Permit Details

Status:
Complete
Type:
Development Package
Address:
635 W ROGER RD
Apply Date:
08/22/2016
Applicant:
Lisa Bowers
Description:
SITE/GRADING/SWPPP-HSSA ANIMAL WELFARE CENTEROriginal Approval: 01/04/2017 (20 pages)1st Revis

Permit Reviews

Permit Number - DP16-0150
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP-HSSA ANIMAL WELFARE CENTEROriginal Approval: 01/04/2017 (20 pages)1st Revis
Start Date Submittal Complete Date Status  
04/09/2018 DEV PKG - REVISION 04/20/2018 COMPLETED Review Details
05/04/2017 DEV PKG - REVISION 05/17/2017 COMPLETED Review Details
05/17/2017 DEV PKG - REVISION 06/26/2017 COMPLETED Review Details
08/22/2016 DEV PKG - OK TO SUBMIT 08/22/2016 COMPLETED Review Details
08/22/2016 DEV PKG 09/30/2016 COMPLETED Review Details
11/15/2016 DEV PKG - RESUBMITTAL 12/13/2016 COMPLETED Review Details
12/06/2017 DEV PKG - REVISION 12/13/2017 COMPLETED Review Details
12/30/2016 DEV PKG - RESUBMITTAL 01/11/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0150
Permit Description: SITE/GRADING/SWPPP-HSSA ANIMAL WELFARE CENTEROriginal Approval: 01/04/2017 (20 pages)1st Revis
Total Completed Inspections - 10
Date Description Inspector Results Comments
02/08/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/08/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER SWPPP
2) INSTALL A CONCRETE/MATERIALS WASH OUT
3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE
4) PERFORM SELF INSPECTIONS PER PLAN
5) CALL FOR INSPECTION ANY SITE/GRADING/LANDSCAPING CONCERNS.
6) POST A COPY OF YOUR NOI ON SITE
7) ADD SEDIMENT CONTROLS ALONG WEST SIDE OF SITE AND AROUND THE STOCKPILE}
03/17/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 03/17/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
01/29/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 01/29/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
03/27/2018 SITE - Stormwater Follow-up Passed {Activity date: 03/27/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - ALL ITEMS APPEAR TO BECOMPLETE AT THIS TIME, ALL AREAS WILL BE RECHECKED ON THE FINAL} ; {Activity date: 02/22/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE IS NOT READY AT THIS TIME FOR THE CLOSURE OF THE STORMWATER INSPECTIONS, THE SOUTHERN HALF OF THE SITE IS STILL BEING CONSTRUCTED ON} ; {Activity date: 01/29/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/25/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE SEDIMENT CONTROLS REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETED
2) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAYS
3) PERFORM SELF INSPECTIONS PER YOUR SWPPP} ; {Activity date: 03/17/2017; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by DROBERT5 - RE-ESTABLISH SEDIMENT CONTROLS ALONG THE WEST SIDE, CALL FOR RE-INSPECTION}
03/27/2018 ENGR Grading Final Passed {Activity date: 03/27/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - ALL ITEMS APPEAR TO BECOMPLETE AT THIS TIME, ALL AREAS WILL BE RECHECKED ON THE FINAL}
03/27/2018 COT - ENGR - Signage Final Passed {Activity date: 03/27/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - ALL ITEMS APPEAR TO BECOMPLETE AT THIS TIME, ALL AREAS WILL BE RECHECKED ON THE FINAL}
04/26/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 04/26/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/27/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE FOLLOWING ITEMS WILL BE REQUIRED FOR THE FINAL CLOSURE OF THE REMAINING ITEMS:
1) APPROVED REVISED DRAWINGS FOR ALL CHANGES MADE TO THIS SITE.
2) CERTIFICATIONS LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE.(STAMPING ENGINEER)
3) COMPLETE ALL SITE WORK AND ENSURE THE GENERAL CLEAN UP OF THE SITE IS COMPLETED.
4) NOTICCE OF TERMINATION LETTER FROM THE STATE FOR THE SWPPP'S ON THIS SITE.
5) COMPLETE ALL THE LANDSCAPING INSTALLATION AS SHOWN ON THE APPROVED PLANS FOR THIS SITE.} ; {Activity date: 02/22/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE IS NOT READY AT THIS TIME, COMPLETE ALL THE WORK ON THIS SITE PRIOR TO CALLING IN FOR THE FINAL INSPECTION.}
04/26/2018 SITE - Zoning Final Passed {Activity date: 04/26/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/27/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE FOLLOWING ITEMS WILL BE REQUIRED FOR THE FINAL CLOSURE OF THE REMAINING ITEMS:
1) APPROVED REVISED DRAWINGS FOR ALL CHANGES MADE TO THIS SITE.
2) CERTIFICATIONS LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE.(STAMPING ENGINEER)
3) COMPLETE ALL SITE WORK AND ENSURE THE GENERAL CLEAN UP OF THE SITE IS COMPLETED.
4) NOTICCE OF TERMINATION LETTER FROM THE STATE FOR THE SWPPP'S ON THIS SITE.
5) COMPLETE ALL THE LANDSCAPING INSTALLATION AS SHOWN ON THE APPROVED PLANS FOR THIS SITE.}
04/26/2018 ENGR Engineering Final Passed {Activity date: 04/26/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/27/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE FOLLOWING ITEMS WILL BE REQUIRED FOR THE FINAL CLOSURE OF THE REMAINING ITEMS:
1) APPROVED REVISED DRAWINGS FOR ALL CHANGES MADE TO THIS SITE.
2) CERTIFICATIONS LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE.(STAMPING ENGINEER)
3) COMPLETE ALL SITE WORK AND ENSURE THE GENERAL CLEAN UP OF THE SITE IS COMPLETED.
4) NOTICCE OF TERMINATION LETTER FROM THE STATE FOR THE SWPPP'S ON THIS SITE.
5) COMPLETE ALL THE LANDSCAPING INSTALLATION AS SHOWN ON THE APPROVED PLANS FOR THIS SITE.}
04/26/2018 SITE - Stormwater Final Inspection Passed {Activity date: 04/26/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/27/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE FOLLOWING ITEMS WILL BE REQUIRED FOR THE FINAL CLOSURE OF THE REMAINING ITEMS:
1) APPROVED REVISED DRAWINGS FOR ALL CHANGES MADE TO THIS SITE.
2) CERTIFICATIONS LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE.(STAMPING ENGINEER)
3) COMPLETE ALL SITE WORK AND ENSURE THE GENERAL CLEAN UP OF THE SITE IS COMPLETED.
4) NOTICCE OF TERMINATION LETTER FROM THE STATE FOR THE SWPPP'S ON THIS SITE.
5) COMPLETE ALL THE LANDSCAPING INSTALLATION AS SHOWN ON THE APPROVED PLANS FOR THIS SITE.}

