Permit: DP16-0003
Permit Details
Apply Date:
01/06/2016
Applicant:
Description:
GRADING ONLY
Permit Reviews
Permit Number - DP16-0003
Permit Status: Complete
Permit Description: GRADING ONLY
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/06/2016 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 01/06/2016 | COMPLETED |
01/15/2016 | GRADING | 02/12/2016 | COMPLETED |
02/17/2016 | RESUB - SITE and/or GRADING | 02/17/2016 | COMPLETED |
02/17/2016 | RESUB - SITE and/or GRADING | 06/23/2016 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP16-0003
Permit Description: GRADING ONLY
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/19/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 07/19/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) POSTA A COPY OF YOUR NOI ON SITE. 2) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP 3) INSTALL A STABILIZED ENTRANCE 4) INSTALL A CONCRETE WASH OUT 5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP 6) SWEEP UP TRACKED SOIL AS NEEDED 7) ENSURE COMPLIANCE W/YOUR NPPO REQ, PRIOR TO GRUBBING 8) CALL FOR FOLLOW UP INSPECTION WHEN CONTROLS ARE INSTALLED 9) CALL FOR INSPECTION FOR ANY UNDERGROUND SITE WORK RICK 310-5812/ CLINT 603-9889} |
|
02/19/2021 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 02/19/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE SITE IS BEING PLACED IN FINAL STATUS AT THIS TIME. THE FINAL INSPECTION FOR THE SITE HAS NOT BEEN SCHEDULED BY THE DEVELOPER BUT HAS BEEN VERIFIED BY RON LE DONNE.} | |
02/19/2021 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 02/19/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE SITE IS BEING PLACED IN FINAL STATUS AT THIS TIME. THE FINAL INSPECTION FOR THE SITE HAS NOT BEEN SCHEDULED BY THE DEVELOPER BUT HAS BEEN VERIFIED BY RON LE DONNE.} ; {Activity date: 07/24/2017; Status: Not Applicable; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO NPPO PLAN} | |
02/19/2021 | ENGR Engineering Final | Passed | {Activity date: 02/19/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VLEON1 - PARTIAL AT THIS TIME. THIS INSPECTION WILL BE RECHECKED NEXT WEEK TO SEE WHAT IS REQUIRED FOR THE FINAL INSPECTION.} ; {Activity date: 02/19/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE SITE IS BEING PLACED IN FINAL STATUS AT THIS TIME. THE FINAL INSPECTION FOR THE SITE HAS NOT BEEN SCHEDULED BY THE DEVELOPER BUT HAS BEEN VERIFIED BY RON LE DONNE.} ; {Activity date: 06/18/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - PARTIAL AT THIS TIME, FINAL TO BE GIVEN AFTER VERIFICATION OF ALL CLOSE OUT DOCUMENTATION.} ; {Activity date: 05/15/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - PARTIAL AT THIS TIME. DAMAGED SIDEWALK HAS BEEN NOTED AT VARIOS LOCATIONS THROUGHOUT THIS SITE. REPAIR ANY SIDEWALK THAT HAS BEEN DAMAGED OR CRACKED PRIOR TO REQUESTING THIS FINAL INSPECTION. PROVIDE ALL CLOSEOUT DOCUMENTATION FOR THIS SITE WHICH WILL INCLUDE APPROVED REVISED DRAWINGS FOR ALL CHANGES MADE TO THIS SITE, AND A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD. } ; {Activity date: 05/31/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Not ready for final grading complete all work that needs to be done on approved plans.} ; {Activity date: 11/20/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE IS NOT COMPLETE AT THIS TIME BUT IT WILL BE CHECKED TODAY AND TOMORROW TO SEE WHAT WORK HAS BEEN COMPLETED. THIS WILL BE UTILIZED TO COMPARE THE ENGINEERS ESTIMATE FOR THE REMAINING ASSURABLE ITEMS WHEN IT IS SUBMITTED.} ; {Activity date: 07/12/2018; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE IS NOT READY AT THIS TIME FOR THE FINAL INSPECTION. I WILL BE CONTACTING THE DEVELOPER AND SEE WHAT IS THE INTENT OF THIS INSPECTION REQUEST.} ; {Activity date: 08/10/2017; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH JEFF IN THE OFFICE TO DISCUSS WHAT THEIR NEEDS ARE FOR THE MOUNTAIN VAIL SUBDIVISION PART "G". CURRENTLY THIS PROJECT IS JUST BEGINNING AT THIS TIME, THIS IS PHASE 2 OF PART "G", LOTS 15 - 48 AND 83 - 89. THIS WORK WILL BE SCHEDULE ON A REGULAR BASIS TO ENSURE THAT THE CURRENT INSPECTIONS ARE DONE WHEN THEY ARE NEEDED.} |
|
02/19/2021 | SITE - Stormwater Follow-up | Passed | {Activity date: 02/19/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUE NO ISSUES AT THIS TIME} ; {Activity date: 02/19/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE SITE IS BEING PLACED IN FINAL STATUS AT THIS TIME. THE FINAL INSPECTION FOR THE SITE HAS NOT BEEN SCHEDULED BY THE DEVELOPER BUT HAS BEEN VERIFIED BY RON LE DONNE.} | |
02/19/2021 | ENGR Grading Final | Passed | {Activity date: 02/19/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE SITE IS BEING PLACED IN FINAL STATUS AT THIS TIME. THE FINAL INSPECTION FOR THE SITE HAS NOT BEEN SCHEDULED BY THE DEVELOPER BUT HAS BEEN VERIFIED BY RON LE DONNE.} | |
02/19/2021 | SITE - Stormwater Final Inspection | Passed | {Activity date: 02/19/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE SITE IS BEING PLACED IN FINAL STATUS AT THIS TIME. THE FINAL INSPECTION FOR THE SITE HAS NOT BEEN SCHEDULED BY THE DEVELOPER BUT HAS BEEN VERIFIED BY RON LE DONNE.} ; {Activity date: 05/15/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - PARTIAL AT THIS TIME. PROVIDE THE CITY WITH A COPY OF THE NOTICE OF TERMINATION FROM ADEQ FOR THIS SITE. ALSO PROVIDE A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD.} | |
02/19/2021 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 02/19/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE SITE IS BEING PLACED IN FINAL STATUS AT THIS TIME. THE FINAL INSPECTION FOR THE SITE HAS NOT BEEN SCHEDULED BY THE DEVELOPER BUT HAS BEEN VERIFIED BY RON LE DONNE.} ; {Activity date: 07/24/2017; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) A STABILIZED ENTRANCE HAS BEEN INSTALLED. 2) INSTALL PERIMETR SEDIMENT CONTROLS, CALL FOR RE-INSPECTION 3) SITE HAS BEEN GRUBBED, NO NPPO I CAN SEE. 4) SITE IS CURRENTLY IN NON-COMPLIANCE WITH THIER SWPPP} |
|
02/19/2021 | COT - ENGR - Signage Final | Passed | {Activity date: 02/19/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE SITE IS BEING PLACED IN FINAL STATUS AT THIS TIME. THE FINAL INSPECTION FOR THE SITE HAS NOT BEEN SCHEDULED BY THE DEVELOPER BUT HAS BEEN VERIFIED BY RON LE DONNE.} |