Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
1425 W IRVINGTON RD
Apply Date:
06/10/2015
Applicant:
Description:
TENTATIVE PLAT/FLD - OAKMORE SIX, LOTS 1-68

Permit Reviews

Permit Number - DP15-0091
Permit Status: Complete
Permit Description: TENTATIVE PLAT/FLD - OAKMORE SIX, LOTS 1-68
Start Date Submittal Complete Date Status  
06/10/2015 DEV PKG - OK TO SUBMIT 06/10/2015 COMPLETED Review Details
06/10/2015 TENTATIVE PLAT REVIEW 07/13/2015 COMPLETED Review Details
08/20/2015 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 09/24/2015 COMPLETED Review Details
10/28/2015 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 11/05/2015 ACTIVE Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0091
Permit Description: TENTATIVE PLAT/FLD - OAKMORE SIX, LOTS 1-68
Total Completed Inspections - 10
Date Description Inspector Results Comments
11/17/2015 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 11/13/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH THE CONTRACTOR AND DISCUSSED WHAT THEY WILL BE DOING ONCE THIS SITE IS READY. THE SITE WILL BE CLEARED AND RIPPED TO ESTABLISH WHAT IF THE CONSTRUCTION FILL THAT THEY WILL NEED AT THIS TIME TO THE WORK THAT IS INSPECTED. I HAVE ASKED THE CONTRACTOR TO CONTACT RON LE DONNE AND ARREANGE FOR ANOTHER PRE-CON SO HE CAN TELL THEM WHAT HE IS EXPECTING ONCE THE WORK STARTS.} ; {Activity date: 11/17/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
03/13/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 03/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
03/13/2018 SITE - SWPPP Correction Notice Passed {Activity date: 03/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/15/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - TRACK OUT NOTED YESTERDAY HAS BEEN CLEANED UP AT THIS TIME.} ; {Activity date: 04/14/2016; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - TRACKOUT NOTED ON IRVINGTON WEST OF THE SANTA CRUZ}
03/13/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 03/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
03/13/2018 SITE - Stormwater Follow-up Passed {Activity date: 03/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/16/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 01/18/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 12/21/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONERNS AT THIS TIME.} ; {Activity date: 11/21/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 11/15/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 10/06/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/17/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 07/25/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - CALLED JAY KNOLL ABOUT INSTALLING SWPPP CONTROLS IN STREET AND PROVIDE WASH OUT.} ; {Activity date: 07/13/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 06/22/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - ON CONCERNS AT THIS TIME.} ; {Activity date: 05/03/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS .} ; {Activity date: 04/14/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 03/31/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 03/04/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS .} ; {Activity date: 03/01/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 02/29/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS NO ACTIVITY ON SITE.} ; {Activity date: 02/23/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 02/19/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - REPAIRS HAVE BEEN MADE .} ; {Activity date: 02/11/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - TALKED TO JAY LAST WEEK ABOUT REPAIRS TO CONTROLS. REPAIRS STILL HAVE NOT BEEN MADE.} ; {Activity date: 02/03/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - CALLED JAY KNOLL ABOUT NEEDED REPAIRS TO SWPPP CONTROS.}
03/13/2018 ENGR Grading Final Passed {Activity date: 03/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
03/13/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 03/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 11/20/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH GRADING CONTRACTOR TO INSTALL ENTRANCE TO SITE PER AP PLANS. SWPPP CONTROLES OK.}
03/13/2018 COT - ENGR - Signage Final Passed {Activity date: 03/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/17/2018 ENGR Engineering Final Passed {Activity date: 07/17/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
05/16/2019 SITE - Stormwater Final Inspection Passed {Activity date: 05/16/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }

Documents

File Name Document Type  
001_C0.1.TIF DEVELOPMENT PACKAGE VIEW
002_C0.2.TIF DEVELOPMENT PACKAGE VIEW
003_C0.3.TIF DEVELOPMENT PACKAGE VIEW
004_C0.4.TIF DEVELOPMENT PACKAGE VIEW
005_C1.1.TIF DEVELOPMENT PACKAGE VIEW
006_C1.2.TIF DEVELOPMENT PACKAGE VIEW
007_C1.3.TIF DEVELOPMENT PACKAGE VIEW
008_C2.1.TIF DEVELOPMENT PACKAGE VIEW
009_C2.2.TIF DEVELOPMENT PACKAGE VIEW
010_C2.3.TIF DEVELOPMENT PACKAGE VIEW
011_C3.1.TIF DEVELOPMENT PACKAGE VIEW
012_C3.2.TIF DEVELOPMENT PACKAGE VIEW
013_C3.3.TIF DEVELOPMENT PACKAGE VIEW
014_C3.4.TIF DEVELOPMENT PACKAGE VIEW
015_C3.5.TIF DEVELOPMENT PACKAGE VIEW
016_C3.6.TIF DEVELOPMENT PACKAGE VIEW
017_C3.7.TIF DEVELOPMENT PACKAGE VIEW
018_L1.0.TIF DEVELOPMENT PACKAGE VIEW
019_L1.1.TIF DEVELOPMENT PACKAGE VIEW
020_L1.2.TIF DEVELOPMENT PACKAGE VIEW
021_L1.3.TIF DEVELOPMENT PACKAGE VIEW
022_L1.4.TIF DEVELOPMENT PACKAGE VIEW
023_L1.5.TIF DEVELOPMENT PACKAGE VIEW
024_L2.0.TIF DEVELOPMENT PACKAGE VIEW
025_L2.1.TIF DEVELOPMENT PACKAGE VIEW
026_L2.2.TIF DEVELOPMENT PACKAGE VIEW
027_L2.3.TIF DEVELOPMENT PACKAGE VIEW
028_L2.4.TIF DEVELOPMENT PACKAGE VIEW
029_L2.5.TIF DEVELOPMENT PACKAGE VIEW
030_L3.0.TIF DEVELOPMENT PACKAGE VIEW
031_L3.1.TIF DEVELOPMENT PACKAGE VIEW
032_L3.2.TIF DEVELOPMENT PACKAGE VIEW
033_L3.3.TIF DEVELOPMENT PACKAGE VIEW
034_L3.4.TIF DEVELOPMENT PACKAGE VIEW
035_L4.0.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW
TW DP15-0091.PDF DOCUMENTS VIEW
SWG REVIEW FOROAKMORE SIX TENTATIVE PLAT DP15-0091.PDF DOCUMENTS VIEW
2015-05 SWG TUCSON DISTRICT CONTACT INFO-MAP-STANDBY.PDF DOCUMENTS VIEW
PAG DP15-0091 OAKMORE SIX TENTATIVE PLAT CALC (1).PDF DOCUMENTS VIEW
PAG DP15-0091 OAKMORE SIX TENTATIVE PLAT CALC (2).PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
ARCHITECTURAL VARIATION PLAN.PDF DOCUMENTS VIEW
DESIGN PROFESIONAL LETTER RGA OAKMORE 6 AVP DP15-0091 4-5-2016.PDF DOCUMENTS VIEW