Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
11/19/2015
Applicant:
Michael John Baker
Description:
SITE/GRADINGOriginally approved 2/12/2016 (17 pages)1st revision approved on 12/1/2016 (pages

Permit Reviews

Permit Number - DP15-0204
Permit Status: Complete
Permit Description: SITE/GRADINGOriginally approved 2/12/2016 (17 pages)1st revision approved on 12/1/2016 (pages
Start Date Submittal Complete Date Status  
01/14/2016 DEV PKG - RESUBMITTAL 02/10/2016 COMPLETED Review Details
02/10/2016 DEV PKG - RESUBMITTAL 02/17/2016 COMPLETED Review Details
09/28/2016 REVISION - - 1ST 12/01/2016 ACTIVE Review Details
11/19/2015 DEV PKG - OK TO SUBMIT 11/19/2015 COMPLETED Review Details
11/20/2015 DEV PKG 12/30/2015 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0204
Permit Description: SITE/GRADINGOriginally approved 2/12/2016 (17 pages)1st revision approved on 12/1/2016 (pages
Total Completed Inspections - 11
Date Description Inspector Results Comments
02/26/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/26/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) ENSURE YOU IMPLEMENT YOUR SWPPP PRIOR TO GRUBBING AND GRADING, AND CALL FOR INSPECTION FOR APPROVAL
2) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP
3) POST A SIGN COPY OF YOUR NOI ON SITE
4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE
5) SWEEP UP TRACKED SOIL AS NEEDED
6) INSTALL A CONCRETE WASH OUT WHEN APPLICABLE}
03/16/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 03/16/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER SWPPP
2) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION
3) PERFORM SELF INSPECTION PER YOUR SWPPP} ; {Activity date: 03/11/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED,
2) NO ACCESS TO THE SITE
3) NO INSPECTION CALLED IN}
12/01/2016 COT - ENGR - Signage Final Passed {Activity date: 12/01/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/20/2017 SITE - Zoning Final Passed {Activity date: 01/26/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/20/2017; Status: Approved; Inspector: pg; Comment: Entered by PGEHLEN1 - } ; {Activity date: 12/01/2016; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/21/2017 RSBU - Building Final Passed {Activity date: 04/21/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/21/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 01/26/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/21/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/02/2016; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - VERIFICATION OF ALL THE PLANTS WILL BE CHECKED PRIOR TO THIS BEING APPROVED FOR THE FINAL.}
04/21/2017 SITE - Stormwater Follow-up Passed {Activity date: 01/26/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/21/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/01/2016; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, I HAVE REMINDED THE DEVELOPER THAT THEY NEED TO SWEEP THEIR STREETS AND THE ADJACENT PRIVATE STREETS OF ALL SEDIMENT AND MINOR TRACKOUT.} ; {Activity date: 11/21/2016; Status: Denied; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) NO CONTACT ON SITE, CALLED SUPERINTENDENT FORM NUMBER POSTED ON TRAILER DOOR, LEFT MESSAGE
2) PROVIDE VERIFICATION OF STORM WATER SELF INSPECTIONS REQUIRED BY YOUR SWPPP.
3) STORM WATER DRAINAGE STRUCTURES AND PIPING HAVE BEEN INSTALLED BELOW GRADE WITH NO INSPECTIONS.
4) PROVIDE AN APPROVED GRADING PLAN THAT SHOWS ALL SITE/GRADING CHANGES MADE.
5) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD
6) NO LANDSCAPE INSPECTIONS CALLED IN.} ; {Activity date: 11/14/2016; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MIMOR TRACKOUT NOTED FROM DREXEL ROAD INTO THE SITE, THIS WILL NEED TO BE SWEPT UP PRIOR TO SEEKING A TEMPORARY C OF O FOR STOCKING PURPOSES.} ; {Activity date: 11/10/2016; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO CONTACT, NO RESPONSE TO PREVIOUS INSPECTIONS} ; {Activity date: 11/02/2016; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) CONTRACTOR IN NON-COMPLIANCE WITH THIER STORM WATER PERMIT
2) NO STORM WATER SELF INSPECTIONS PERFORMED
3) SEDIMENT CONTROLS HAVE NOT BEEN MAINTAINED
4) SITE NOT PAVED
5) NEED ENG OF RECORD APPROVAL AND REVISED PLANS FOR CHANGES MADE TO THE SITE
6) NEED CERT STATEMENT FROM ENG OF RECORD PRIOR TO FINAL
} ; {Activity date: 10/27/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, IT IS DRY AND THERE APPEARS TO BE LITTLE IF NO TRACKOUT FROM THIS SITE ONTO THE PRIVATE STREETS.} ; {Activity date: 05/10/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 04/22/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 03/16/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER SWPPP
2) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION
3) PERFORM SELF INSPECTION PER YOUR SWPPP}
04/21/2017 ENGR Grading Final Passed {Activity date: 04/21/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/01/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 11/14/2016; Status: Closed; Inspector: DROBERTS; Comment: Entered by DROBERT5 - DROVE THROUGH THE SITE TOO SEE WHERE THEY ARE AT WITH THE CONSTRUCTION WORK. THEY ARE CURRENTLY CUTTING THE FINAL SUBGRADE FOR THE PARKING LOT AND THE ROADWAYS. THEY ARE ALSO PLACING ABC IN AREAS OF THE ROADWAY ON THE EAST SIDE OF THE SITE AND IN THE AREA OF THE ENTRANCE OFF OF DREXEL ROAD. THE SUPERVISOR COULD NOT GIVE ME A TIME FRAME ON WHEN THEY WOULD BE COMPLETE WITH THE ABC AND READY FOR THE PAVEMENT. MIKE RUSSO WILL CHECK ON THE SITE LATER THIS WEEK TO ENSURE THAT THE WORK NEEDED FOR THE C OF O ISCOMPLETED PRIOR TO THE END OF THIS MONTH.} ; {Activity date: 11/02/2016; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) CONTRACTOR IN NON-COMPLIANCE WITH THIERSTORM WATER PERMIT
2) NO STORM WATER SELF INSPECTIONS PERFORMED
3) SEDIMENT CONTROLS HAVE NOT BEEN MAINTAINED
4) SITE NOT PAVED
5) NEED ENG OF RECORD APPROVAL AND REVISED PLANS FOR CHANGES MADE TO THE SITE
6) NEED CERT STATEMENT FROM ENG OF RECORD PRIOR TO FINAL}
04/21/2017 SITE - Stormwater Final Inspection Passed {Activity date: 01/26/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/21/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/01/2016; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE ISNOT READY FOR THE FINAL INSPECTION AT THIS TIME. SEE THE COMMENTS IN THE FOLLOW-UP INSPECTION FOR ALL CONCERNS.}
04/06/2022 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 04/06/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/26/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/01/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 11/21/2016; Status: Denied; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) NO CONTACT ON SITE, CALLED SUPERINTENDENT FORM NUMBER POSTED ON TRAILER DOOR, LEFT MESSAGE
2) PROVIDE VERIFICATION OF STORM WATER SELF INSPECTIONS REQUIRED BY YOUR SWPPP.
3) STORM WATER DRAINAGE STRUCTURES AND PIPING HAVE BEEN INSTALLED BELOW GRADE WITH NO INSPECTIONS.
4) PROVIDE AN APPROVED GRADING PLAN THAT SHOWS ALL SITE/GRADING CHANGES MADE.
5) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD
6) NO LANDSCAPE INSPECTIONS CALLED IN.}
04/06/2022 ENGR Engineering Final Passed {Activity date: 04/06/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/02/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL OF THE REMAINING INSPECTIONS FOR THIS SITE AND ALL REQUIREMENTS.} ; {Activity date: 04/21/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/01/2016; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 11/21/2016; Status: Denied; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) NO CONTACT ON SITE, CALLED SUPERINTENDENT FORM NUMBER POSTED ON TRAILER DOOR, LEFT MESSAGE
2) PROVIDE VERIFICATION OF STORM WATER SELF INSPECTIONS REQUIRED BY YOUR SWPPP.
3) STORM WATER DRAINAGE STRUCTURES AND PIPING HAVE BEEN INSTALLED BELOW GRADE WITH NO INSPECTIONS.
4) PROVIDE AN APPROVED GRADING PLAN THAT SHOWS ALL SITE/GRADING CHANGES MADE.
5) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD
6) NO LANDSCAPE INSPECTIONS CALLED IN.} ; {Activity date: 11/15/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CONTACTED LANE SUTTON TODAY AND DISCUSSED THE PLACEMENT OF THE ASPHALT PAVEMENT FOR THIS SITE. THEY ARE SCHEDULED TO PAVE NEXT WEEK IF POSSIBLE ON MONDAY AND TUESDAY. I ASKED FOR LANE TO MAKE SURE THAT THE INSPECTION REQUEST CONTINUED TO BE SET UP FOR EVERY WEEK THROUGH THE FIRST WEEK OF DECEMBER.} ; {Activity date: 11/02/2016; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) CONTRACTOR IN NON-COMPLIANCE WITH THIERSTORM WATER PERMIT
2) NO STORM WATER SELF INSPECTIONS PERFORMED
3) SEDIMENT CONTROLS HAVE NOT BEEN MAINTAINED
4) SITE NOT PAVED
5) NEED ENG OF RECORD APPROVAL AND REVISED PLANS FOR CHANGES MADE TO THE SITE
6) NEED CERT STATEMENT FROM ENG OF RECORD PRIOR TO FINAL
}

Documents

File Name Document Type  
001_SITE / GRADING / SWPPP / COVER SHEET_1 OF 17.TIF DEVELOPMENT PACKAGE VIEW
002_SITE_2 OF 17.TIF DEVELOPMENT PACKAGE VIEW
003_IMPROVEMENT / HYDROLOGY / UTILITY SHEET_3 OF 17.TIF DEVELOPMENT PACKAGE VIEW
004_PRIVATE PAVING / GRADING_4 OF 17.TIF DEVELOPMENT PACKAGE VIEW
005_PRIVATE PAVING / GRADING_5 OF 17.TIF DEVELOPMENT PACKAGE VIEW
006_PRIVATE PAVING / GRADING / OFFSITE DRIVE_6 OF 17.TIF DEVELOPMENT PACKAGE VIEW
007_PRIVATE PAVING / GRADING / DRAINAGE DETAILS_7 OF 17.TIF DEVELOPMENT PACKAGE VIEW
008_SWPPP MAP_8 OF 17.TIF DEVELOPMENT PACKAGE VIEW
009_LANDSCAPE_9 OF 17.TIF DEVELOPMENT PACKAGE VIEW
010_LANDSCAPE_10 OF 17.TIF DEVELOPMENT PACKAGE VIEW
011_LANDSCAPE DETAILS_11 OF 17.TIF DEVELOPMENT PACKAGE VIEW
012_IRRIGATION_12 OF 17.TIF DEVELOPMENT PACKAGE VIEW
013_IRRIGATION_13 OF 17.TIF DEVELOPMENT PACKAGE VIEW
014_IRRIGATION DETAILS_14 OF 17.TIF DEVELOPMENT PACKAGE VIEW
015_IRRIGATION NOTES / EMITTER SCHEDULE_15 OF 17.TIF DEVELOPMENT PACKAGE VIEW
016_WATER HARVESTING_16 OF 17.TIF DEVELOPMENT PACKAGE VIEW
017_VIEWSHED ANALYSIS_17 OF 17.TIF DEVELOPMENT PACKAGE VIEW
PAG CALC.PDF DOCUMENTS VIEW
PAG COMMENTS.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
DP15-0204 RWRD ACCEPTANCE LETTER..PDF DOCUMENTS VIEW
None DOCUMENTS VIEW