Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/08/2017 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER SWPPP
2) INSTALL A CONCRETE/MATERIALS WASH OUT
3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE
4) PERFORM SELF INSPECTIONS PER PLAN
5) CALL FOR INSPECTION ANY SITE/GRADING/LANDSCAPING CONCERNS.
6) POST A COPY OF YOUR NOI ON SITE
7) ADD SEDIMENT CONTROLS ALONG WEST SIDE OF SITE AND AROUND THE STOCKPILE |