Documents

File Name Document Type  
DP16-0150 COMBINED.PDF DOCUMENTS VIEW
001_COVER SHEET_1 OF 20.TIF DEVELOPMENT PACKAGE VIEW
002_NOTES_2 OF 20.TIF DEVELOPMENT PACKAGE VIEW
003_SITE ( NORTH )_3 OF 20.TIF DEVELOPMENT PACKAGE VIEW
004_SITE ( SOUTH )_4 OF 20.TIF DEVELOPMENT PACKAGE VIEW
005_GRADING / DRAINAGE ( NORTH )_5 OF 20.TIF DEVELOPMENT PACKAGE VIEW
006_GRADING / DRAINAGE ( SOUTH )_6 OF 20.TIF DEVELOPMENT PACKAGE VIEW
007_UTILITIES / EASEMENTS ( NORTH )_7 OF 20.TIF DEVELOPMENT PACKAGE VIEW
008_UTILITIES / EASEMENTS ( SOUTH )_8 OF 20.TIF DEVELOPMENT PACKAGE VIEW
009_DETAILS_9 OF 20.TIF DEVELOPMENT PACKAGE VIEW
010_DETAILS_10 OF 20.TIF DEVELOPMENT PACKAGE VIEW
011_SWPPP_11 OF 20.TIF DEVELOPMENT PACKAGE VIEW
012_LANDSCAPE COVER_12 OF 20.TIF DEVELOPMENT PACKAGE VIEW
013_NPPP_13 OF 20.TIF DEVELOPMENT PACKAGE VIEW
014_NPPP_14 OF 20.TIF DEVELOPMENT PACKAGE VIEW
015_LANDSCAPE_15 OF 20.TIF DEVELOPMENT PACKAGE VIEW
016_LANDSCAPE_16 OF 20.TIF DEVELOPMENT PACKAGE VIEW
017_IRRIGATION_17 OF 20.TIF DEVELOPMENT PACKAGE VIEW
018_IRRIGATION_18 OF 20.TIF DEVELOPMENT PACKAGE VIEW
019_LANDSCAPE DETAILS_19 OF 20.TIF DEVELOPMENT PACKAGE VIEW
020_RAINWATER HARVESTING_20 OF 20.TIF DEVELOPMENT PACKAGE VIEW
2E_HSSA_DRAINAGE_REPORT_11-10-16.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW