Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP15-0204
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/26/2016 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by MRUSSO1 - 1) ENSURE YOU IMPLEMENT YOUR SWPPP PRIOR TO GRUBBING AND GRADING, AND CALL FOR INSPECTION FOR APPROVAL 2) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP 3) POST A SIGN COPY OF YOUR NOI ON SITE 4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE 5) SWEEP UP TRACKED SOIL AS NEEDED 6) INSTALL A CONCRETE WASH OUT WHEN APPLICABLE |