Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 07/19/2017 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) POSTA A COPY OF YOUR NOI ON SITE.
2) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
3) INSTALL A STABILIZED ENTRANCE
4) INSTALL A CONCRETE WASH OUT
5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP
6) SWEEP UP TRACKED SOIL AS NEEDED
7) ENSURE COMPLIANCE W/YOUR NPPO REQ, PRIOR TO GRUBBING
8) CALL FOR FOLLOW UP INSPECTION WHEN CONTROLS ARE INSTALLED
9) CALL FOR INSPECTION FOR ANY UNDERGROUND SITE WORK
RICK 310-5812/ CLINT 603-9889 |