Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
07/19/2017 PDSD Engineering Division Pre-Construction SITE MRUSSO Approved Entered by DROBERT5 - 1) POSTA A COPY OF YOUR NOI ON SITE. 2) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP 3) INSTALL A STABILIZED ENTRANCE 4) INSTALL A CONCRETE WASH OUT 5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP 6) SWEEP UP TRACKED SOIL AS NEEDED 7) ENSURE COMPLIANCE W/YOUR NPPO REQ, PRIOR TO GRUBBING 8) CALL FOR FOLLOW UP INSPECTION WHEN CONTROLS ARE INSTALLED 9) CALL FOR INSPECTION FOR ANY UNDERGROUND SITE WORK RICK 310-5812/ CLINT 603-9889