Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 03/27/2018 |
SITE - Stormwater Follow-up
|
DROBERTS |
Approved |
Entered by DROBERT5 - ALL ITEMS APPEAR TO BECOMPLETE AT THIS TIME, ALL AREAS WILL BE RECHECKED ON THE FINAL |
| 02/22/2018 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by DROBERT5 - THIS SITE IS NOT READY AT THIS TIME FOR THE CLOSURE OF THE STORMWATER INSPECTIONS, THE SOUTHERN HALF OF THE SITE IS STILL BEING CONSTRUCTED ON |
| 01/29/2018 |
SITE - Stormwater Follow-up
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 04/25/2017 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) ENSURE SEDIMENT CONTROLS REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETED
2) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAYS
3) PERFORM SELF INSPECTIONS PER YOUR SWPPP |
| 03/17/2017 |
SITE - Stormwater Follow-up
|
MRUSSO |
Correction Required |
Entered by DROBERT5 - RE-ESTABLISH SEDIMENT CONTROLS ALONG THE WEST SIDE, CALL FOR RE-INSPECTION |