Permit: DP15-0042

Parcel: 10824008F


Addresses:

2720 E RIVER RD


Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP15-0042

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
01/31/2017 SITE - Stormwater Follow-up MRUSSO Approved Entered by DROBERT5 -
11/10/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
06/10/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - 1) PROTECT CATCH BASINS FROM SEDIMENT FORM CONSTRUCTION 2) LOOKED AT TRASH ENCLOSURE FOOTINGS AND RE-BAR LAYOUT FOR SE CORNER - #4 @ 32" OC / 2-#4 CONTINUOUS IN BOTTOM
06/03/2016 SITE - Stormwater Follow-up MRUSSO1 Continued Entered by MRUSSO1 -
03/08/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - 1) LOOKED AT FINISHED SE CATCH BASIN AND SOUTH CATCH BASIN AND SMALL NORTH SIDE BASIN. 2) MAINTAIN PERIMETER SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION. 3) NEED A COPY OF TEST DONE FOR CONCRETE FOR PBASIN POUR 4) NEED PICTURE OF SE BASIN FULLY FORMED 5) NEED APPROVAL FROM THE ENG. OF RECORD FOR CHANGES MADE TO EACH BASIN.
03/04/2016 SITE - Stormwater Follow-up MRUSSO1 Continued Entered by MRUSSO1 - RE-ESTABLISH SEDIMENT CONTROLS ALONG THE PERIMETER
03/02/2016 SITE - Stormwater Follow-up MRUSSO1 Continued Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
02/26/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
02/25/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - NO STORM WATER CONCERNS AT THIS TIME
02/17/2016 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME FOR THIS SITE.
01/15/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) ANY UNDERGROUND STORM WATER DRAINAGE CONSTRUCTION, CALL FOR INSPECTION PRIOR TO COVER. 2) ENSURE YOU COMPLY WITH YOUR STORM WATER PLAN AND PERMIT. 3) STORM DRAIN PIPE INSTALL TIE-INTO RILLITO WASH/ 30" RCP AT SE CORNER OF SITE AND 24" RCP AT SW CORNER: CONTACT ANDY DENAUER @ PIMA COUNTY REGIONAL FLOOD CONTROL FOR DETAILS. 4) CONCERNS ABOUT LACK OF BEDDING AND COMPACTION FOR RCP INSTALL?
01/13/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. ENSURE COMPLIANCE WITH YOUR SWPPP.
01/07/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
01/06/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
12/23/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - ENSURE YOU FOLLOW REQUIREMENTS UNDER YOUR STORM WATER PERMIT AND APPROVED STORM WATER PLAN.
11/03/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - SPOKE WITH SUPERINTENDENT ABOUT SWEEPING UP OF TRACKED SOIL OFF OF RIVER ROAD DUE TO TRUCK TRAFFIC