Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
11/09/2015
Applicant:
Lisa Bowers
Description:
SITE/GRADING/SWPPP - Walmart.

Permit Reviews

Permit Number - DP15-0194
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - Walmart.
Start Date Submittal Complete Date Status  
01/13/2016 DEV PKG - RESUBMITTAL 03/15/2016 COMPLETED Review Details
03/15/2016 DEV PKG - RESUBMITTAL 08/05/2016 COMPLETED Review Details
08/05/2016 DEV PKG - RESUBMITTAL 08/11/2016 COMPLETED Review Details
11/09/2015 DEV PKG - OK TO SUBMIT 11/09/2015 COMPLETED Review Details
11/18/2015 DEV PKG 01/13/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0194
Permit Description: SITE/GRADING/SWPPP - Walmart.
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/11/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/11/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) MET WITH SUPER, DISCUSSED STORM WATER INSTALL.
INSTALL PERIMETER SEDIMENT CONTROLS PER YOUR SWPPP
2) INSTALL AND USE A STBILIZED CONSTRUCTION ENTRANCE/EXIT
3) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP
4) INSTALL AND USE A CONCRETE WASH OUT ON SITE
5) POST A SIGNED COPY OF YOUR NOI AT ENTRANCE TO THE SITE
6) THE SITE WILL CHANGE WITH CONSTRUCTION AND THE SWPPP WILL CHANGE ACCORDINGLY}
08/19/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 08/19/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) WALKED SITE W/ CONTRACTOR, SEDIMENT CONTROLS HAVE BEEN INSTALLED PER PLAN FOR FIRST PHASE (DEMO).
2) CURB INLET FILTERS HAVE BEEN INSTALLED AT ALL CURB-LINE CATCH BASINS.
3) ALL SEDIMENT CONTROL INSTALLATIONS HAVE BEEN DOCUMENTED ON THE SWPPP.
4) ENSURE SEDIMNET CONTROLS ARE INSTALLED ACROSS THE EXISTING SWALE OR AT FENCE LINE PRIOR TO SWALE IN SOUTH PARKING LOT.
5) ENSURE STORM WATER MAINT. SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP.
2)}
03/20/2017 SITE - Stormwater Follow-up Passed {Activity date: 03/20/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/02/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, NO TRACKOUT OR SEDIMENT NOTED ON ADJACENT PROPERTIES OR STREETS.} ; {Activity date: 02/24/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PAVING COMPLETED FOR SECTIONS OF SITE - DESITY AND COMPACTION TESTING RESULTS AVAILABLE IF NEEDED.
2) NO SIGNIFICANT STORM WATER CONCERS AT THIS TIME
3) ENSURE HC SLOPES AND PARKING AND ACCESS MEET ADA} ; {Activity date: 02/08/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/29/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SPECIFIC STORM WATER CONCERNS AT THIS TIME
2) PROTECT CATCH BASIN INLETS FROM SITE SOIL
3) STARTING ROUGH GRADING FOR PARKING AREA AND REMOVING STOCK PILES} ; {Activity date: 12/28/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - INSPECTION CANCELLED} ; {Activity date: 12/23/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) RAINING, NO SITE WORK.
2) SWEEP UP TRACKED SOIL AS NEEDED, NO OTHER STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/21/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) REPAIR SECTION OF SILT FENCE ALONG N. SIDE OF SITE IN 2 PLACES
2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
3) SWEEP UP TRACKED SOIL ROUTINELY} ; {Activity date: 12/14/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO STORM WATER CONCERNS AT THIS TIME, ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED
2) CONTRACTOR POURED FLOORS FOR CATCH BASINS AND MANHOLE/WORKING ON WALLS - INSTALLED PER PLAN} ; {Activity date: 12/08/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/02/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) INSPECTED UNDERGROUND RET BASIN, BASIN INSTALLED PER APPROVED PLANS
2) PROVIDE PICTURES OF CONNECTING OF TRUNK LINE AND LATERALS, AND TRANSITION POINS
- OK TO COVER
3) LOOKED AT STORM WATER SELF INSPECTIONS - OK} ; {Activity date: 11/29/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - WALKED THE SITE AND SEE THAT THE CONTRACTOR IS MAINTAING THE CONTROLS, AND THERE APPEARS TO BE NO TRACKOUT FROM THIS SITE.} ; {Activity date: 11/21/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/18/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) INSPECTED SILT FENCE INSTALLED ALONG NORTH SIDE OF SITE - INSTALLED PER PLAN
2) LOOKED AT WALL FOOTING ALONG WEST SIDE, INSTALLED PER APPROVED PLAN - OK TO COVER
3) RE-INSTALL STABILIZED CONSTRUCTION ENTRANCE WHEN APPLICABLE} ; {Activity date: 11/03/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
2) CALL FOR INSPECTION PRIOR TO INSTALL OF STORM PIPING AND DRAINAGE STRUCTURES
3) CALL FOR INSPECTION FOR ANY SITE QUESTIONS AND/OR CONCERNS} ; {Activity date: 10/31/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/12/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) WALKED SITE PERIMETER , SEDIEMNT CONTROLS IN PLACE
2) SELF INSPECTIONS HAVE BEEN PERFORMED PER APPROVED PLAN
3) SWEEP UP TRACLING ON A ROUTINE BASIS
4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
5) CALL FOR INSPECTION FOR ANY SITE QUESTIONS AND/OR CONCERNS, OR CHANGES}
04/27/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 04/27/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
04/27/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 04/27/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
04/27/2017 ENGR Grading Final Passed {Activity date: 04/27/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
04/27/2017 COT - ENGR - Signage Final Passed {Activity date: 04/27/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
05/04/2017 ENGR Engineering Final Passed {Activity date: 05/04/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/27/2017; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PARTIAL APPROVAL - FINAL NOT TO BE GIVEN UNTIL THE ITEMS BELOW ARE COMPLETED:
1) APPROVE THE FINAL GRADING INSPECTION FOR DP15-0194
2) PROVIDE A FINAL REVISED APPROVED PLAN FOR FINAL INSPECTION
3) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD}
05/04/2017 SITE - Stormwater Final Inspection Passed {Activity date: 05/04/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/27/2017; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - FILE A NOTICE OF TERMINATION WITH ADEQ}

Documents

File Name Document Type  
001_COVER SHEET_01 OF 45.TIF DEVELOPMENT PACKAGE VIEW
002_NOTES_02 OF 45.TIF DEVELOPMENT PACKAGE VIEW
003_EXISTING CONDITIONS / DEMOLITION - WEST_03 OF 45.TIF DEVELOPMENT PACKAGE VIEW
004_EXISTING CONDITIONS / DEMOLITION - EAST_04 OF 45.TIF DEVELOPMENT PACKAGE VIEW
005_OVERALL SITE_05 OF 45.TIF DEVELOPMENT PACKAGE VIEW
006_DETAILED SITE - WEST_06 OF 45.TIF DEVELOPMENT PACKAGE VIEW
007_DETAILED SITE - EAST_07 OF 45.TIF DEVELOPMENT PACKAGE VIEW
008_SITE LIGHTING_08 OF 45.TIF DEVELOPMENT PACKAGE VIEW
009_SITE LIGHTING DETAILS_09 OF 45.TIF DEVELOPMENT PACKAGE VIEW
010_OVERALL GRADING_10 OF 45.TIF DEVELOPMENT PACKAGE VIEW
011_DETAILED GRADING - WEST_11 OF 45.TIF DEVELOPMENT PACKAGE VIEW
012_DETAILED GRADING - EAST_12 OF 45.TIF DEVELOPMENT PACKAGE VIEW
013_PAVING_13 OF 45.TIF DEVELOPMENT PACKAGE VIEW
014_SCREENWALL / PROFILE_14 OF 45.TIF DEVELOPMENT PACKAGE VIEW
015_SITE DETAILS 01_15 OF 45.TIF DEVELOPMENT PACKAGE VIEW
016_SITE DETAILS 02_16 OF 45.TIF DEVELOPMENT PACKAGE VIEW
017_SITE DETAILS 03_17 OF 45.TIF DEVELOPMENT PACKAGE VIEW
018_SITE DETAILS 04_18 OF 45.TIF DEVELOPMENT PACKAGE VIEW
019_SITE DETAILS 05_19 OF 45.TIF DEVELOPMENT PACKAGE VIEW
020_SITE DETAILS 06_20 OF 45.TIF DEVELOPMENT PACKAGE VIEW
021_SITE DETAILS 07_21 OF 45.TIF DEVELOPMENT PACKAGE VIEW
022_SWPPP NOTES_22 OF 45.TIF DEVELOPMENT PACKAGE VIEW
023_SWPPP IMPLEMENTAION SEQUENCE / LIMITS OF WORK_23 OF 45.TIF DEVELOPMENT PACKAGE VIEW
024_PHASE 1 EROSION / SEDIMENT CONTROL_24 OF 45.TIF DEVELOPMENT PACKAGE VIEW
025_PHASE 2 EROSION / SEDIMENT CONTROL_25 OF 45.TIF DEVELOPMENT PACKAGE VIEW
026_SWPPP DETAILS 01_26 OF 45.TIF DEVELOPMENT PACKAGE VIEW
027_SWPPP DETAILS 02_27 OF 45.TIF DEVELOPMENT PACKAGE VIEW
028_SWPPP DETAILS 03_28 OF 45.TIF DEVELOPMENT PACKAGE VIEW
029_SWPPP DETAILS 04_29 OF 45.TIF DEVELOPMENT PACKAGE VIEW
030_SWPPP DETAILS 05_30 OF 45.TIF DEVELOPMENT PACKAGE VIEW
031_OVERALL UTILITY_31 OF 45.TIF DEVELOPMENT PACKAGE VIEW
032_STORM DRAIN PLAND / PROFILE A_32 OF 45.TIF DEVELOPMENT PACKAGE VIEW
033_STORM DRAIN PLAN / PROFILE B_33 OF 45.TIF DEVELOPMENT PACKAGE VIEW
034_STORM DRAIN PLAN / PROFILE C & D_34 OF 45.TIF DEVELOPMENT PACKAGE VIEW
035_ROOF DRAIN_35 OF 45.TIF DEVELOPMENT PACKAGE VIEW
036_STORM DRAIN DETAILS 01_36 OF 45.TIF DEVELOPMENT PACKAGE VIEW
037_STORM DRAIN DETAILS 02_37 OF 45.TIF DEVELOPMENT PACKAGE VIEW
038_STORM DRAIN DETAILS 03_38 OF 45.TIF DEVELOPMENT PACKAGE VIEW
039_LANDSCAPE_39 OF 45.TIF DEVELOPMENT PACKAGE VIEW
040_LANDSCAPE NOTES / DETAILS_40 OF 45.TIF DEVELOPMENT PACKAGE VIEW
041_LANDSCAPE DETAILS 01_41 OF 45.TIF DEVELOPMENT PACKAGE VIEW
042_LANDSCAPE DETAILS 02_42 OF 45.TIF DEVELOPMENT PACKAGE VIEW
043_IRRIGATION_43 OF 45.TIF DEVELOPMENT PACKAGE VIEW
044_IRRIGATION DETAILS / NOTES_44 OF 45.TIF DEVELOPMENT PACKAGE VIEW
045_RAINWATER HARVEST_45 OF 45.TIF DEVELOPMENT PACKAGE VIEW
WALMART DIFFERENTIAL GRADING NOTIFICATION TO PDSD PACKET.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
DP15-0194 WATER APPROVAL.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW