Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 07/13/2022 |
SITE - Stormwater Setup and Controls |
MHERNANDEZ |
Continued |
Entered by VVERA1 - CN/118 OF 18” Pipe . |
| 01/15/2021 |
SITE - Stormwater Setup and Controls |
DROBERTS |
Continued |
Entered by RSALDAT1 - IS CONTINUED |
| 01/14/2021 |
SITE - Stormwater Setup and Controls |
IVR USER |
Cancelled |
Entered by IVR USER - IVRS - AP canceled |
| 07/16/2020 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Denied |
Entered by JSCHNEI2 - Many controls have been pushed around need to be reset. Protect catch basins as needed.
|
| 06/25/2020 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Mike with Borderland at 405-5613. Please check and make any corrections to stormwater protections as needed with the monsoon approaching. Catch basin at Southeast location next to building pad needs protection. Thanks
|
| 08/23/2018 |
SITE - Stormwater Setup and Controls |
DROBERTS |
Approved |
Entered by DROBERT5 - |