Permit: DP15-0194

Parcel: 11304148A

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
05/04/2017 ENGR Engineering Final MRUSSO Approved Entered by DROBERT5 -
04/27/2017 ENGR Engineering Final MRUSSO Partial Approval Entered by DROBERT5 - PARTIAL APPROVAL - FINAL NOT TO BE GIVEN UNTIL THE ITEMS BELOW ARE COMPLETED: 1) APPROVE THE FINAL GRADING INSPECTION FOR DP15-0194 2) PROVIDE A FINAL REVISED APPROVED PLAN FOR FINAL INSPECTION 3) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD
05/04/2017 ENGR Engineering Final MRUSSO Approved Entered by DROBERT5 -
04/27/2017 ENGR Engineering Final MRUSSO Partial Approval Entered by DROBERT5 - PARTIAL APPROVAL - FINAL NOT TO BE GIVEN UNTIL THE ITEMS BELOW ARE COMPLETED: 1) APPROVE THE FINAL GRADING INSPECTION FOR DP15-0194 2) PROVIDE A FINAL REVISED APPROVED PLAN FOR FINAL INSPECTION 3) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD
01/04/2017 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by DROBERT5 - THE CONTRACTOR SCHEDULED THE WRONG INSPECTION, HE NEEDED TO SCHEDULE THE FOOTER INSPECTION FOR THE PERIMETER WALL. THIS WORK WAS INSPECTED BY BRUCE STEVENS TODAY.