Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP15-0042
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2020 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
| 03/01/2017 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by DROBERT5 - MET WITH MEMBERS FROM WEITZ AND TUCSON ASPHALT AND RECHECKED THE PARKING SPACES AND ACCESS AISLES, THEY ALL MEET THE LESS THAN 2% CROS SLOPES. ALSO THE SIDEWALK HAS BEEN REPOURED AND MEETS THE CROSS SLOPES. |
| 02/22/2017 | ENGR Engineering Final | DROBERTS | Correction Required | Entered by DROBERT5 - MET ONSITE BEFOR 9:30 AND CALIBRATED MY LEVEL WITH THE DEVELOPER TO ENSURE THE BEST MEASUREMENTS POSSIBLE. ALL OF THE AREAS WERE RECHECKED AND VERIFIED BY THE CONTRACTOR THE THEY WERE OVER THE MAXIMUM TOLERANCE ALLOWED. THEY WILL WORK ON RESCHEDULING WORK FOR THESE AREAS AND WILL LET ME KNOW WHEN THE WORK IS TO BE PERFORMED. I RE-EVALUATED THE SIGNS FOR THESE LOCATIONS AND WILL VERIFY WITH CLAYTON THAT THEY ALL SHOULD BE OKAY AT THE 5 FOOT HEIGHT SINCE THEY APPEAR TO BE OUTSIDE OF PEDESTRIAN ACCESS AREAS. THE OTHER ISSUE NOTED ONSITE IS THE BARRIER RAIL ALONG THE WASH WERE THE PATH/WALK AREA IS MADE OUT OF PAVEMENT OR CONCRETE. ARE ANY OF THESE AREAS REQUIRED TO HAVE HANDICAP HANDRAIL OF JUST THE SAFETY BARRIER. ANOTHER ISSUE THAT WILL NEED TO BE CHECKED ON THE APPROVED PLANS IS AN AREA WHERE A EQUESTRIAN PATH CROSSES OVER THE SIDEWALK AND ROADWAY ONTO A D.G. PATHWAY THAT LEADS TO A PEDESTRIAN PATHWAY ALONG THE RIVERS EDGE. |
| 02/21/2017 | ENGR Engineering Final | DROBERTS | Correction Required | Entered by DROBERT5 - JIMMY CONTACTED ME AND ASKED TO HAVE AN ON SITE MEETING TOMORROW WITH THEIR PERSONNEL AND THE SUBCONTRACTORS THAT PERFORMED THE WORK. WE WILL MEET ON SITE AT 9:30 OR 10:00 AND WALK THE SITE AGAIN SHOWING THEM WHERE THE SITE NEEDS TO BE REPAIRED. |
| 02/21/2017 | ENGR Engineering Final | DROBERTS | Correction Required | Entered by DROBERT5 - MET WITH JIMMY FROM WEITZ AND LOOKED OVER THE HANDICAP PARKING SPACES, ACCESS AISLES, AND PEDESTRIAN STRIPED CROSSINGS. IT HAS BEEN DETERMINED THAT THESE AREAS DO NOT MEET THE MAXIMUM REQUIREMENTS FOR RUNNING SLOPES AND/OR CROSS SLOPES OF 2%. THESE WILL NEED TO BE REPAIRED PRIOR TO ASKING FOR THE FINAL ON BUILDING #6 OR FOR THE CLOSURE OF THE DEVELOPMENT PACKAGE. |
| 01/13/2017 | ENGR Engineering Final | MRUSSO | Prior to Final Inspectn | Entered by DROBERT5 - 1) PROVIDE A CITY APPROVED PLAN THAT SHOWS WHAT WAS CONSTRUCTED, FOR FINAL INSPECTION 2) PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECORD, STATING THAT THE SITE WAS SUBSTANTIALLY CONSTRUCTED PER THE APPROVED PLANS 3) CALL FOR FINAL INSPECTION |
| 09/13/2016 | ENGR Engineering Final | MRUSSO | Prior to Final Inspectn | Entered by MRUSSO1 - FOR BLDG#2 1) SEPARATE REMAINING CONSTRUCTION FROM PUBLIC ACCESS 2) PROVIDE PARKING AND ACCESS TO BLDG TO INCLUDE HC PARKING AND ACCESS. OVERALL SITE: 3) PRIOR TO FINAL APPROVAL PROVIDE AN APPROVED PLAN THAT SHOW ANY AND ALL CHANGES MADE. 4) PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECORD |
| 03/02/2016 | ENGR Engineering Final | MRUSSO1 | Prior to Final Inspectn | Entered by MRUSSO1 - PRIOR TO FINAL APPROVAL, PROVIDE AN AS-BUILT PLAN SHOWING CHANGES MADE TO THE SIZE AND DIMENSIONS OF THE STORM WATER CATCH BASINS FROM THE ENG OF RECORD. |
| 01/13/2016 | ENGR Engineering Final | MRUSSO | Prior to Final Inspectn | Entered by DROBERT5 - MAJORITY OF STORM PIPE ALONG THE SW SIDE OF THE SITE WAS INSTALLED WITHOUT INSPECTION, THEREFORE PRIOR TO FINAL APPROVAL, PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE PIPE WAS INSTALLED PER THE APPROVED PLANS. |