Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 08/11/2016 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by MRUSSO1 - 1) MET WITH SUPER, DISCUSSED STORM WATER INSTALL.
INSTALL PERIMETER SEDIMENT CONTROLS PER YOUR SWPPP
2) INSTALL AND USE A STBILIZED CONSTRUCTION ENTRANCE/EXIT
3) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP
4) INSTALL AND USE A CONCRETE WASH OUT ON SITE
5) POST A SIGNED COPY OF YOUR NOI AT ENTRANCE TO THE SITE
6) THE SITE WILL CHANGE WITH CONSTRUCTION AND THE SWPPP WILL CHANGE ACCORDINGLY |