Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Permit Number - DP16-0003

Inspection Description - PDSD Engineering Division Pre-Construction SITE

Inspection Status - Passed

Date Description Inspector Results Comments
07/19/2017 PDSD Engineering Division Pre-Construction SITE MRUSSO Approved Entered by DROBERT5 - 1) POSTA A COPY OF YOUR NOI ON SITE. 2) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP 3) INSTALL A STABILIZED ENTRANCE 4) INSTALL A CONCRETE WASH OUT 5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP 6) SWEEP UP TRACKED SOIL AS NEEDED 7) ENSURE COMPLIANCE W/YOUR NPPO REQ, PRIOR TO GRUBBING 8) CALL FOR FOLLOW UP INSPECTION WHEN CONTROLS ARE INSTALLED 9) CALL FOR INSPECTION FOR ANY UNDERGROUND SITE WORK RICK 310-5812/ CLINT 603-9889