04/06/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
07/02/2017 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by DROBERT5 - COMPLETE ALL OF THE REMAINING INSPECTIONS FOR THIS SITE AND ALL REQUIREMENTS. |
04/21/2017 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
12/01/2016 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by DROBERT5 - |
11/21/2016 | ENGR Engineering Final | MRUSSO | Denied | Entered by MRUSSO1 - 1) NO CONTACT ON SITE, CALLED SUPERINTENDENT FORM NUMBER POSTED ON TRAILER DOOR, LEFT MESSAGE 2) PROVIDE VERIFICATION OF STORM WATER SELF INSPECTIONS REQUIRED BY YOUR SWPPP. 3) STORM WATER DRAINAGE STRUCTURES AND PIPING HAVE BEEN INSTALLED BELOW GRADE WITH NO INSPECTIONS. 4) PROVIDE AN APPROVED GRADING PLAN THAT SHOWS ALL SITE/GRADING CHANGES MADE. 5) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD 6) NO LANDSCAPE INSPECTIONS CALLED IN. |
11/15/2016 | ENGR Engineering Final | DROBERTS | Continued | Entered by DROBERT5 - CONTACTED LANE SUTTON TODAY AND DISCUSSED THE PLACEMENT OF THE ASPHALT PAVEMENT FOR THIS SITE. THEY ARE SCHEDULED TO PAVE NEXT WEEK IF POSSIBLE ON MONDAY AND TUESDAY. I ASKED FOR LANE TO MAKE SURE THAT THE INSPECTION REQUEST CONTINUED TO BE SET UP FOR EVERY WEEK THROUGH THE FIRST WEEK OF DECEMBER. |
11/02/2016 | ENGR Engineering Final | MRUSSO | Correction Required | Entered by MRUSSO1 - 1) CONTRACTOR IN NON-COMPLIANCE WITH THIERSTORM WATER PERMIT 2) NO STORM WATER SELF INSPECTIONS PERFORMED 3) SEDIMENT CONTROLS HAVE NOT BEEN MAINTAINED 4) SITE NOT PAVED 5) NEED ENG OF RECORD APPROVAL AND REVISED PLANS FOR CHANGES MADE TO THE SITE 6) NEED CERT STATEMENT FROM ENG OF RECORD PRIOR TO FINAL |
12/01/2016 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
11/21/2016 | ENGR Engineering Final | MRUSSO | Denied | Entered by MRUSSO1 - 1) NO CONTACT ON SITE, CALLED SUPERINTENDENT FORM NUMBER POSTED ON TRAILER DOOR, LEFT MESSAGE 2) PROVIDE VERIFICATION OF STORM WATER SELF INSPECTIONS REQUIRED BY YOUR SWPPP. 3) STORM WATER DRAINAGE STRUCTURES AND PIPING HAVE BEEN INSTALLED BELOW GRADE WITH NO INSPECTIONS. 4) PROVIDE AN APPROVED GRADING PLAN THAT SHOWS ALL SITE/GRADING CHANGES MADE. 5) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD 6) NO LANDSCAPE INSPECTIONS CALLED IN. |
11/02/2016 | ENGR Engineering Final | MRUSSO | Correction Required | Entered by MRUSSO1 - 1) CONTRACTOR IN NON-COMPLIANCE WITH THIERSTORM WATER PERMIT 2) NO STORM WATER SELF INSPECTIONS PERFORMED 3) SEDIMENT CONTROLS HAVE NOT BEEN MAINTAINED 4) SITE NOT PAVED 5) NEED ENG OF RECORD APPROVAL AND REVISED PLANS FOR CHANGES MADE TO THE SITE 6) NEED CERT STATEMENT FROM ENG OF RECORD PRIOR TO FINAL |