Permit Details

Status:
Complete
Type:
Development Package
Address:
235 S CHURCH AV
Apply Date:
11/10/2015
Applicant:
Description:
SAINT AUGUSTINE CATHEDRAL ROMAN

Permit Reviews

Permit Number - DP15-0198
Permit Status: Complete
Permit Description: SAINT AUGUSTINE CATHEDRAL ROMAN
Start Date Submittal Complete Date Status  
02/10/2017 DEV PKG - RESUBMITTAL 02/15/2017 ACTIVE Review Details
02/18/2016 DEV PKG - RESUBMITTAL 12/19/2016 COMPLETED Review Details
03/27/2017 DEV PKG - REVISION 04/19/2017 COMPLETED Review Details
04/19/2017 DEV PKG - REVISION 04/21/2017 COMPLETED Review Details
11/10/2015 DEV PKG - OK TO SUBMIT 11/10/2015 COMPLETED Review Details
11/13/2015 DEV PKG 12/30/2015 COMPLETED Review Details
12/19/2016 DEV PKG - RESUBMITTAL 02/10/2017 COMPLETED Review Details
12/30/2015 DEV PKG - RESUBMITTAL 02/18/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0198
Permit Description: SAINT AUGUSTINE CATHEDRAL ROMAN
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/27/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/27/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ON SITE WENT OVER CLEAN UP OF TRACK OUT AND PROVIDEING TRACK OUT ROCK AT GATE.}
10/17/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 10/17/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/18/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 10/18/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/18/2018 COT - ENGR - Signage Final Passed {Activity date: 10/18/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
11/19/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 11/19/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/30/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Make sure all areas that are required to be recessed are done so according to the plan.}
11/19/2018 ENGR Engineering Final Passed {Activity date: 11/19/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 11/09/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - missing handrail shown on Page Six, missing plants and trees and staking, need to check rating around bubblers, need to check slopes in parking lot after construction materials have been removed, need to check slopes around bubblers and catch basins. Inspector has no issues preventing a TCO} ; {Activity date: 10/29/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - I was unable to locate the superintendent with tofel construction there was no contact information provided. Please provide a phone number when scheduling inspections. Installation of sidewalks Fore Street access, handrails, Landscaping Etc in progress. There are materials blocking the west parking stalls. Not ready for final inspection.} ; {Activity date: 10/18/2018; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WIH DAVID/TOFEL CONSTRUCTION ON THE SITE TO SEE WHERE THEY ARE WITH THE SITE WORK. THEY ARE CONTINUEING TO WORK ON THE CONSTRUCTION OF THE SIDEWALKS AND RAMPS ON THE SOUTHSIDE OF THE SITE AND LANDSCAPING THROUGHOUT THE SITE. HE WILL RESCHEDULE THIS INSPECTION FOR NEXT WEEK SO THAT HE CAN SEE WHAT IS NEEDED PRIOR TO OBTAINING A TEMPORARY CERTIFICATE OF OCCUPANCY FOR THE BUILDING.
DUE TO THE EXTENSIVE AMOUT OF WORK STILL NEEDED ON THIS SITE A PUNCHLIST OF ITEMS WILL NOT BE PERFORMED TILL THE MIDDLE OF NEXT WEEK.} ; {Activity date: 10/17/2018; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE IS NOT READY AT THIS TIME FOR THE FINAL INSPECTION, I WILL TRY TO LOOK AT THE SITE ON 10/18/18 AND DETERMINE WHAT TYPE OF WORK IS STILL NEEDED PRIOR TO SCHEDULING THE FINAL INSPECTION.} ; {Activity date: 10/01/2018; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CONTACTED DAVID WITH TOFEL AND DISCUSSED WHAT HE IS LOOKING FOR WITH TODAYS INSPECTION SINCE THIS SITE IS NOT READY FOR THE FINAL INSPECTIONS AT THIS TIME.
HE WILL BE WANTING TO LOOK OVER THE SITE AND DETERMINE WHAT WILL BE NEEDED BEFORE THEY CAN CLOSE OUT THIS SITE FOR THE FINAL
CERTIFICATE OF OCCUPANCY. I HAVE ADVISED HIM THAT I WILL BE BY THE SITE TOMORROW ON 10/2/18 PENDING CLEAR WEATHER SO THAT
WE CAN LOOK OVER THE SITE AND DISCUSS THEIR CLOSE OUT PLANS. I WILL CONTACT HIM IN THE MORNING WHEN I LEAVE 201 N STONE AV.

}
11/19/2018 SITE - Stormwater Follow-up Passed {Activity date: 11/19/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/01/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MINOR TRACK OUT NOTED AROUND THIS SITE, THE CONTRACTOR IS AWARE OF THE SITUATION AND IS MAKING THE NECESSARY CORRECTIONS.} ; {Activity date: 09/20/2018; Status: Continued; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - some track out present after rain day. Track out protection needed.} ; {Activity date: 08/14/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER TO INSTALL NEW CONTROLS ON NORTH SIDE OF BUILDING.} ; {Activity date: 08/03/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME} ; {Activity date: 07/26/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 06/29/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - WALKED THE SITE WITH THE CONTRACTOR, THERE ARE NO CONCERNS AT THIS TIME.} ; {Activity date: 05/07/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - no concerns at this time.} ; {Activity date: 04/16/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 03/14/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 03/08/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 02/26/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/22/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 01/18/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/08/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT.} ; {Activity date: 01/02/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 12/26/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 12/19/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/11/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/06/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 11/20/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 11/15/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/30/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/23/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/18/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/10/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT REPAIRS TO SWPPP CONTROLS.} ; {Activity date: 09/22/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 09/18/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 09/14/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 09/06/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 08/28/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/24/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 08/16/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 08/14/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT.} ; {Activity date: 08/08/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 08/01/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.}
11/19/2018 ENGR Grading Final Passed {Activity date: 11/19/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/18/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/07/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON FACADE NO GRADING AT THIS TIME.}
11/19/2018 SITE - Stormwater Final Inspection Passed {Activity date: 11/19/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_COVER SHEET_1 OF 15.TIF DEVELOPMENT PACKAGE VIEW
002_NOTES_2 OF 15.TIF DEVELOPMENT PACKAGE VIEW
003_SITE _3 OF 15.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING / HYDROLOGY_4 OF 15.TIF DEVELOPMENT PACKAGE VIEW
005_UTILITIES / EASEMENTS_5 OF 15.TIF DEVELOPMENT PACKAGE VIEW
006_DETAILS_6 OF 15.TIF DEVELOPMENT PACKAGE VIEW
007_NPPP_7 OF 15.TIF DEVELOPMENT PACKAGE VIEW
008_LANDSCAPE_8 OF 15.TIF DEVELOPMENT PACKAGE VIEW
009_IRRIGATION_9 OF 15.TIF DEVELOPMENT PACKAGE VIEW
010_LANDSCAPE DETAILS_10 OF 15.TIF DEVELOPMENT PACKAGE VIEW
011_IRRIGATION DETAILS_11 OF 15.TIF DEVELOPMENT PACKAGE VIEW
012_SPECIFICATIONS_12 OF 15.TIF DEVELOPMENT PACKAGE VIEW
013_SPECIFICATIONS_13 OF 15.TIF DEVELOPMENT PACKAGE VIEW
014_SPECIFICATIONS_14 OF 15.TIF DEVELOPMENT PACKAGE VIEW
015_ADDRESSING_15 OF 15.TIF DEVELOPMENT PACKAGE VIEW
ADDRESSING COMMENTS.PDF DOCUMENTS VIEW
MARIST COLLEGE - DP15-0198 - EXTENSION REQUEST - 11-08-16.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW