Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
2720 E RIVER RD
Address NEW:
2720 E RIVER RD
Apply Date:
03/11/2015
Applicant:
Tanya Washington
Description:
GRADING, DRAINAGE, PAVING SITE IMPROVEMENTS/HACIENDAS AT RIVERRevison #1 to Water plans (sheets

Permit Reviews

Permit Number - DP15-0042
Permit Status: Complete
Permit Description: GRADING, DRAINAGE, PAVING SITE IMPROVEMENTS/HACIENDAS AT RIVERRevison #1 to Water plans (sheets
Start Date Submittal Complete Date Status  
01/26/2017 DEV PKG - REVISION 02/27/2017 COMPLETED Review Details
03/12/2015 DEV PKG 07/21/2015 COMPLETED Review Details
08/15/2017 DEV PKG - REVISION 09/26/2017 COMPLETED Review Details
09/26/2017 DEV PKG - REVISION 09/28/2017 ACTIVE Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0042
Permit Description: GRADING, DRAINAGE, PAVING SITE IMPROVEMENTS/HACIENDAS AT RIVERRevison #1 to Water plans (sheets
Total Completed Inspections - 8
Date Description Inspector Results Comments
10/05/2015 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/05/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PRE-CON MEETING ACCOMPLISHED
2)APPROVED NPPO ON SITE
3) IDENTIFY PLANTS THAT CAN NOT BE PRESERVED IN PLACE SO I CAN GET APPROVAL FROM REVIEWER
4) IMPLEMENT YUOR SWPPP PRIOR TO CONSTRUCTION
5) CALL FOR INSPECTION WHEN SEDIMENT CONTROLS ARE IN PLACE FOR APPROVAL}
10/14/2015 SITE - Stormwater Setup and Controls Passed {Activity date: 10/14/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIEMNT CONTROLS HAVE BEEN INSTALLED ALONG THE PERIMETER PER THE SWPPP
2) A STABILIZED CONSTRUCTION ENTRANCE/EXIT IS IN PLACE
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
4) INSTALL AND USE A CONCRETE WASH OUT WHEN APPLICABLE
5) YOUR SWPPP AUTHORIZATION NUMBER HAS BEEN POSTED AT THE ENTRANCE TO THE SITE} ; {Activity date: 10/13/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONTACT} ; {Activity date: 10/08/2015; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SOME STORM WATER SEDIMENT CONTROLS ARE EXISTING, HOWEVER SEDIMENT CONTROLS MUST BE INSTALLED PER YOUR APPROVED SWPPP.

NO CONTACT ON SITE, WILL RE-INSPECT}
01/31/2017 SITE - Stormwater Follow-up Passed {Activity date: 01/31/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 11/10/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/10/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) PROTECT CATCH BASINS FROM SEDIMENT FORM CONSTRUCTION
2) LOOKED AT TRASH ENCLOSURE FOOTINGS AND RE-BAR LAYOUT FOR SE CORNER - #4 @ 32" OC / 2-#4 CONTINUOUS IN BOTTOM} ; {Activity date: 06/03/2016; Status: Continued; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - } ; {Activity date: 03/08/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) LOOKED AT FINISHED SE CATCH BASIN AND SOUTH CATCH BASIN AND SMALL NORTH SIDE BASIN.
2) MAINTAIN PERIMETER SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION.
3) NEED A COPY OF TEST DONE FOR CONCRETE FOR PBASIN POUR
4) NEED PICTURE OF SE BASIN FULLY FORMED
5) NEED APPROVAL FROM THE ENG. OF RECORD FOR CHANGES MADE TO EACH BASIN.} ; {Activity date: 03/04/2016; Status: Continued; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - RE-ESTABLISH SEDIMENT CONTROLS ALONG THE PERIMETER} ; {Activity date: 03/02/2016; Status: Continued; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/26/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/25/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/17/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME FOR THIS SITE.} ; {Activity date: 01/15/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ANY UNDERGROUND STORM WATER DRAINAGE CONSTRUCTION, CALL FOR INSPECTION PRIOR TO COVER.
