Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
Permit Number - DP16-0200
Inspection Description - PDSD Site/Engineering Division - Landscaping
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2020 | PDSD Site/Engineering Division - Landscaping | BBENNEDON | Approved | Entered by JSCHNEI2 - Approved. |
| 06/30/2020 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Approved | Entered by RSALDAT1 - APPROVED |
| 06/26/2020 | PDSD Site/Engineering Division - Landscaping | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Please provide contact information when scheduling inspections. Please schedule all the remaining inspections for your development package permit. Terminate SWPPP if applicable. |
| 07/21/2020 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Approved | Entered by DROBERT5 - |
| 07/13/2020 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Not ready for Inspection | Entered by RSALDAT1 - IS NOT READY AT THIS TIME, COMPLETE THE LANDSCAPE INSTALLATION PRIOR TO SCHEDULING THE FINAL INSPECTION |
| 06/30/2020 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Partial Approval | Entered by DROBERT5 - PARTIAL TILL ALL OTHER COMMENTS HAVE BEEN ADDRESSED. NOTED CRACKS IN THE SIDEWALKS AT VARIOUS LOCATIONS THROUGHOUT THIS SITE, MAKE THE NECESSARY REPAIRS OR REMOVE AND REPLACE ALL AREAS THAT CONTAIN MORE THAN 1 CRACK PER PANEL. IF ANY OF THESE AREAS ARE WITHIN THE RIGHT-OF-WAY CONTACT CITY OF TUCSON TRANSPORTATION FOR THEIR RECOMMENDED REPAIR METHOD. ALSO ALONG THE WEST AND SOUTH SIDE OF THE STRUCTURE IT HAS BEEN NOTED THAT THERE ARE 2 SECTIONS OF SIDEWALK THAT NEED HAND RAIL ON BOTH SIDES OF THE SIDEWALK. 1) ON THE SOUTH SIDE OF THE BUILDING THERE IS A SIDEWALK THE EXCEEDS MORE THAN 5% (5% - -7%)IN THE RUNNING SLOPE. THIS AREA SHOULD HAVE HANDRAIL ON BOTH SIDES OF THE SIDEWALK TILL THE SLOPE IS LESS THAN 5%. 2) ON THE WEST SIDE OF THE BUILDING HEADING NORTH FROM THE SOUTH WEST CORNER THERE ARE 2 RAMPS SECTIONS OF SIDEWALK WITH HANDRAIL ALONG THE EAST SIDE OF THE SIDEWALK, HANDRAIL IS NEED ON BOTH SIDES OF SIDEWALK (34” - 38” above the sidewalk)I CHECKED THIS AREA AND FIN IT TO BE 6% TO 7%, I WILL ASK BRIAN BENNEDON TO CHECK THESE AREAS OUT ON 7/1/2020. |