETED Review Details
05/15/2020 REVISION - - 1ST 06/02/2020 COMPLETED Review Details
06/29/2017 DEV PKG - RESUBMITTAL 09/01/2017 COMPLETED Review Details
07/09/2020 REVISION - - 1ST 07/17/2020 COMPLETED Review Details
09/01/2017 DEV PKG - RESUBMITTAL 10/11/2017 COMPLETED Review Details
10/11/2017 DEV PKG - RESUBMITTAL 11/20/2018 COMPLETED Review Details
11/14/2016 DEV PKG - OK TO SUBMIT 11/14/2016 COMPLETED Review Details
11/14/2016 DEV PKG 06/29/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0200
Permit Description: SITE/GRADING - RendezVous Urban Flats
Total Completed Inspections - 9
Date Description Inspector Results Comments
06/30/2020 COT - ENGR - Signage Final Passed {Activity date: 06/30/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - APPROVED} ; {Activity date: 06/26/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Please provide contact information when scheduling inspections. Please schedule all the remaining inspections for your development package permit. Terminate SWPPP if applicable.}
07/01/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 07/01/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/26/2020; Status: Not Applicable; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not applicable.
}
07/01/2020 SITE - Stormwater Follow-up Passed {Activity date: 07/01/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/28/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, THE STORMWATER CONTROLS ARE WORKING AS DESIGNED.}
07/01/2020 ENGR Grading Final Passed {Activity date: 07/01/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/01/2020 SITE - Stormwater Final Inspection Passed {Activity date: 07/01/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/30/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - ARTIAL, PROVIDE CLOSEOUT DOCUMENTATION NOTICE OF TERMINATION FROM ARIZONA DEPT.OF ENVIRONMENTAL QUALITY, APPROVED REVISED DRAWINGS FOR ALL CHANGES.} ; {Activity date: 06/26/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Please provide contact information when scheduling inspections. Please schedule all the remaining inspections for your development package permit. Terminate SWPPP if applicable.}
07/01/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 07/01/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/01/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/01/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/26/2020; Status: Denied; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Denied. No history preconstruction meeting and no contact information provided. Project appears to be nearing completion.}
07/21/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 07/21/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/13/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS NOT READY AT THIS TIME, COMPLETE THE LANDSCAPE INSTALLATION PRIOR TO SCHEDULING THE FINAL INSPECTION} ; {Activity date: 06/30/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - PARTIAL TILL ALL OTHER COMMENTS HAVE BEEN ADDRESSED. NOTED CRACKS IN THE SIDEWALKS AT VARIOUS LOCATIONS THROUGHOUT THIS SITE, MAKE THE NECESSARY REPAIRS OR REMOVE AND REPLACE ALL AREAS THAT CONTAIN MORE THAN 1 CRACK PER PANEL. IF ANY OF THESE AREAS ARE WITHIN THE RIGHT-OF-WAY CONTACT CITY OF TUCSON TRANSPORTATION FOR THEIR RECOMMENDED REPAIR METHOD.
ALSO ALONG THE WEST AND SOUTH SIDE OF THE STRUCTURE IT HAS BEEN NOTED THAT THERE ARE 2 SECTIONS OF SIDEWALK THAT NEED HAND RAIL ON BOTH SIDES OF THE SIDEWALK. 1) ON THE SOUTH SIDE OF THE BUILDING THERE IS A SIDEWALK THE EXCEEDS MORE THAN 5% (5% - -7%)IN THE RUNNING SLOPE. THIS AREA SHOULD HAVE HANDRAIL ON BOTH SIDES OF THE SIDEWALK TILL THE SLOPE IS LESS THAN 5%. 2) ON THE WEST SIDE OF THE BUILDING HEADING NORTH FROM THE SOUTH WEST CORNER THERE ARE 2 RAMPS SECTIONS OF SIDEWALK WITH HANDRAIL ALONG THE EAST SIDE OF THE SIDEWALK, HANDRAIL IS NEED ON BOTH SIDES OF SIDEWALK (34” - 38” above the sidewalk)I CHECKED THIS AREA AND FIN IT TO BE 6% TO 7%, I WILL ASK BRIAN BENNEDON TO CHECK THESE AREAS OUT ON 7/1/2020.

}
07/21/2020 ENGR Engineering Final Passed {Activity date: 07/21/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/13/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS PARTIAL AT THIS TIME, OBSERVED THE LOOK OF THE CURRENT CRACK REPAIRS ON THE WEST AND NORTH WEST SIDES OF THE BUILDING, THIS LOOKED ACCEPTABLE AT THIS TIME. I HAVE REMINDED THE CONTRACTOR THAT THEY WILL NEED TO CHECK ALL CRACKS ON THIS JOB SITE TOO SEE IF THERE IS ANY MOVEMENT IN THE SIDEWALKS. THEY HAVE BEEN ADVISED THAT ANY SIDEWALK PANEL WITH MORE THAN ONE CRACK, OR SIGNS OF MOVEMENT WILL REQUIRE THAT THEY NEED TO REMOVE AND REPOUR THE DAMAGED SECTIONS. THEY ARE CURRENTLY USING A 2 PART LIQUID EPOXY TO REPAIR THE DAMAGED SECTIONS OF SIDEWALKS.} ; {Activity date: 07/07/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS PARTIAL AT THIS TIME, SITE VISIT WITH KEVIN TO LOOK AT WORK COMPLETED AT THIS TIME. THE HANDRAIL HAS BEEN INSTALLED ON THE WEST SIDE OF THE BUILDING BUT IS STILL MISSING ON THE SOUTH SIDE OF THE BUILDING. KEVIN WILL BE CONTACTING THE ARCHITECT FOR CLARIFICATION OF WHAT IS REQUIRED, HE WILL ALSO DISCUSS THIS ISSUE WITH BUILDING OFFICIAL, CLAYTON TREVILLYAN TO GETTING AN OFFICIAL DETERMINATION ON REQUIREMENTS.

} ; {Activity date: 07/06/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Not ready. Kevin at 480-413-3260} ; {Activity date: 07/02/2020; Status: Partial Approval; Inspector: BBENNEDON; Comment: Entered by JSCHNEI2 - Partially approved. Accessible parking and long-term bicycle parking. Is OK. Via remote inspection with Kevin at 480-341-3260} ; {Activity date: 06/30/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - PARTIAL TILL ALL OTHER COMMENTS HAVE BEEN ADDRESSED. NOTED CRACKS IN THE SIDEWALKS AT VARIOUS LOCATIONS THROUGHOUT THIS SITE, MAKE THE NECESSARY REPAIRS OR REMOVE AND REPLACE ALL AREAS THAT CONTAIN MORE THAN 1 CRACK PER PANEL. IF ANY OF THESE AREAS ARE WITHIN THE RIGHT-OF-WAY CONTACT CITY OF TUCSON TRANSPORTATION FOR THEIR RECOMMENDED REPAIR METHOD.
ALSO ALONG THE WEST AND SOUTH SIDE OF THE STRUCTURE IT HAS BEEN NOTED THAT THERE ARE 2 SECTIONS OF SIDEWALK THAT NEED HAND RAIL ON BOTH SIDES OF THE SIDEWALK. 1) ON THE SOUTH SIDE OF THE BUILDING THERE IS A SIDEWALK THE EXCEEDS MORE THAN 5% (5% - -7%)IN THE RUNNING SLOPE. THIS AREA SHOULD HAVE HANDRAIL ON BOTH SIDES OF THE SIDEWALK TILL THE SLOPE IS LESS THAN 5%. 2) ON THE WEST SIDE OF THE BUILDING HEADING NORTH FROM THE SOUTH WEST CORNER THERE ARE 2 RAMPS SECTIONS OF SIDEWALK WITH HANDRAIL ALONG THE EAST SIDE OF THE SIDEWALK, HANDRAIL IS NEED ON BOTH SIDES OF SIDEWALK (34” - 38” above the sidewalk)I CHECKED THIS AREA AND FIN IT TO BE 6% TO 7%, I WILL ASK BRIAN BENNEDON TO CHECK THESE AREAS OUT ON 7/1/2020.

} ; {Activity date: 06/26/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Please provide contact information when scheduling inspections. Please schedule all the remaining inspections for your development package permit. Terminate SWPPP if applicable.}

Documents

File Name Document Type  
1-20 OF 20.PDF DEVELOPMENT PACKAGE VIEW
RENDRESP, 07.08.20.PDF DOCUMENTS VIEW
RECORDED RECIPROCAL EASEMENT AND OPERATING AGREEMENT BETWEEN 1SC PARTNERS LLC AND RENDEZVOUS URBAN FLATS LLC.PDF DOCUMENTS VIEW
REVISION LETTER, 03.30.2020.PDF DOCUMENTS VIEW
001_GENERAL NOTES_C001.TIF DEVELOPMENT PACKAGE VIEW
002_CIVIL COVER PAGE_C100.TIF DEVELOPMENT PACKAGE VIEW
003_GENERAL NOTES_C101.TIF DEVELOPMENT PACKAGE VIEW
004_DEMOLITION PLAN_C200.TIF DEVELOPMENT PACKAGE VIEW
005_HORIZONTAL CONTROL_C300.TIF DEVELOPMENT PACKAGE VIEW
006_SITE PLAN_C400.TIF DEVELOPMENT PACKAGE VIEW
007_GRADING PLAN_C500.TIF DEVELOPMENT PACKAGE VIEW
008_DETAIL GRADING_C501.TIF DEVELOPMENT PACKAGE VIEW
009_UTILITY PLAN_C600.TIF DEVELOPMENT PACKAGE VIEW
010_SITE DETAILS_C700.TIF DEVELOPMENT PACKAGE VIEW
011_LANDSCAPE LAYOUT_L100.TIF DEVELOPMENT PACKAGE VIEW
012_PLANTING PLAN_L200.TIF DEVELOPMENT PACKAGE VIEW
013_IRRIGATION PLAN_L300.TIF DEVELOPMENT PACKAGE VIEW
014_LANDSCAPE DETAILS_L400.TIF DEVELOPMENT PACKAGE VIEW
015_LANDSCAPE DETAILS_L401.TIF DEVELOPMENT PACKAGE VIEW
016_EXISTING PARKING LEVEL P1_A001.TIF DEVELOPMENT PACKAGE VIEW
017_EXISTING PARKING LEVEL P2_A002.TIF DEVELOPMENT PACKAGE VIEW
018_EXISTING PARKING LEVEL P3_A003.TIF DEVELOPMENT PACKAGE VIEW
019_PLAN OVERALL SITE_A101.TIF DEVELOPMENT PACKAGE VIEW
020_AERIAL EASEMENT SITE PLAN_A102.TIF DEVELOPMENT PACKAGE VIEW
COMMENT_ADDRESSING.PDF DOCUMENTS VIEW
COMMENT SUMMARY_ADDRESSING.PDF DOCUMENTS VIEW
COMMENT 2_ADDRESSING.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
TRAFFIC IMPACT STATEMENT.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW