Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/13/2018 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 03/13/2018 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 03/13/2018 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 03/13/2018 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 01/31/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WORKING ON HOUSE S AND HOUSE PADS. |
| 04/14/2016 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - CREW WORKING ON THE INST6ALLATION OF THE ELECTRICAL LINES AT THIS TIME IN THE ROADWAY PORTIONS. TALKED WITH SEAN RICH ABOUT THE DIRT WORK THAT IS HAPPENING ON THIS SITE AND THE MINOR TRACKOUT THAT THEY HAVE ON IRVINGTON, IT WILL BE CLEANED UP BY THE END OF THE DAY TOMORROW. |
| 12/02/2015 |
ENGR Grading Final |
RDLD |
Continued |
Entered by DROBERT5 - CREW IS WORKING ON GRADING THE NORTH END OF THE SITE SOUTH OF IRVINGTON. |
| 04/05/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - INSPECTION PER HIGH LIGHTS ON AP PLANS. |
| 04/04/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - STORM DRAIN PIPING PER HIGH LIGHTS ON PAGE 9 OF 11. |
| 03/16/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |