Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP15-0198

Parcel: 11713157A


Addresses:

235 S CHURCH AV


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP15-0198

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
11/19/2018 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
10/17/2018 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
11/19/2018 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
10/17/2018 ENGR Grading Final DROBERTS Not ready for Inspection Entered by DROBERT5 - SITE IS NOT READY AT THIS TIME FOR THE FINAL INSPECTION, I WILL TRY TO LOOK AT THE SITE ON 10/18/18 AND DETERMINE WHAT TYPE OF WORK IS STILL NEEDED PRIOR TO SCHEDULING THE FINAL INSPECTION.
10/02/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - CURRENT WORK ONGOING AT THIS SITE AT THIS TIME IS THE 1) GRADING FOR THE PARKING LOT AND PLACEMENT OF AB ON FINAL GRADING. THIS SITE WILL HAVE THE PAVEMENT PLACED NEXT WEEK IF THE WEATHER PERMITS. 2) GRADING FOR THE REMAINING SIDEWALKS ON THIS SITE, CURRENTLY POURING SOME OF THE BOARDERING CONCRETE AT THIS TIME. 3) POURING THE CURBS ALONG CHURCH AT THE SOUTHERN ENTRANCE INTO THE SITE. 4) CREWS ARE ALSO WORKING ON THE ACCESS AREAS INTO THE STRUCTURE AND INSIDE THE BUILDING ITSELF. I HAVE ADVISED DAVID WITH TOFEL THAT THEY WILL NEED TO COMPLETE ALL OF THE AREAS SHOWN ON THE DEVELOPMENT PACKAGE PRIOR TO CALLING IN FOR THE FINAL INSPECTIONS. THIS WILL INCLUDE THE FOLLOWING BUT IS NOT LIMITED TO THE FOLLOWING ITEMS: PAVEMENT, AND ASSOCIATED STRIPING, PARKING BLOCK INSTALLATION, SIDEWALKS, LANDSCAPING PLANTS AND D.G. THERE IS WORK THAT IS HAPPENING ALONG OCHOA THAT IS NOT PART OF THIS CONTRACT, TOFEL WILL BE BLOCKING OFF THIS AREA FROM ACCESS PRIOR TO ASKING FOR THEIR TCO. THIS IS NOT TO BE CONSIDERED A FULL LIST OF ITEMS INCOMPLETE AT THIS TIME, THE PUNCHLIST FOR THIS SITE WILL BE LISTED AT A LATED DATE ONCE THE SITE WORK FOR THIS SITE IS IN A MORE COMPLETE STATE.
10/01/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THIS SITE WILL BE INSPECTED ON 10/2/2018 TO SEE WHAT NEEDS TO BE COMPLETED PRIOR TO REQUESTING FOR THEIR FINAL INSPECTION FOR THIS SITE.
07/10/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - ALSO WORKING ON ISTALLING THE DROP INLET STRUCTURES ON THE NORTHSIDE OF THE SITE ALNG THE EASTERN HALF OF THE BUILDING. ONE OTHER STRUCTURE WILL BE INSTALLED LATER THIS WEEK OUT WITHIN THE RIGHTS OF WAY.
06/29/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - SITE VISIT, INSTALLING THE DRAINAGE PIPES ON THE NORTHSIDE OF THE SITE.
05/21/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING IN PARKING AREA SOUTH OF BUILDING.
11/19/2018 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
10/18/2018 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
05/07/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON FACADE NO GRADING AT THIS TIME.
11/19/2018 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
10/18/2018 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
08/01/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - LOOKED AT THE CATCH BASINS WEST OF THE CHURCH ALL HAVE BEEN APPROVED FOR THE POUR.
07/10/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - INSTALLING REBAR AND PREPARING TO POUR PART OF THE DRAINAGE STRUCTURE SOUTH OF THE BASEMENT ENTRYWAY ON THE SOUTH SIDE OF THE BUILDING.
06/14/2018 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - THIS SITE HAS BEEN APPROVED FOR THE STEMWALL FORMS ON THE NORTHSIDE OF THE SITE, IT IS OK TO PLACE CONCRETE AT THIS TIME
06/04/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - LOOKED AT THE WALL FOOTER FOR THE SOUTHSIDE OF THE BUILDING, EVERYTHING IS OK FOR THE FOOTER POUR.
05/18/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - REBAR FOR MAT AT TRASH ENCLOUSRE OK.
05/09/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - FOOTER FOR TRASH ENCLOUSER AND WALL OK.