2) ENSURE YOU COMPLY WITH YOUR STORM WATER PLAN AND PERMIT.
3) STORM DRAIN PIPE INSTALL TIE-INTO RILLITO WASH/ 30" RCP AT SE CORNER OF SITE AND 24" RCP AT SW CORNER: CONTACT ANDY DENAUER @ PIMA COUNTY REGIONAL FLOOD CONTROL FOR DETAILS.

4) CONCERNS ABOUT LACK OF BEDDING AND COMPACTION FOR RCP INSTALL?} ; {Activity date: 01/13/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
ENSURE COMPLIANCE WITH YOUR SWPPP.} ; {Activity date: 01/07/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/06/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/23/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE YOU FOLLOW REQUIREMENTS UNDER YOUR STORM WATER PERMIT AND APPROVED STORM WATER PLAN.} ; {Activity date: 11/03/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SPOKE WITH SUPERINTENDENT ABOUT SWEEPING UP OF TRACKED SOIL OFF OF RIVER ROAD DUE TO TRUCK TRAFFIC}
01/31/2017 ENGR Grading Final Passed {Activity date: 01/31/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
01/31/2017 SITE - Stormwater Final Inspection Passed {Activity date: 01/31/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - FILE A NOTICE OF TERMINATION WITH ADEQ} ; {Activity date: 01/13/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - FILE A NOTICE OF TERMINATION WHITH ADEQ WHEN THE SITE IS STABILIZED}
03/09/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 03/09/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 01/31/2017; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - EAST SIDE OF SITE:

1) MISSING MESQUITE SHEET#3 NEXT TO WALKING PATH
2) MISSING 1 MESQUITE/ 2 AZ WALNUT TREES SHEET #4 WALKING @ BRIDGE}
07/15/2020 ENGR Engineering Final Passed {Activity date: 07/15/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/01/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH MEMBERS FROM WEITZ AND TUCSON ASPHALT AND RECHECKED THE PARKING SPACES AND ACCESS AISLES, THEY ALL MEET THE LESS THAN 2% CROS SLOPES. ALSO THE SIDEWALK HAS BEEN REPOURED AND MEETS THE CROSS SLOPES.} ; {Activity date: 02/22/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET ONSITE BEFOR 9:30 AND CALIBRATED MY LEVEL WITH THE DEVELOPER TO ENSURE THE BEST MEASUREMENTS POSSIBLE. ALL OF THE AREAS WERE RECHECKED AND VERIFIED BY THE CONTRACTOR THE THEY WERE OVER THE MAXIMUM TOLERANCE ALLOWED.
THEY WILL WORK ON RESCHEDULING WORK FOR THESE AREAS AND WILL LET ME KNOW WHEN THE WORK IS TO BE PERFORMED. I RE-EVALUATED THE SIGNS FOR THESE LOCATIONS AND WILL VERIFY WITH CLAYTON THAT THEY ALL SHOULD BE OKAY AT THE 5 FOOT HEIGHT SINCE THEY APPEAR TO BE OUTSIDE OF PEDESTRIAN ACCESS AREAS.
THE OTHER ISSUE NOTED ONSITE IS THE BARRIER RAIL ALONG THE WASH WERE THE PATH/WALK AREA IS MADE OUT OF PAVEMENT OR CONCRETE. ARE ANY OF THESE AREAS REQUIRED TO HAVE HANDICAP HANDRAIL OF JUST THE SAFETY BARRIER.
ANOTHER ISSUE THAT WILL NEED TO BE CHECKED ON THE APPROVED PLANS IS AN AREA WHERE A EQUESTRIAN PATH CROSSES OVER THE SIDEWALK AND ROADWAY ONTO A D.G. PATHWAY THAT LEADS TO A PEDESTRIAN PATHWAY ALONG THE RIVERS EDGE.} ; {Activity date: 02/21/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - JIMMY CONTACTED ME AND ASKED TO HAVE AN ON SITE MEETING TOMORROW WITH THEIR PERSONNEL AND THE SUBCONTRACTORS THAT PERFORMED THE WORK. WE WILL MEET ON SITE AT 9:30 OR 10:00 AND WALK THE SITE AGAIN SHOWING THEM WHERE THE SITE NEEDS TO BE REPAIRED.} ; {Activity date: 02/21/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH JIMMY FROM WEITZ AND LOOKED OVER THE HANDICAP PARKING SPACES, ACCESS AISLES, AND PEDESTRIAN STRIPED CROSSINGS. IT HAS BEEN DETERMINED THAT THESE AREAS DO NOT MEET THE MAXIMUM REQUIREMENTS FOR RUNNING SLOPES AND/OR CROSS SLOPES OF 2%. THESE WILL NEED TO BE REPAIRED PRIOR TO ASKING FOR THE FINAL ON BUILDING #6 OR FOR THE CLOSURE OF THE DEVELOPMENT PACKAGE.} ; {Activity date: 01/13/2017; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE A CITY APPROVED PLAN THAT SHOWS WHAT WAS CONSTRUCTED, FOR FINAL INSPECTION
2) PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECORD, STATING THAT THE SITE WAS SUBSTANTIALLY CONSTRUCTED PER THE APPROVED PLANS
3) CALL FOR FINAL INSPECTION} ; {Activity date: 09/13/2016; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - FOR BLDG#2
1) SEPARATE REMAINING CONSTRUCTION FROM PUBLIC ACCESS
2) PROVIDE PARKING AND ACCESS TO BLDG TO INCLUDE HC PARKING AND ACCESS.
OVERALL SITE:
3) PRIOR TO FINAL APPROVAL PROVIDE AN APPROVED PLAN THAT SHOW ANY AND ALL CHANGES MADE.
4) PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECORD} ; {Activity date: 03/02/2016; Status: Prior to Final Inspectn; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - PRIOR TO FINAL APPROVAL, PROVIDE AN AS-BUILT PLAN SHOWING CHANGES MADE TO THE SIZE AND DIMENSIONS OF THE STORM WATER CATCH BASINS FROM THE ENG OF RECORD.} ; {Activity date: 01/13/2016; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MAJORITY OF STORM PIPE ALONG THE SW SIDE OF THE SITE WAS INSTALLED WITHOUT INSPECTION, THEREFORE PRIOR TO FINAL APPROVAL, PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE PIPE WAS INSTALLED PER THE APPROVED PLANS.}
08/05/2020 RSBU - Building Final Passed {Activity date: 08/05/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
DP14-0042 SEWER ACCEPTANCE.PDF ASSURANCES VIEW
001_PC PERMIT APPROVAL LETTER.TIF DEVELOPMENT PACKAGE VIEW
002_SHEET 1 OF 4.TIF DEVELOPMENT PACKAGE VIEW
003_SHEET 2 OF 4.TIF DEVELOPMENT PACKAGE VIEW
004_SHEET 3 OF 4.TIF DEVELOPMENT PACKAGE VIEW
005_SHEET 4 OF 4.TIF DEVELOPMENT PACKAGE VIEW
001_PC PERMIT APPROVAL LETTERS.TIF DEVELOPMENT PACKAGE VIEW
002_SHEET 1 OF 6.TIF DEVELOPMENT PACKAGE VIEW
003_SHEET 2 OF 6.TIF DEVELOPMENT PACKAGE VIEW
004_SHEET 3 OF 6.TIF DEVELOPMENT PACKAGE VIEW
005_SHEET 4 OF 6.TIF DEVELOPMENT PACKAGE VIEW
006_SHEET 5 OF 6.TIF DEVELOPMENT PACKAGE VIEW
007_SHEET 6 OF 6.TIF DEVELOPMENT PACKAGE VIEW
001_PC PERMIT APPROVAL LETTER.TIF DEVELOPMENT PACKAGE VIEW
002_SHEET 1 OF 6.TIF DEVELOPMENT PACKAGE VIEW
003_SHEET 2 OF 6.TIF DEVELOPMENT PACKAGE VIEW
004_SHEET 3 OF 6.TIF DEVELOPMENT PACKAGE VIEW
005_SHEET 4 OF 6.TIF DEVELOPMENT PACKAGE VIEW
006_SHEET 5 OF 6.TIF DEVELOPMENT PACKAGE VIEW
007_SHEET 6 OF 6.TIF DEVELOPMENT PACKAGE VIEW
001_PC PERMIT APPROVAL LETTER.TIF DEVELOPMENT PACKAGE VIEW
001_SHEET 1 OF 4.TIF DEVELOPMENT PACKAGE VIEW
002_SHEET 2 OF 4.TIF DEVELOPMENT PACKAGE VIEW
003_SHEET 3 OF 4.TIF DEVELOPMENT PACKAGE VIEW
004_SHEET 4 OF 4.TIF DEVELOPMENT PACKAGE VIEW
001_COVER SHEET_1 OF 50.TIF DEVELOPMENT PACKAGE VIEW
002_GENERAL / PERMITTING NOTES_2 OF 50.TIF DEVELOPMENT PACKAGE VIEW
003_SITE EXHIBITS_3 OF 50.TIF DEVELOPMENT PACKAGE VIEW
004_SITE PLAN SHEETS_4 OF 50.TIF DEVELOPMENT PACKAGE VIEW
005_SITE PLAN SHEETS_5 OF 50.TIF DEVELOPMENT PACKAGE VIEW
006_SITE PLAN SHEETS_6 OF 50.TIF DEVELOPMENT PACKAGE VIEW
007_SITE PLAN SHEETS_7 OF 50.TIF DEVELOPMENT PACKAGE VIEW
008_SITE PLAN SHEETS_8 OF 50.TIF DEVELOPMENT PACKAGE VIEW
009_HORIZONTAL CONTROL SHEET_9 OF 50.TIF DEVELOPMENT PACKAGE VIEW
010_GENERAL GRADING / DRAINAGE /PAVING NOTES_10 OF 47.TIF DEVELOPMENT PACKAGE VIEW
011_GRADING / DRAINAGE / PAVING VIEW SHEETS_11 OF 50.TIF DEVELOPMENT PACKAGE VIEW
012_GRADING / DRAINAGE / PAVING VIEW SHEETS_12 OF 50.TIF DEVELOPMENT PACKAGE VIEW
013_GRADING / DRAINAGE / PAVING VIEW SHEETS_13 OF 50.TIF DEVELOPMENT PACKAGE VIEW
014_GRADING / DRAINAGE / PAVING VIEW SHEETS_14 OF 50.TIF DEVELOPMENT PACKAGE VIEW
015_GRADING / DRAINAGE / PAVING VIEW SHEETS_15 OF 50.TIF DEVELOPMENT PACKAGE VIEW
016_COURTYARD GRADING / DRAINAGE SHEETS_16 OF 50.TIF DEVELOPMENT PACKAGE VIEW
017_COURTYARD GRADING / DRAINAGE SHEETS_17 OF 50.TIF DEVELOPMENT PACKAGE VIEW
018_COURTYARD GRADING / DRAINAGE SHEETS_18 OF 50.TIF DEVELOPMENT PACKAGE VIEW
019_DRAINAGE CORRIDOR / PROFILE SHEETS_19 OF 50.TIF DEVELOPMENT PACKAGE VIEW
020_DRAINAGE CORRIDOR / PROFILE SHEETS_20 OF 50.TIF DEVELOPMENT PACKAGE VIEW
021_STORMDRAIN / PROFILE SHEETS_21 OF 50.TIF DEVELOPMENT PACKAGE VIEW
022_STORMDRAIN / PROFILE SHEETS_22 OF 50.TIF DEVELOPMENT PACKAGE VIEW
023_STORMDRAIN / PROFILE SHEETS_23 OF 50.TIF DEVELOPMENT PACKAGE VIEW
024_SITE UTILITY SHEET_24 OF 50.TIF DEVELOPMENT PACKAGE VIEW
025_MASTER KEYNOTE SHEET_25 OF 50.TIF DEVELOPMENT PACKAGE VIEW
026_DETAIL SHEET_26 OF 50.TIF DEVELOPMENT PACKAGE VIEW
027_DETAIL SHEET_27 OF 50.TIF DEVELOPMENT PACKAGE VIEW
028_DETAIL SHEET_28 OF 50.TIF DEVELOPMENT PACKAGE VIEW
029_DETAIL SHEET_29 OF 50.TIF DEVELOPMENT PACKAGE VIEW
030_DETAIL SHEET_30 OF 50.TIF DEVELOPMENT PACKAGE VIEW
031_DETAIL SHEET_31 OF 50.TIF DEVELOPMENT PACKAGE VIEW
032_DETAIL SHEET_32 OF 50.TIF DEVELOPMENT PACKAGE VIEW
033_DETAIL SHEET_33 OF 50.TIF DEVELOPMENT PACKAGE VIEW
034_DETAIL SHEET_34 OF 50.TIF DEVELOPMENT PACKAGE VIEW
035_DETAIL SHEET_35 OF 50.TIF DEVELOPMENT PACKAGE VIEW
036_DETAIL SHEET_36 OF 50.TIF DEVELOPMENT PACKAGE VIEW
037_DETAIL SHEET_37 OF 50.TIF DEVELOPMENT PACKAGE VIEW
038_DETAIL SHEETS_38 OF 50.TIF DEVELOPMENT PACKAGE VIEW
039_DETAIL SHEETS_39 OF 50.TIF DEVELOPMENT PACKAGE VIEW
040_DETAIL SHEETS_40 OF 50.TIF DEVELOPMENT PACKAGE VIEW
041_DETAIL SHEETS_41 OF 50.TIF DEVELOPMENT PACKAGE VIEW
042_DETAIL SHEETS_42 OF 50.TIF DEVELOPMENT PACKAGE VIEW
043_DETAIL SHEETS_43 OF 50.TIF DEVELOPMENT PACKAGE VIEW
044_STRUCTURAL DETAIL SHEETS_44 OF 50.TIF DEVELOPMENT PACKAGE VIEW
045_STRUCTURAL DETAIL SHEETS_45 OF 50.TIF DEVELOPMENT PACKAGE VIEW
046_STRUCTURAL DETAIL SHEETS_46 OF 50.TIF DEVELOPMENT PACKAGE VIEW
047_STRUCTURAL DETAIL SHEETS_47 OF 50.TIF DEVELOPMENT PACKAGE VIEW
045_DETAIL SHEETS_48 OF 50.TIF DEVELOPMENT PACKAGE VIEW
046_DETAIL SHEETS_49 OF 50.TIF DEVELOPMENT PACKAGE VIEW
047_DETAIL SHEETS_50 OF 50.TIF DEVELOPMENT PACKAGE VIEW
048_COVER SHEET L-1_1 OF 10.TIF DEVELOPMENT PACKAGE VIEW
049_PLANT INVENTORY AERIAL / NATIVE PLANT INVENTORY L-2_2 OF 10.TIF DEVELOPMENT PACKAGE VIEW
050_LANDSCAPE L-3_3 OF 10.TIF DEVELOPMENT PACKAGE VIEW
051_LANDSCAPE L-3 TO L-5_4 OF 10.TIF DEVELOPMENT PACKAGE VIEW
052_LANDSCAPE L-5_5 OF 10.TIF DEVELOPMENT PACKAGE VIEW
053_IRRIGATION L-6_6 OF 10.TIF DEVELOPMENT PACKAGE VIEW
054_IRRIGATION L-7_7 OF 10.TIF DEVELOPMENT PACKAGE VIEW
055_IRRIGATION L-8_8 OF 10.TIF DEVELOPMENT PACKAGE VIEW
056_LANDSCAPE LEGEND L-9_9 OF 10.TIF DEVELOPMENT PACKAGE VIEW
057_CONSTRUCTION DETAILS L-10_10 OF 10.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW
SIDEWALKEMAIL.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW