Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP16-0003

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
02/19/2021 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 - THE SITE IS BEING PLACED IN FINAL STATUS AT THIS TIME. THE FINAL INSPECTION FOR THE SITE HAS NOT BEEN SCHEDULED BY THE DEVELOPER BUT HAS BEEN VERIFIED BY RON LE DONNE.
03/23/2020 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by SFLORES2 - Not ready Complete all work on development package before calling for final.
02/19/2021 ENGR Engineering Final DROBERTS Partial Approval Entered by VLEON1 - PARTIAL AT THIS TIME. THIS INSPECTION WILL BE RECHECKED NEXT WEEK TO SEE WHAT IS REQUIRED FOR THE FINAL INSPECTION.
02/19/2021 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 - THE SITE IS BEING PLACED IN FINAL STATUS AT THIS TIME. THE FINAL INSPECTION FOR THE SITE HAS NOT BEEN SCHEDULED BY THE DEVELOPER BUT HAS BEEN VERIFIED BY RON LE DONNE.
06/18/2020 ENGR Engineering Final DROBERTS Partial Approval Entered by RSALDAT1 - PARTIAL AT THIS TIME, FINAL TO BE GIVEN AFTER VERIFICATION OF ALL CLOSE OUT DOCUMENTATION.
05/15/2020 ENGR Engineering Final DROBERTS Partial Approval Entered by RSALDAT1 - PARTIAL AT THIS TIME. DAMAGED SIDEWALK HAS BEEN NOTED AT VARIOS LOCATIONS THROUGHOUT THIS SITE. REPAIR ANY SIDEWALK THAT HAS BEEN DAMAGED OR CRACKED PRIOR TO REQUESTING THIS FINAL INSPECTION. PROVIDE ALL CLOSEOUT DOCUMENTATION FOR THIS SITE WHICH WILL INCLUDE APPROVED REVISED DRAWINGS FOR ALL CHANGES MADE TO THIS SITE, AND A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD.
05/31/2019 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Not ready for final grading complete all work that needs to be done on approved plans.
11/20/2018 ENGR Engineering Final DROBERTS Partial Approval Entered by DROBERT5 - THIS SITE IS NOT COMPLETE AT THIS TIME BUT IT WILL BE CHECKED TODAY AND TOMORROW TO SEE WHAT WORK HAS BEEN COMPLETED. THIS WILL BE UTILIZED TO COMPARE THE ENGINEERS ESTIMATE FOR THE REMAINING ASSURABLE ITEMS WHEN IT IS SUBMITTED.
07/12/2018 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by DROBERT5 - THIS SITE IS NOT READY AT THIS TIME FOR THE FINAL INSPECTION. I WILL BE CONTACTING THE DEVELOPER AND SEE WHAT IS THE INTENT OF THIS INSPECTION REQUEST.
08/10/2017 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by DROBERT5 - MET WITH JEFF IN THE OFFICE TO DISCUSS WHAT THEIR NEEDS ARE FOR THE MOUNTAIN VAIL SUBDIVISION PART "G". CURRENTLY THIS PROJECT IS JUST BEGINNING AT THIS TIME, THIS IS PHASE 2 OF PART "G", LOTS 15 - 48 AND 83 - 89. THIS WORK WILL BE SCHEDULE ON A REGULAR BASIS TO ENSURE THAT THE CURRENT INSPECTIONS ARE DONE WHEN THEY ARE NEEDED.