Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP15-0198
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/19/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
10/17/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
11/19/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
10/17/2018 | ENGR Grading Final | DROBERTS | Not ready for Inspection | Entered by DROBERT5 - SITE IS NOT READY AT THIS TIME FOR THE FINAL INSPECTION, I WILL TRY TO LOOK AT THE SITE ON 10/18/18 AND DETERMINE WHAT TYPE OF WORK IS STILL NEEDED PRIOR TO SCHEDULING THE FINAL INSPECTION. |
10/02/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - CURRENT WORK ONGOING AT THIS SITE AT THIS TIME IS THE 1) GRADING FOR THE PARKING LOT AND PLACEMENT OF AB ON FINAL GRADING. THIS SITE WILL HAVE THE PAVEMENT PLACED NEXT WEEK IF THE WEATHER PERMITS. 2) GRADING FOR THE REMAINING SIDEWALKS ON THIS SITE, CURRENTLY POURING SOME OF THE BOARDERING CONCRETE AT THIS TIME. 3) POURING THE CURBS ALONG CHURCH AT THE SOUTHERN ENTRANCE INTO THE SITE. 4) CREWS ARE ALSO WORKING ON THE ACCESS AREAS INTO THE STRUCTURE AND INSIDE THE BUILDING ITSELF. I HAVE ADVISED DAVID WITH TOFEL THAT THEY WILL NEED TO COMPLETE ALL OF THE AREAS SHOWN ON THE DEVELOPMENT PACKAGE PRIOR TO CALLING IN FOR THE FINAL INSPECTIONS. THIS WILL INCLUDE THE FOLLOWING BUT IS NOT LIMITED TO THE FOLLOWING ITEMS: PAVEMENT, AND ASSOCIATED STRIPING, PARKING BLOCK INSTALLATION, SIDEWALKS, LANDSCAPING PLANTS AND D.G. THERE IS WORK THAT IS HAPPENING ALONG OCHOA THAT IS NOT PART OF THIS CONTRACT, TOFEL WILL BE BLOCKING OFF THIS AREA FROM ACCESS PRIOR TO ASKING FOR THEIR TCO. THIS IS NOT TO BE CONSIDERED A FULL LIST OF ITEMS INCOMPLETE AT THIS TIME, THE PUNCHLIST FOR THIS SITE WILL BE LISTED AT A LATED DATE ONCE THE SITE WORK FOR THIS SITE IS IN A MORE COMPLETE STATE. |
10/01/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - THIS SITE WILL BE INSPECTED ON 10/2/2018 TO SEE WHAT NEEDS TO BE COMPLETED PRIOR TO REQUESTING FOR THEIR FINAL INSPECTION FOR THIS SITE. |
07/10/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - ALSO WORKING ON ISTALLING THE DROP INLET STRUCTURES ON THE NORTHSIDE OF THE SITE ALNG THE EASTERN HALF OF THE BUILDING. ONE OTHER STRUCTURE WILL BE INSTALLED LATER THIS WEEK OUT WITHIN THE RIGHTS OF WAY. |
06/29/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - SITE VISIT, INSTALLING THE DRAINAGE PIPES ON THE NORTHSIDE OF THE SITE. |
05/21/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING IN PARKING AREA SOUTH OF BUILDING. |
11/19/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
10/18/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
05/07/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON FACADE NO GRADING AT THIS TIME. |
11/19/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
10/18/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
08/01/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - LOOKED AT THE CATCH BASINS WEST OF THE CHURCH ALL HAVE BEEN APPROVED FOR THE POUR. |
07/10/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - INSTALLING REBAR AND PREPARING TO POUR PART OF THE DRAINAGE STRUCTURE SOUTH OF THE BASEMENT ENTRYWAY ON THE SOUTH SIDE OF THE BUILDING. |
06/14/2018 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by DROBERT5 - THIS SITE HAS BEEN APPROVED FOR THE STEMWALL FORMS ON THE NORTHSIDE OF THE SITE, IT IS OK TO PLACE CONCRETE AT THIS TIME |
06/04/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - LOOKED AT THE WALL FOOTER FOR THE SOUTHSIDE OF THE BUILDING, EVERYTHING IS OK FOR THE FOOTER POUR. |
05/18/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - REBAR FOR MAT AT TRASH ENCLOUSRE OK. |
05/09/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - FOOTER FOR TRASH ENCLOUSER AND WALL OK. |