Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Final Inspection
Permit Number - DP16-0150
Inspection Description - SITE - Stormwater Final Inspection
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/26/2018 | SITE - Stormwater Final Inspection | DROBERTS | Approved | Entered by DROBERT5 - |
03/27/2018 | SITE - Stormwater Final Inspection | DROBERTS | Partial Approval | Entered by DROBERT5 - THE FOLLOWING ITEMS WILL BE REQUIRED FOR THE FINAL CLOSURE OF THE REMAINING ITEMS: 1) APPROVED REVISED DRAWINGS FOR ALL CHANGES MADE TO THIS SITE. 2) CERTIFICATIONS LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE.(STAMPING ENGINEER) 3) COMPLETE ALL SITE WORK AND ENSURE THE GENERAL CLEAN UP OF THE SITE IS COMPLETED. 4) NOTICCE OF TERMINATION LETTER FROM THE STATE FOR THE SWPPP'S ON THIS SITE. 5) COMPLETE ALL THE LANDSCAPING INSTALLATION AS SHOWN ON THE APPROVED PLANS FOR THIS SITE. |