Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP16-0150
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/27/2018 | SITE - Stormwater Follow-up | DROBERTS | Approved | Entered by DROBERT5 - ALL ITEMS APPEAR TO BECOMPLETE AT THIS TIME, ALL AREAS WILL BE RECHECKED ON THE FINAL |
02/22/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - THIS SITE IS NOT READY AT THIS TIME FOR THE CLOSURE OF THE STORMWATER INSPECTIONS, THE SOUTHERN HALF OF THE SITE IS STILL BEING CONSTRUCTED ON |
01/29/2018 | SITE - Stormwater Follow-up | MRUSSO | Approved | Entered by DROBERT5 - |
04/25/2017 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) ENSURE SEDIMENT CONTROLS REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETED 2) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAYS 3) PERFORM SELF INSPECTIONS PER YOUR SWPPP |
03/17/2017 | SITE - Stormwater Follow-up | MRUSSO | Correction Required | Entered by DROBERT5 - RE-ESTABLISH SEDIMENT CONTROLS ALONG THE WEST SIDE, CALL FOR RE-INSPECTION |