Permit: DP15-0198

Parcel: 11713157A


Addresses:

235 S CHURCH AV


Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP15-0198

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
11/19/2018 SITE - Stormwater Follow-up DROBERTS Approved Entered by DROBERT5 -
10/01/2018 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - MINOR TRACK OUT NOTED AROUND THIS SITE, THE CONTRACTOR IS AWARE OF THE SITUATION AND IS MAKING THE NECESSARY CORRECTIONS.
09/20/2018 SITE - Stormwater Follow-up bbenedo1 Continued Entered by BBENEDO1 - some track out present after rain day. Track out protection needed.
08/14/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER TO INSTALL NEW CONTROLS ON NORTH SIDE OF BUILDING.
08/03/2018 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME
07/26/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
06/29/2018 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - WALKED THE SITE WITH THE CONTRACTOR, THERE ARE NO CONCERNS AT THIS TIME.
05/07/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - no concerns at this time.
04/16/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
03/14/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
03/08/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
02/26/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
01/22/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
01/18/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
01/08/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO TRACK OUT.
01/02/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
12/26/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
12/19/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
12/11/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
12/06/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
11/20/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
11/15/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
10/30/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
10/23/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
10/18/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
10/10/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ABOUT REPAIRS TO SWPPP CONTROLS.
09/22/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.
09/18/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
09/14/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.
09/06/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.
08/28/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
08/24/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.
08/16/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.
08/14/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO TRACK OUT.
08/08/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
08/01/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.