Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: PDSD Site/Engineering Division - NPPO

Permit Number - DP16-0003

Inspection Description - PDSD Site/Engineering Division - NPPO

Inspection Status - Passed

Date Description Inspector Results Comments
02/19/2021 PDSD Site/Engineering Division - NPPO DROBERTS Approved Entered by DROBERT5 - THE SITE IS BEING PLACED IN FINAL STATUS AT THIS TIME. THE FINAL INSPECTION FOR THE SITE HAS NOT BEEN SCHEDULED BY THE DEVELOPER BUT HAS BEEN VERIFIED BY RON LE DONNE.
07/24/2017 PDSD Site/Engineering Division - NPPO MRUSSO Not Applicable Entered by DROBERT5 - NO NPPO PLAN