Permit Details

Status:
Issued
Type:
Development Package
Address NEW:
1050 W IRVINGTON RD
Apply Date:
03/14/2016
Applicant:
Description:
Revision 18: update to lots 48, 49, started 04.01.2026 ** Revision 17 - TENTATIVE PLAT - Irvington & I-19 Commercial Center, Lots 1-47 plus Block "A" (private streets and u

Permit Reviews

Permit Number - DP16-0044
Permit Status: Issued
Permit Description: Revision 18: update to lots 48, 49, started 04.01.2026 ** Revision 17 - TENTATIVE PLAT - Irvington & I-19 Commercial Center, Lots 1-47 plus Block "A" (private streets and u
Start Date Submittal Complete Date Status  
01/24/2020 DEV PKG - OK TO SUBMIT 01/28/2020 COMPLETED Review Details
01/26/2017 REVISION - TENT PLAT & CORE RESUB 03/06/2017 COMPLETED Review Details
01/26/2021 DEV PKG - OK TO SUBMIT 02/12/2021 COMPLETED Review Details
01/28/2020 REVISION - TENT PLAT & CORE RESUB 03/16/2020 COMPLETED Review Details
02/12/2021 REVISION - TENT PLAT & CORE RESUB 09/06/2021 COMPLETED Review Details
02/14/2022 REVISION - TENT PLAT & CORE RESUB 03/31/2022 COMPLETED Review Details
02/18/2020 DEV PKG - OK TO SUBMIT 03/24/2020 COMPLETED Review Details
03/05/2018 REVISION - TENT PLAT & CORE RESUB 03/19/2018 COMPLETED Review Details
03/06/2017 REVISION - TENT PLAT & CORE RESUB 04/03/2017 COMPLETED Review Details
03/14/2016 DEV PKG - OK TO SUBMIT 03/25/2016 COMPLETED Review Details
03/24/2020 DEV PKG - REVISION 05/19/2020 COMPLETED Review Details
03/25/2016 DEV PKG 05/20/2016 COMPLETED Review Details
04/03/2017 REVISION - TENT PLAT & CORE RESUB 05/30/2017 COMPLETED Review Details
05/09/2018 REVISION - TENT PLAT & CORE RESUB 06/13/2018 COMPLETED Review Details
05/13/2019 REVISION - TENT PLAT & CORE RESUB 06/18/2019 COMPLETED Review Details
05/30/2017 REVISION - TENT PLAT & CORE RESUB 07/18/2017 COMPLETED Review Details
06/01/2016 TENTATIVE PLAT REVIEW 07/08/2016 COMPLETED Review Details
06/28/2019 REVISION - TENT PLAT & CORE RESUB 07/25/2019 COMPLETED Review Details
07/18/2017 REVISION - TENT PLAT & CORE RESUB 08/31/2017 COMPLETED Review Details
08/02/2018 REVISION - TENT PLAT & CORE RESUB 10/19/2018 COMPLETED Review Details
08/05/2016 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 09/01/2016 COMPLETED Review Details
08/16/2019 DEV PKG - REVISION 09/24/2019 COMPLETED Review Details
08/31/2017 REVISION - TENT PLAT & CORE RESUB 09/19/2017 COMPLETED Review Details
09/02/2016 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 09/22/2016 COMPLETED Review Details
09/02/2022 DEV PKG - OK TO SUBMIT 09/15/2022 COMPLETED Review Details
09/06/2021 DEV PKG - OK TO SUBMIT 09/23/2021 COMPLETED Review Details
09/15/2022 REVISION - TENT PLAT & CORE RESUB 10/20/2022 ACTIVE Review Details
09/23/2021 REVISION - TENT PLAT & CORE RESUB 10/28/2021 COMPLETED Review Details
10/19/2018 REVISION - TENT PLAT & CORE RESUB 10/31/2018 COMPLETED Review Details
10/28/2016 REVISION - TENT PLAT & CORE RESUB 01/26/2017 COMPLETED Review Details
10/28/2021 REVISION - TENT PLAT & CORE RESUB 11/23/2021 COMPLETED Review Details
12/16/2020 DEV PKG - OK TO SUBMIT 12/31/2020 COMPLETED Review Details
12/17/2021 DEV PKG - OK TO SUBMIT 12/27/2021 COMPLETED Review Details
12/22/2017 REVISION - TENT PLAT & CORE RESUB 03/05/2018 COMPLETED Review Details
12/27/2021 REVISION - TENT PLAT & CORE RESUB 02/07/2022 COMPLETED Review Details
12/31/2020 REVISION - TENT PLAT & CORE RESUB 01/08/2021 COMPLETED Review Details
11/27/2024 DEVELOPMENT PACKAGE NEW REVISION v.1 12/17/2024 APPROVED Review Details
04/16/2026 DEVELOPMENT PACKAGE NEW REVISION v.1 04/17/2026 REQUIRES RESUBMIT Review Details
04/20/2026 DEVELOPMENT PACKAGE NEW REVISION v.2 05/07/2026 REQUIRES RESUBMIT Review Details
05/15/2026 DEVELOPMENT PACKAGE NEW REVISION v.3 05/26/2026 APPROVED Review Details
10/28/2022 DEVELOPMENT PACKAGE REVIEW v.1 11/15/2022 APPROVED Review Details
02/28/2023 DEVELOPMENT PACKAGE REVIEW v.1 04/19/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - DP16-0044
Permit Status: Issued
Permit Description: Revision 18: update to lots 48, 49, started 04.01.2026 ** Revision 17 - TENTATIVE PLAT - Irvington & I-19 Commercial Center, Lots 1-47 plus Block "A" (private streets and u
Total Outstanding Activity Conditions - 1
Date Name
03/21/2023 This project requires submission and approval of a Private Improvement Agreement (PIA) prior to issuance of this permit.

Outstanding Inspections

Permit Status: Issued
Permit Number: DP16-0044
Permite Description: Revision 18: update to lots 48, 49, started 04.01.2026 ** Revision 17 - TENTATIVE PLAT - Irvington & I-19 Commercial Center, Lots 1-47 plus Block "A" (private streets and u
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
01/15/2021 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 01/15/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS CONTINUED, NO CONCERNS AT THIS TIME} ; {Activity date: 10/28/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues or concerns. Only track out is contained to the north end of site at Tucson water remediation project.} ; {Activity date: 10/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 08/13/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues} ; {Activity date: 07/21/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Minor truck out noted at the far north end of Property. New construction along eastern portion of site could use additional stormwater protections.} ; {Activity date: 07/16/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continue. No issues at this time.
} ; {Activity date: 06/25/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Mike with Borderland at 405-5613. Please check and make any corrections to stormwater protections as needed with the monsoon approaching. Catch basin at Southeast location next to building pad needs protection. Thanks

} ; {Activity date: 06/09/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. There’s track out the north west edge of Pavement. There is minor track out in the parking lot areas on the east side of the site and there are two catch basin’s that need stormwater protections installed.} ; {Activity date: 05/18/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Controls have been disturbed north of red Robin.} ; {Activity date: 03/25/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - New controls have been installed at new building locations. Existing controls remain in place} ; {Activity date: 01/30/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - All track out is contained within the site.} ; {Activity date: 01/09/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - THERE ARE NO CONCERNS AT THIS TIME FOR THIS SITE} ; {Activity date: 01/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - New controls have been installed where Construction is still in progress.} ; {Activity date: 11/08/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Track out on Irvington has been swept
} ; {Activity date: 11/07/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is track out onto Irvington Road, and within the site that needs to be cleaned. I spoke with Mike from Borderland. He has a street sweeper scheduled and will be completing final grade along the east portion of the site today.
} ; {Activity date: 10/31/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Notable track out, borderland is cutting grade. Mike will install controls and clean asphalt road way as needed} ; {Activity date: 10/15/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Controls have been installed on the north side of the site.} ; {Activity date: 10/14/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - New controls have been installed at the new areas of construction.} ; {Activity date: 10/09/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Dirt on sidewalks and trackout mainly in parking areas along east side of site. Controls have been installed.} ; {Activity date: 10/02/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Minor track out to be noted throughout site. Controls being installed in the south west corner lot.} ; {Activity date: 09/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Controls are needed at north central catch basin and driveway. Unstabilized dirt Is being diverted into catch basin and onto Rodeway.} ; {Activity date: 09/05/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is minor track out on the roads within the site. There is dirt accumulation in low-lying areas of the parking lot, Center East.} ; {Activity date: 08/22/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time. Minor trackout of dirt into parking areas
Controls have been installed around new pavement.
} ; {Activity date: 07/23/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is much trackout to be noted Especially on the east side of the site. Additionally there is quite a bit of dirt and rocks that have washed in to the streets from the vacant lots. The streets need to be cleaned and protection needs to be placed at these locations
} ; {Activity date: 07/15/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is some dirt road parking lot cleaned up.} ; {Activity date: 07/12/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is track out it needs to be clean from the street where the work is being done this project.} ; {Activity date: 06/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are no issues at this time} ; {Activity date: 05/15/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Trash out noted along the west side of the site.} ; {Activity date: 05/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by VFLORES1 - There is notable check out that needs to be cleaned along the individual building sites on the west portion of this development package.} ; {Activity date: 05/01/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Track out present along new construction on the west side of the side and at northwest corner of site.} ; {Activity date: 04/09/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are no issues or concerns at this time. Oversize waddle with rocks has been installed along the north perimeter curb openings.} ; {Activity date: 02/27/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There is some track out present at the southeast portion of the site and much track out at the opposite north west end of the site.} ; {Activity date: 02/19/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There is a fair amount of muddy track out to be noted on ca Santacruz.} ; {Activity date: 02/15/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There is much traffic out to be noted along the western, Northwestern, and south eastern edges of the site launch CA Santacruz. Track out protection is needed in at least two of these locations.} ; {Activity date: 01/31/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Inspector has no issues at this time.} ; {Activity date: 01/18/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Minor track out noted along the southwest and Southeast portions of the site. Waddle is in place to protect drainage openings. There are no issues at this time} ; {Activity date: 01/10/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE CONTRACTORS CONTINUE TO WORK ON CONSTRUCTION OF THE SOUTHWESTERN PADS AND GRADES EAST OF THE RIVER, AND ARE POURING THE CURBS IN THE SOUTHEASTERN AREA OF THIS SITE NORTH OF IRVINGTON.
THERE ARE NO STORM WATER CONCERNS AT THIS TIME.} ; {Activity date: 01/15/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Track out noted unkai a Santa Cruz} ; {Activity date: 01/10/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5
07/13/2022 SITE - Stormwater Setup and Controls N/A Complete (Recurring) {Activity date: 07/13/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN/118 OF 18” Pipe .} ; {Activity date: 01/15/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS CONTINUED} ; {Activity date: 01/14/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 07/16/2020; Status: Denied; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Many controls have been pushed around need to be reset. Protect catch basins as needed.

} ; {Activity date: 06/25/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Mike with Borderland at 405-5613. Please check and make any corrections to stormwater protections as needed with the monsoon approaching. Catch basin at Southeast location next to building pad needs protection. Thanks

} ; {Activity date: 08/23/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/27/2022 ENGR Engineering Final N/A Not Ready
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready
10/26/2022 SITE - Stormwater Final Inspection N/A Not Ready
05/09/2024 City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection N/A Re-inspection required I looked at this site and saw that the two parking spaces have not been striped as shown in the proved revised drawings. This will need to be done in the future before this Permit can be approved. I contacted Rob East with Bourn Partners and advised him of the complaint that has been registered by Pima County Wastewater. He will work on getting the striping of the parking lot done and will let me know when it is complete so that we can relook at the site.

Completed Inspections

Permit Status: Issued
Permit Number: DP16-0044
Permit Description: Revision 18: update to lots 48, 49, started 04.01.2026 ** Revision 17 - TENTATIVE PLAT - Irvington & I-19 Commercial Center, Lots 1-47 plus Block "A" (private streets and u
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/12/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/12/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/27/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 07/27/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/27/2018 COT - ENGR - Signage Final Passed {Activity date: 07/27/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }