| 03/20/2017 |
SITE - Stormwater Follow-up
|
MRUSSO |
Approved |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 03/02/2017 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by DROBERT5 - NO CONCERNS AT THIS TIME, NO TRACKOUT OR SEDIMENT NOTED ON ADJACENT PROPERTIES OR STREETS. |
| 02/24/2017 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) PAVING COMPLETED FOR SECTIONS OF SITE - DESITY AND COMPACTION TESTING RESULTS AVAILABLE IF NEEDED.
2) NO SIGNIFICANT STORM WATER CONCERS AT THIS TIME
3) ENSURE HC SLOPES AND PARKING AND ACCESS MEET ADA |
| 02/08/2017 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 12/29/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) NO SPECIFIC STORM WATER CONCERNS AT THIS TIME
2) PROTECT CATCH BASIN INLETS FROM SITE SOIL
3) STARTING ROUGH GRADING FOR PARKING AREA AND REMOVING STOCK PILES |
| 12/28/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - INSPECTION CANCELLED |
| 12/23/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) RAINING, NO SITE WORK.
2) SWEEP UP TRACKED SOIL AS NEEDED, NO OTHER STORM WATER CONCERNS AT THIS TIME |
| 12/21/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) REPAIR SECTION OF SILT FENCE ALONG N. SIDE OF SITE IN 2 PLACES
2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
3) SWEEP UP TRACKED SOIL ROUTINELY |
| 12/14/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) NO STORM WATER CONCERNS AT THIS TIME, ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED
2) CONTRACTOR POURED FLOORS FOR CATCH BASINS AND MANHOLE/WORKING ON WALLS - INSTALLED PER PLAN |
| 12/08/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 12/02/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by MRUSSO1 - 1) INSPECTED UNDERGROUND RET BASIN, BASIN INSTALLED PER APPROVED PLANS
2) PROVIDE PICTURES OF CONNECTING OF TRUNK LINE AND LATERALS, AND TRANSITION POINS
- OK TO COVER
3) LOOKED AT STORM WATER SELF INSPECTIONS - OK |
| 11/29/2016 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by DROBERT5 - WALKED THE SITE AND SEE THAT THE CONTRACTOR IS MAINTAING THE CONTROLS, AND THERE APPEARS TO BE NO TRACKOUT FROM THIS SITE. |
| 11/21/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by MRUSSO1 - NO STORM WATER CONCERNS AT THIS TIME |
| 11/18/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by MRUSSO1 - 1) INSPECTED SILT FENCE INSTALLED ALONG NORTH SIDE OF SITE - INSTALLED PER PLAN
2) LOOKED AT WALL FOOTING ALONG WEST SIDE, INSTALLED PER APPROVED PLAN - OK TO COVER
3) RE-INSTALL STABILIZED CONSTRUCTION ENTRANCE WHEN APPLICABLE |
| 11/03/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by MRUSSO1 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
2) CALL FOR INSPECTION PRIOR TO INSTALL OF STORM PIPING AND DRAINAGE STRUCTURES
3) CALL FOR INSPECTION FOR ANY SITE QUESTIONS AND/OR CONCERNS |
| 10/31/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 10/12/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by MRUSSO1 - 1) WALKED SITE PERIMETER , SEDIEMNT CONTROLS IN PLACE
2) SELF INSPECTIONS HAVE BEEN PERFORMED PER APPROVED PLAN
3) SWEEP UP TRACLING ON A ROUTINE BASIS
4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
5) CALL FOR INSPECTION FOR ANY SITE QUESTIONS AND/OR CONCERNS, OR CHANGES |